Filter interviews by
I applied via Campus Placement and was interviewed in Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
Accounts payable is the amount of money a company owes to its suppliers or vendors for goods or services received but not yet paid for.
Accounts payable represents the company's short-term liabilities.
It is recorded as a current liability on the balance sheet.
Examples of accounts payable include invoices from suppliers, utility bills, and employee expense reimbursements.
Accounts payable is an important aspect of managin...
Procure to pay (P2P) is a process that involves the acquisition of goods or services, from the procurement stage to the payment stage.
P2P is a comprehensive process that includes requisitioning, purchasing, receiving, and paying for goods or services.
It starts with the identification of a need, followed by supplier selection, purchase order creation, goods receipt, invoice processing, and ends with payment to the suppl...
A PO based invoice is an invoice that is generated based on a purchase order issued by a buyer to a supplier.
A PO based invoice is created when a buyer places an order with a supplier and a purchase order is issued.
The invoice is generated based on the details mentioned in the purchase order.
It helps in ensuring that the goods or services received match the order placed.
PO based invoices are commonly used in business t...
GRN or Goods Receipt Note is a document that records the receipt of goods from a supplier.
GRN is a document that verifies the receipt of goods from a supplier.
It contains details such as the quantity and quality of goods received.
It is used to match the goods received with the purchase order and invoice.
GRN is an important document for accounts payable as it helps in verifying and processing supplier invoices.
Example: ...
I was interviewed before Aug 2016.
The first quadrant and the third quadrant are two different sections of a coordinate plane.
The first quadrant is located in the upper right-hand side of the coordinate plane.
It contains points with positive x and y coordinates.
The third quadrant is located in the lower left-hand side of the coordinate plane.
It contains points with negative x and y coordinates.
The first quadrant is often associated with growth and posit...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 2 interview rounds.
Regulations ECE and FMVSS and Design standards for Sheetmetal and plastic
ECE regulations are standards set by the United Nations Economic Commission for Europe for the safety and environmental performance of vehicles.
FMVSS refers to Federal Motor Vehicle Safety Standards, which are regulations set by the National Highway Traffic Safety Administration in the United States.
Design standards for sheet metal and plastic inv...
posted on 12 Jul 2021
I applied via Referral and was interviewed before Jul 2020. There was 1 interview round.
Line balancing rule is a technique used in production planning to optimize the workflow by evenly distributing work among different stations.
Line balancing rule aims to minimize idle time and maximize efficiency in production lines.
It involves assigning tasks to workstations in a way that each station has a similar amount of work to do.
This helps in reducing bottlenecks and improving overall productivity.
Example: In an...
To stay active in my field, I continuously seek out new technologies, attend industry events, participate in professional development courses, and collaborate with colleagues.
Stay updated on the latest technologies and trends in the field
Attend industry conferences, workshops, and seminars
Participate in professional development courses and certifications
Collaborate with colleagues on projects and research
Join professio
I applied via Naukri.com and was interviewed in Feb 2022. There was 1 interview round.
posted on 6 Feb 2022
The rejection control of the moulding machine is typically located on the control panel.
The rejection control is usually a button or switch on the control panel.
It may be labeled as 'reject' or 'scrap'.
The control allows the operator to manually reject any defective parts produced by the machine.
Some machines may also have an automatic rejection system that is programmed to detect and remove defective parts.
The locatio...
Injection moulding machine is located in the production area and problem solving involves identifying and resolving issues with the machine and the moulds.
Injection moulding machine is typically located in the production area
Problem solving involves identifying and resolving issues with the machine and the moulds
Common problems include issues with the temperature, pressure, and material flow
Solutions may involve adjust...
VA is value analysis, while VE is value engineering. Both are cost-saving techniques used in product development.
VA is a systematic review of a product's components and functions to identify areas where cost can be reduced without affecting performance.
VE is a more comprehensive approach that involves rethinking the entire product design to achieve cost savings while improving performance.
VA is typically used in the ea...
The cost of plastic molding components can be calculated by considering factors such as material cost, tooling cost, labor cost, and overhead cost.
Determine the material cost per unit of the component
Calculate the tooling cost, which includes the cost of the mold and any necessary equipment
Factor in the labor cost, which includes the cost of operating the molding machine and any necessary labor for finishing and assemb...
Polymers are large molecules made up of repeating units called monomers. They have a wide range of applications in various fields.
Polyethylene
Polypropylene
Polyvinyl chloride
Polystyrene
Polyester
Polyurethane
Nylon
Teflon
Silicone
Rubber
I applied via Naukri.com and was interviewed in Sep 2021. There were 2 interview rounds.
CNC programming is the process of creating instructions for a computer-controlled machine to perform specific tasks.
CNC stands for Computer Numerical Control
Programs are created using CAM software
Instructions are written in G-code
Used in manufacturing for precision and efficiency
Examples include milling, drilling, and turning operations
Tooling selection depends on factors like material, operation, budget, and accuracy.
Consider the material being worked on
Determine the operation being performed
Set a budget for the tooling
Ensure the required accuracy can be achieved
Research and compare different tooling options
Consult with experts or manufacturers for recommendations
The 7 QC tools are a set of problem-solving tools used in quality control and quality management.
Check sheets: used to collect and organize data
Pareto charts: used to identify the most frequent problems
Cause-and-effect diagrams: used to identify the root cause of a problem
Histograms: used to show the distribution of data
Scatter diagrams: used to show the relationship between two variables
Control charts: used to monitor...
Controlling plans and manpower is crucial for efficient production line lead.
Develop and implement production plans based on demand and available resources
Monitor and adjust plans as necessary to meet production targets
Manage and allocate manpower to ensure optimal use of resources
Track and analyze production data to identify areas for improvement
Collaborate with other departments to ensure smooth production flow
I increased production by implementing lean manufacturing principles and optimizing production processes.
Implemented lean manufacturing principles to reduce waste and increase efficiency
Optimized production processes by identifying bottlenecks and implementing solutions
Trained and motivated employees to work more efficiently
Invested in new equipment and technology to improve production capacity
Streamlined supply chain ...
Interview experience
based on 29 reviews
Rating in categories
Quality Engineer
13
salaries
| ₹1.7 L/yr - ₹4.4 L/yr |
Executive Accountant
7
salaries
| ₹1 L/yr - ₹3.8 L/yr |
QA Engineer
6
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Senior Engineer
5
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Production Engineer
5
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Knorr-Bremse
Greaves Cotton
India Japan Lighting
Goodyear