Workability refers to the ease with which a material can be worked or manipulated.
Workability is a key property in construction materials such as concrete and mortar.
It is influenced by factors such as water content, temperature, and mix design.
Materials with good workability are easier to place, compact, and finish.
Poor workability can lead to difficulties in construction and affect the final quality of the product.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio leads to stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a typical water cement ratio for general purpos
Lap length is the length of overlap between two reinforcing bars in a concrete structure to ensure proper load transfer.
Lap length is important for maintaining structural integrity and distributing loads evenly.
It is typically specified in construction drawings or codes.
The lap length required depends on factors such as bar diameter, concrete strength, and design loads.
Proper lap length ensures that the bars are effect...
Development length is the minimum length of embedded reinforcement required to transfer the stress from reinforcement to concrete.
Development length is influenced by factors such as concrete strength, reinforcement diameter, bond strength, and cover thickness.
It is important to ensure that the development length is adequate to prevent premature failure of the structure.
For example, in a reinforced concrete beam, the de...
posted on 24 Sep 2023
The type of project execution is typically determined by the project management approach and methodology chosen for the construction project.
Different types of project execution include traditional project delivery, design-build, construction management, and integrated project delivery.
Each type of project execution has its own advantages and disadvantages, and may be more suitable for different types of construction p...
QA (Quality Assurance) focuses on preventing defects in the development process, while QC (Quality Control) focuses on identifying defects in the final product.
QA involves processes and procedures to ensure that the development and testing processes are of high quality.
QC involves activities such as testing, inspection, and review to identify defects in the final product.
QA is proactive in nature, aiming to prevent def...
posted on 5 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
I appeared for an interview in Apr 2023.
Slump test is a concrete test to measure the consistency and workability of freshly mixed concrete.
It is performed by filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.
The amount of slump indicates the water content and workability of the concrete.
Different types of slumps (true slump, shear slump, collapse slump) can provide insights into the quality...
Soil test Is code 2720
Concrete is a strong and durable building material made from a mixture of cement, sand, gravel, and water.
Made from a mixture of cement, sand, gravel, and water
Used in construction for building foundations, roads, bridges, and more
Can be reinforced with steel bars for added strength
Comes in different forms such as ready-mix concrete and precast concrete
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
based on 5 interviews
Interview experience
based on 27 reviews
Rating in categories
Junior Engineer
5
salaries
| ₹2 L/yr - ₹2.8 L/yr |
Junior Surveyor
5
salaries
| ₹0.2 L/yr - ₹0.2 L/yr |
Design Engineer
4
salaries
| ₹4.8 L/yr - ₹5.2 L/yr |
Site Engineer
4
salaries
| ₹3.8 L/yr - ₹4.3 L/yr |
Quality Engineer
4
salaries
| ₹3 L/yr - ₹3.4 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures