Filter interviews by
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed before Nov 2020. There were 5 interview rounds.
HVDC stands for High Voltage Direct Current. It is a system used for transmitting high voltage electricity over long distances.
HVDC systems are used to transmit electricity over long distances with minimal losses.
They are more efficient than traditional AC systems for long-distance transmission.
HVDC systems use converters to convert AC power to DC power and vice versa.
Examples of HVDC systems include the Itaipu HVDC sy...
A rectifier is an electronic device that converts AC to DC.
Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.
They can be made using diodes or other semiconductor devices.
Rectifiers are essential for many electronic devices to function properly.
Examples of rectifiers include bridge rectifiers, half-wave rectifiers, and full-wave rectifiers.
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
About experience about cell and SOP,MSDS, etc.
About experience about and how to improve quality, efficiency,
TPS stands for Transactions Per Second, a metric used to measure the number of transactions processed in a system within a second.
TPS is a key performance indicator for systems handling high volumes of transactions.
It is commonly used in the context of payment processing systems, online banking, and stock trading platforms.
Higher TPS indicates better system performance and scalability.
For example, a payment gateway may...
5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items.
Set in order: Arrange items so they are easy to use and label them to eliminate searching.
Shine: Clean the work area and equipment regularly.
Standardize: Establish ...
Process about new development involves planning, designing, testing, and implementing innovative ideas or products.
Researching market trends and customer needs
Creating a detailed project plan
Collaborating with cross-functional teams
Testing prototypes and gathering feedback
Iterating on designs based on feedback
Launching the new product or service
MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.
MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.
Control Plan is a detailed document outlining the steps to maintain quality control in production processes.
MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.
Con...
7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.
Check Sheet: Used to collect and analyze data in an organized manner.
Histogram: Represents data distribution visually to identify patterns and trends.
Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.
Cause and Effect Diagram (Fishbone Diagram): Identifies root ...
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing teams and driving sales.
Managed a team of 15 sales associates and consistently exceeded sales targets
Implemented new training programs to improve customer service and product knowledge
Developed and executed marketing strategies to increase foot traffic and drive sales
Handled inventory management and ensured accurate stock levels
Resolved customer complaints a...
based on 2 interviews
Interview experience
based on 29 reviews
Rating in categories
Executive Accountant
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Office Administrator
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Branch Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
DCMN Bangalore
Greenlight Planet
Tata Power Solar
Azure Power