i
Sasken
Filter interviews by
I applied via Approached by Company and was interviewed before Sep 2021. There were 4 interview rounds.
Questions related to Aptitude and Coding will be asked in first round.
Top trending discussions
posted on 14 Dec 2020
DFMEA is a design failure mode and effects analysis, APQP is advanced product quality planning, and PPAP is production part approval process.
DFMEA is a systematic approach to identifying and preventing design failures.
APQP is a structured process for developing new products and ensuring quality throughout the product lifecycle.
PPAP is a set of procedures used to ensure that parts meet customer requirements and are read...
Beam loading refers to the distribution of forces and moments acting on a beam.
Beam loading includes both the external loads applied to a beam and the internal reactions within the beam.
Types of beam loading include point loads, distributed loads, and concentrated moments.
Understanding beam loading is crucial for designing beams that can support the expected loads without failing.
Examples of beam loading scenarios incl...
A force diagram is a visual representation of the forces acting on an object.
Identify all the forces acting on the object
Draw arrows to represent the direction and magnitude of each force
Label each force with its name and value
Ensure that the forces are balanced if the object is in equilibrium
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Points to consider when designing a jig
Understand the purpose of the jig
Consider the material and dimensions of the workpiece
Ensure proper alignment and stability
Include features for easy clamping and adjustment
Design for ease of use and efficiency
posted on 17 Jul 2024
The GD&T symbol for runout is TIR (Total Indicated Runout)
TIR stands for Total Indicated Runout
It is used to specify the maximum allowable difference in location of a feature when the part is rotated 360 degrees
TIR is represented by a circular symbol with two arrows pointing in opposite directions
posted on 17 Feb 2024
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
Asking about ratio related qst and profit loss regarding or engineering regarding
posted on 21 Sep 2023
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
The PDCA cycle is a four-step management method used for continuous improvement in processes and products.
Plan: Identify and plan for improvement
Do: Implement the plan on a small scale
Check: Measure the results and analyze data
Act: Take action based on the results to improve further
Example: A company uses the PDCA cycle to improve their production process by identifying bottlenecks, implementing changes, measuring the
Job and education because both are important for me
I'm happy because he is very intelligent more than me
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
based on 3 reviews
Rating in categories
Software Engineer
309
salaries
| ₹3.2 L/yr - ₹11.5 L/yr |
Senior Software Engineer
299
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
193
salaries
| ₹6 L/yr - ₹22 L/yr |
Associate Software Engineer
179
salaries
| ₹4 L/yr - ₹6 L/yr |
Lead Engineer
167
salaries
| ₹10.5 L/yr - ₹34 L/yr |
LTIMindtree
Persistent Systems
L&T Technology Services
TCS