Workability refers to the ease with which a material can be worked or manipulated.
Workability is a key property in construction materials such as concrete and mortar.
It is influenced by factors such as water content, temperature, and mix design.
Materials with good workability are easier to place, compact, and finish.
Poor workability can lead to difficulties in construction and affect the final quality of the product.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio leads to stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a typical water cement ratio for general purpos
Lap length is the length of overlap between two reinforcing bars in a concrete structure to ensure proper load transfer.
Lap length is important for maintaining structural integrity and distributing loads evenly.
It is typically specified in construction drawings or codes.
The lap length required depends on factors such as bar diameter, concrete strength, and design loads.
Proper lap length ensures that the bars are effect...
Development length is the minimum length of embedded reinforcement required to transfer the stress from reinforcement to concrete.
Development length is influenced by factors such as concrete strength, reinforcement diameter, bond strength, and cover thickness.
It is important to ensure that the development length is adequate to prevent premature failure of the structure.
For example, in a reinforced concrete beam, the de...
posted on 24 Sep 2023
The type of project execution is typically determined by the project management approach and methodology chosen for the construction project.
Different types of project execution include traditional project delivery, design-build, construction management, and integrated project delivery.
Each type of project execution has its own advantages and disadvantages, and may be more suitable for different types of construction p...
QA (Quality Assurance) focuses on preventing defects in the development process, while QC (Quality Control) focuses on identifying defects in the final product.
QA involves processes and procedures to ensure that the development and testing processes are of high quality.
QC involves activities such as testing, inspection, and review to identify defects in the final product.
QA is proactive in nature, aiming to prevent def...
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 13 Feb 2025
I was interviewed in Jan 2025.
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
based on 5 interviews
Interview experience
based on 27 reviews
Rating in categories
Junior Engineer
5
salaries
| â‚ą2 L/yr - â‚ą2.8 L/yr |
Junior Surveyor
5
salaries
| â‚ą0.2 L/yr - â‚ą0.2 L/yr |
Design Engineer
4
salaries
| â‚ą4.8 L/yr - â‚ą5.2 L/yr |
Site Engineer
4
salaries
| â‚ą3.8 L/yr - â‚ą4.3 L/yr |
Quality Engineer
4
salaries
| â‚ą3 L/yr - â‚ą3.4 L/yr |
BHEL
Larsen & Toubro Limited
TCS
Reliance Industries