Filter interviews by
I appeared for an interview before Aug 2016.
The first quadrant and the third quadrant are two different sections of a coordinate plane.
The first quadrant is located in the upper right-hand side of the coordinate plane.
It contains points with positive x and y coordinates.
The third quadrant is located in the lower left-hand side of the coordinate plane.
It contains points with negative x and y coordinates.
The first quadrant is often associated with growth and posit...
Top trending discussions
posted on 10 Apr 2022
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 14 Dec 2021
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
The diameter of what? Please provide more context.
Please provide more information about what you are referring to.
Without context, it is impossible to answer this question.
Are you asking about the diameter of a specific object or component?
Please clarify your question so I can provide an accurate answer.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
posted on 16 Apr 2022
I applied via Approached by Company and was interviewed in Mar 2022. There was 1 interview round.
posted on 8 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
posted on 1 Mar 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
posted on 18 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
Technical,skill development program
based on 5 reviews
Rating in categories
Quality Engineer
12
salaries
| ₹1.7 L/yr - ₹4.4 L/yr |
Executive Accountant
7
salaries
| ₹1 L/yr - ₹3.8 L/yr |
QA Engineer
6
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Senior Engineer
5
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Production Engineer
5
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Knorr-Bremse
Victora Auto Private Limited
Greaves Cotton
Sanden Vikas