Filter interviews by
Top trending discussions
I applied via Walk-in
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M-25 Grade concrete is commonly used in construction projects.
The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).
The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.
F...
The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.
The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.
Standard brick sizes are commonly used in construction.
For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:
- ...
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
What type of work termite tretment.
I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.
I have 5 years of experience working as a Site Supervisor in construction projects.
5 years of experience as a Site Supervisor
Managed multiple construction projects simultaneously
Ensured adherence to safety regulations and project timelines
Coordinated with subcontractors and communicated with clients
Implemented cost-saving measures without compromising quality
Yes, I am always open to change and adapt to new situations in order to improve efficiency and effectiveness.
I believe in continuous improvement and am willing to change my approach if it leads to better results
I am open to feedback and suggestions from team members and stakeholders
I have successfully implemented new processes and procedures in the past to enhance productivity
I applied via Walk-in
Method of estimation refers to the process of calculating the approximate cost of a project or task.
Estimation can be done using various methods such as approximate quantities method, detailed estimate method, and unit rate method.
Factors such as labor cost, material cost, equipment cost, and overheads are taken into consideration while estimating.
Estimation can be done manually or using software such as AutoCAD, Excel...
The ratio of concrete refers to the proportion of cement, sand, and aggregate used in the mixture.
The most common ratio of concrete is 1:2:3, which means one part cement, two parts sand, and three parts aggregate.
Other ratios include 1:1.5:3 and 1:3:6, depending on the strength and durability required for the project.
The ratio of concrete can also be adjusted based on the type of project, climate conditions, and availa...
Substructure refers to the part of a building or structure that is below ground level, while superstructure refers to the part above ground level.
Substructure includes foundation, basement, and retaining walls
Superstructure includes columns, beams, walls, and roof
Substructure is responsible for transferring loads to the ground, while superstructure provides support for the building or structure
Examples of substructure ...
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M-25 Grade concrete is commonly used in construction projects.
The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).
The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.
F...
The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.
The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.
Standard brick sizes are commonly used in construction.
For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:
- ...
based on 1 review
Rating in categories
System Engineer
19
salaries
| ₹2 L/yr - ₹3.2 L/yr |
System Administrator
8
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Senior Engineer
7
salaries
| ₹5.4 L/yr - ₹7.2 L/yr |
Customer Care Executive
5
salaries
| ₹0.6 L/yr - ₹5.3 L/yr |
HR Executive
5
salaries
| ₹2.5 L/yr - ₹4.3 L/yr |
Tech Mahindra
HCLTech
Wipro
TCS