i
Secure Meters
Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 3 interview rounds.
There were 4 parts - basic of c#, basics of database, basics questions based on mechanics & basic English
Count characters in a line of text
Iterate through each character in the line
Use a counter variable to keep track of the number of characters
Exclude spaces or other non-alphabetic characters from the count
To convert hexadecimal to decimal, multiply each digit by 16 raised to the power of its position.
Iterate through each digit of the hexadecimal number
Convert each digit to its decimal equivalent (0-9 or A-F)
Multiply the decimal value by 16 raised to the power of its position
Sum up all the values to get the decimal equivalent
No, function overloading cannot be done on the basis of return type.
Function overloading is based on the number and type of parameters in the function signature, not the return type.
Having two functions with the same name but different return types would result in a compilation error.
Example: int add(int a, int b) and float add(int a, int b) would not be allowed.
I applied via Referral and was interviewed before Dec 2022. There was 1 interview round.
Testing of meter involves ensuring accuracy and functionality.
Calibrate meter regularly to ensure accuracy
Test meter against known standards
Check for any physical damage or wear
Verify proper functioning of all features
Document test results for record keeping
I applied via Referral and was interviewed before Apr 2022. There were 4 interview rounds.
1. Create a solution that can help a user to stay hydrated.
2. Heuristic Evaluation of any website and a mobile app.
Information Architecture is the process of organizing, structuring, and labeling content in an effective and efficient way.
It involves creating a clear and logical hierarchy of information
It helps users find what they are looking for quickly and easily
It considers user needs and behaviors
It includes designing navigation and search systems
Example: A website with a well-organized menu and clear categories
Example: A mobil...
Yes, contextual design is a user-centered design approach that focuses on understanding the context in which a product will be used.
Contextual design involves observing and interviewing users in their natural environment to gain insights into their needs and behaviors.
These insights are then used to inform the design of the product, ensuring that it meets the specific needs of the users in their context.
Contextual desi...
My design process involves research, ideation, prototyping, testing, and iteration.
I start by researching the problem and target audience.
Then I ideate and sketch out possible solutions.
Next, I create low-fidelity wireframes and prototypes.
I test these prototypes with users and gather feedback.
Finally, I iterate on the design based on user feedback and continue testing until the design is finalized.
The work capacity and heating system of a machine are important factors to consider in mechanical engineering.
The work capacity of a machine refers to the amount of work it can perform in a given time period.
The heating system of a machine is important to prevent overheating and ensure optimal performance.
Factors that affect work capacity and heating system include the type of machine, its size, and the materials used ...
Secure Meters interview questions for popular designations
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
10th maths reasoning
Meter knowledge is essential for monitoring energy consumption and losses in transformers.
Meter knowledge involves understanding how to read and interpret energy consumption data.
Types of losses in transformers include copper losses (I^2R losses) and iron losses (eddy current and hysteresis losses).
Copper losses occur in the windings of the transformer due to resistance, while iron losses occur in the core of the trans...
Get interview-ready with Top Secure Meters Interview Questions
I applied via Naukri.com and was interviewed before Jan 2022. There were 5 interview rounds.
Different members of a steel structure include beams, columns, trusses, and braces.
Beams: horizontal members that support loads
Columns: vertical members that support loads
Trusses: triangular structures that support loads over a span
Braces: diagonal members that provide stability and support
Examples: roof trusses, bridge girders, building frames
Some test on logical reasoning and aptitude on tablet/ i pad
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
A single line diagram shows the electrical connections and components of a power system.
A single line diagram is a simplified representation of a power system that shows the electrical connections and components in a single line.
The diagram includes elements such as generators, transformers, circuit breakers, switches, and loads.
Each element is represented by a symbol that indicates its function and characteristics.
The...
I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
It is a very good test in my life
A pump is a mechanical device used to move fluids from one place to another.
Pumps are used in various industries such as agriculture, construction, and manufacturing.
There are different types of pumps such as centrifugal pumps, positive displacement pumps, and jet pumps.
Examples of pumps include water pumps, fuel pumps, and air pumps.
Pumps can be powered by electricity, gasoline, diesel, or manual labor.
Pump operators ...
Work is the effort put into achieving a goal while maintenance is the act of preserving or restoring something.
Work involves performing tasks to achieve a specific objective or goal.
Maintenance involves keeping something in good condition or restoring it to its original state.
Work is usually a temporary activity while maintenance is ongoing.
Examples of work include building a structure, repairing a machine, or completi...
Top trending discussions
Some of the top questions asked at the Secure Meters interview -
The duration of Secure Meters interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 67 interviews
Interview experience
based on 834 reviews
Rating in categories
Executive
126
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
106
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
103
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Developer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer 1
69
salaries
| ₹0 L/yr - ₹0 L/yr |
Genus Power Infrastructures
Hpl Electric & Power
Crompton Greaves Consumer Electricals
ABB