Filter interviews by
I applied via Campus Placement and was interviewed in Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
I appeared for an interview before Aug 2016.
The first quadrant and the third quadrant are two different sections of a coordinate plane.
The first quadrant is located in the upper right-hand side of the coordinate plane.
It contains points with positive x and y coordinates.
The third quadrant is located in the lower left-hand side of the coordinate plane.
It contains points with negative x and y coordinates.
The first quadrant is often associated with growth and posit...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
SAP is an enterprise resource planning software used for managing business operations and customer relations.
SAP stands for Systems, Applications, and Products in Data Processing
It is used by companies to manage their business operations such as finance, sales, procurement, and inventory management
SAP also offers customer relationship management (CRM) software to manage interactions with customers
It is widely used in i...
I use various Tcodes depending on the task at hand.
For material master data maintenance, I use MM01, MM02, and MM03.
For purchase order creation and maintenance, I use ME21N and ME22N.
For inventory management, I use MIGO and MB51.
For production planning, I use MD61 and MD04.
For quality management, I use QA32 and QE51.
For sales and distribution, I use VA01, VA02, and VA03.
To punch production in SAP, follow these steps:
Create a production order in SAP
Release the production order
Confirm the production order
Perform goods receipt for the production order
Perform goods issue for the production order
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
posted on 11 May 2023
I applied via Campus Placement
I applied via Walk-in and was interviewed in May 2022. There were 4 interview rounds.
based on 2 interviews
Interview experience
based on 29 reviews
Rating in categories
Quality Engineer
12
salaries
| ₹1.7 L/yr - ₹4.4 L/yr |
Executive Accountant
7
salaries
| ₹1 L/yr - ₹3.8 L/yr |
QA Engineer
6
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Senior Engineer
5
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Production Engineer
5
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
India Japan Lighting