I am responsible for ensuring quality control and quality assurance in the construction of the metro project.
Conducting inspections and tests on materials used in construction
Ensuring compliance with project specifications and standards
Identifying and resolving any quality issues that may arise
Collaborating with project managers and contractors to maintain quality standards
Pre casting is a construction method where concrete elements are cast in a different location before being transported to the construction site.
Pre casting helps in ensuring quality control and reducing construction time on site.
Examples include precast concrete panels, beams, and columns.
It allows for better planning and coordination of construction activities.
posted on 14 Mar 2022
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
General intelligence
I applied via Naukri.com
posted on 22 Sep 2023
I applied via Naukri.com and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2021. There were 4 interview rounds.
The grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of the concrete in megapascals (MPa).
For example, M20 grade concrete means the compressive strength is 20 MPa.
Different grades of concrete are used for different purposes, such as M10 for non-structural purposes and M40 for heavy-duty st
Frequency tests of construction material as per CPWD
Frequency tests of construction material are conducted as per the guidelines provided by CPWD (Central Public Works Department).
The frequency of tests depends on the type of material and its intended use in the construction project.
CPWD provides specific guidelines for different materials such as cement, aggregates, concrete, steel, etc.
The tests may include compressi...
Brick, plaster, and tile work can be checked by inspecting for proper alignment, levelness, and uniformity.
Check for proper alignment of bricks and tiles using a straight edge or level.
Inspect for levelness of plaster using a spirit level.
Check for uniformity of color and texture in tiles.
Ensure that the joints between bricks or tiles are consistent in size and shape.
Look for any cracks or gaps in the plaster or grout ...
To check reinforcement as per drawing, use measuring tape and compare with the drawing. If there is a problem in slab steel, check for any missing bars or incorrect placement.
Use measuring tape to check the length and diameter of reinforcement bars
Compare the measurements with the drawing to ensure they match
Check for any missing bars or incorrect placement
If there is a problem, consult the structural engineer for a so
Civil Site Engineer
55
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group