Filter interviews by
Building Supervisor should communicate effectively with clients to address their needs and concerns.
Listen actively to the client's requests and concerns
Provide clear and timely updates on project progress
Address any issues or complaints promptly and professionally
Maintain a positive and respectful attitude towards the client
Seek feedback from the client to ensure satisfaction
Effective communication, clear expectations, regular check-ins, and addressing issues promptly.
Establish clear expectations and requirements upfront
Maintain open and regular communication with subcontractors
Regularly check in on progress and address any issues promptly
Provide feedback and guidance as needed
Document all agreements and changes in writing
I appeared for an interview in Aug 2017.
posted on 8 Oct 2022
I appeared for an interview before Oct 2021.
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
I applied via Recruitment Consultant and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
I applied via Walk-in and was interviewed before Feb 2021. There were 5 interview rounds.
1.Probability questions?
2.General science?
A contract term refers to the duration of a contract and the specific conditions that govern it.
Contract term refers to the length of time a contract is valid.
It also includes the specific conditions and obligations of each party involved.
Contract terms can be fixed or flexible depending on the agreement.
Examples of contract terms include payment schedules, termination clauses, and renewal options.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Engineer
176
salaries
| ₹10.9 L/yr - ₹32 L/yr |
Process Engineer
50
salaries
| ₹6 L/yr - ₹12.6 L/yr |
Piping Designer
48
salaries
| ₹4.4 L/yr - ₹16 L/yr |
Piping Engineer
47
salaries
| ₹6 L/yr - ₹20 L/yr |
Instrument Engineer
38
salaries
| ₹6.8 L/yr - ₹26.8 L/yr |
L&T Construction
Saint-Gobain
AECOM
AtkinsRealis