Filter interviews by
I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jul 2021. There was 1 interview round.
I applied via Job Portal
GST stands for Goods and Services Tax.
GST is a value-added tax levied on the supply of goods and services in many countries.
It is designed to replace multiple indirect taxes and streamline the taxation system.
GST is applicable to both goods and services, ensuring a uniform tax structure.
It aims to eliminate the cascading effect of taxes and promote ease of doing business.
For example, in India, GST was implemented in 20
I'm sorry, but I don't understand the question. Could you please clarify?
Ask for clarification on what 'Po' refers to.
It could be a person's name, an acronym, or a reference to something else entirely.
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Sandhar Technologies interview questions for popular designations
There are two types of offset - Tool offset and Work offset.
Tool offset is used to compensate for the tool's size and shape.
Work offset is used to compensate for the position of the workpiece.
Tool offset is usually set by the operator, while work offset is set by the programmer.
Examples of tool offset include length offset and radius offset.
Examples of work offset include G54, G55, and G56.
Get interview-ready with Top Sandhar Technologies Interview Questions
I applied via Company Website and was interviewed before Feb 2021. There were 3 interview rounds.
An engineer is a professional who applies scientific and mathematical principles to design, develop, and maintain structures, machines, systems, and processes.
Engineers use their knowledge of science and math to solve problems and create new technologies.
They work in a variety of fields, including aerospace, civil, electrical, mechanical, and software engineering.
Engineers must be able to communicate effectively, work ...
Running a plant with zero defect requires a combination of preventive measures, quality control, and continuous improvement.
Implementing a robust quality management system
Regular maintenance and calibration of equipment
Training and development of employees
Continuous monitoring and analysis of production processes
Root cause analysis and corrective actions for any defects
Collaboration with suppliers to ensure quality of ...
OEE, SPC, 8D, KIEZEN, COST SAVING are important concepts in production engineering.
OEE (Overall Equipment Effectiveness) measures the efficiency of production equipment.
SPC (Statistical Process Control) is a method of monitoring and controlling a production process.
8D (Eight Disciplines) is a problem-solving methodology used to identify, correct, and prevent recurring problems.
KIEZEN is a Dutch acronym for a problem-so...
I applied via Walk-in and was interviewed in Oct 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
Logical reasoning questions and HR related questions
I applied via Referral and was interviewed before Oct 2020. There was 1 interview round.
The components of an engine include cylinders, pistons, crankshaft, camshaft, valves, spark plugs, and fuel injectors.
Cylinders: where the fuel is burned
Pistons: move up and down in the cylinders to create power
Crankshaft: converts the up and down motion of the pistons into rotational motion
Camshaft: controls the opening and closing of the valves
Valves: control the flow of fuel and air into the cylinders and exhaust ou...
Quality assurance is the process of ensuring that a product or service meets the desired level of quality.
It involves creating and implementing quality control procedures
It ensures that products or services meet customer expectations
It involves continuous monitoring and improvement of processes
It helps to prevent defects and errors in products or services
Examples include product testing, process audits, and customer fe
Quality control is the process of ensuring that products or services meet the desired level of quality.
It involves inspecting and testing products or services to ensure they meet the required standards.
It also involves identifying and correcting any defects or issues that may arise during production.
Quality control is important for ensuring customer satisfaction and maintaining a company's reputation.
Examples include c...
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.
HPDC machine stands for High-Pressure Die Casting machine used for casting metal parts with high precision and accuracy.
HPDC machine is used for casting metal parts with high precision and accuracy.
It uses high pressure to inject molten metal into a mold cavity.
The machine is commonly used in the automotive and aerospace industries.
HPDC machines can produce complex shapes with thin walls and high strength.
Examples of p...
HPDC machine sequence refers to the steps involved in the high-pressure die casting process.
The die is closed and molten metal is injected into the die cavity
The metal solidifies quickly and the die is opened to eject the casting
The casting is trimmed and finished as required
The die is sprayed with a release agent and the process is repeated
Top trending discussions
The duration of Sandhar Technologies interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 50 interviews
Interview experience
based on 781 reviews
Rating in categories
Senior Engineer
197
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Assistant Manager
176
salaries
| ₹4.5 L/yr - ₹10.1 L/yr |
Engineer
176
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Quality Engineer
127
salaries
| ₹1 L/yr - ₹4.4 L/yr |
Production Engineer
115
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda