i
Sangir Plastics
Filter interviews by
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
Kleanchute installation involves implementing waste disposal systems in residential apartments.
Consider the layout and size of the apartments to determine the best placement for Kleanchutes.
Ensure proper ventilation and safety measures are in place during installation.
Train residents on how to use the Kleanchute system effectively to avoid blockages or malfunctions.
A siphonic drainage system is a type of drainage system that uses the siphonic action to quickly remove large volumes of water from a building or area.
Utilizes the siphonic action to create a vacuum and rapidly drain water
Ideal for areas with high rainfall or where large volumes of water need to be removed quickly
Requires fewer and smaller pipes compared to traditional drainage systems
Commonly used in commercial buildi
I applied via Recruitment Consulltant and was interviewed before Nov 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There were 2 interview rounds.
Sangir Plastics interview questions for popular designations
I applied via Naukri.com and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
Frequently experience area and reason for leaving
Frequently experienced area: Electrical engineering
Reason for leaving: Seeking new challenges and growth opportunities
Example: Frequently experienced area - Power distribution systems
Example: Reason for leaving - Limited career advancement
I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.
Top trending discussions
posted on 15 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
One difficulty faced while processing is managing unexpected equipment failures.
Managing unexpected equipment failures can lead to delays in production.
Finding alternative solutions or repairing the equipment quickly is crucial.
Implementing preventive maintenance strategies can help reduce the frequency of equipment failures.
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Production targets are set goals for the quantity and quality of products to be produced within a specific timeframe.
Production targets are typically set based on market demand, available resources, and production capacity.
Targets should be realistic, achievable, and aligned with overall business objectives.
Regular monitoring and adjustment of targets may be necessary to ensure optimal production efficiency.
Examples: S...
based on 5 interviews
Interview experience
based on 69 reviews
Rating in categories
Assistant Engineer
12
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Project Engineer
9
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Assistant Engineer Production
7
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Quality Engineer
7
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Sales & Marketing Engineer
6
salaries
| ₹4.8 L/yr - ₹6.5 L/yr |
Jotun Paints
All Time Plastics
RC Plasto Tanks And Pipes
Daelim Industrial Co.