Columns starter can be checked by measuring the distance between the starter bars and the top of the column.
Measure the distance between the starter bars and the top of the column using a measuring tape.
Ensure that the distance is as per the design specifications.
Check for any damages or deformities in the starter bars.
Ensure that the starter bars are properly aligned and fixed in place.
Check for any cracks or damages ...
Beam bottoms can be checked by visual inspection and using a straight edge.
Inspect for any cracks or deformities on the bottom surface of the beam.
Use a straight edge to check for any unevenness or dips in the beam.
Check for any signs of corrosion or rust on the bottom surface of the beam.
Ensure that the beam is properly supported and not sagging.
Check for any signs of water damage or staining on the bottom surface of
The strength developed after 7 days of concrete depends on various factors such as mix design, curing, and environmental conditions.
The strength of concrete after 7 days is typically around 60-70% of its ultimate strength.
Factors such as water-cement ratio, aggregate size and type, and curing methods can affect the strength development.
The strength can be tested using compression tests on concrete cubes or cylinders.
Th...
The cube size of RMC (Ready Mix Concrete) is generally 150mm x 150mm x 150mm.
RMC is a concrete mixture that is manufactured in a batching plant or factory according to a set recipe and then delivered to a work site by truck mounted in-transit mixers.
The cube size of RMC is used to determine the compressive strength of the concrete after it has hardened.
The cube size of RMC is generally 150mm x 150mm x 150mm, but it can...
Bent up bars are provided in beams to resist shear forces and prevent diagonal cracks.
Bent up bars increase the shear resistance of the beam.
They help to prevent diagonal cracks from forming in the beam.
They also help to distribute the load evenly across the beam.
The number and size of bent up bars depend on the design requirements and load capacity of the beam.
Bent up bars are typically placed at the ends of the beam
The length of stirrups hook depends on the diameter of the bar and the spacing of the stirrups.
The hook length should be at least 10 times the diameter of the bar.
The hook should extend beyond the compression zone of the beam.
The spacing between stirrups also affects the length of the hook.
For example, for a 12mm diameter bar and 150mm stirrup spacing, the hook length should be at least 120mm.
Columns can have multiple zones depending on the design and purpose.
The number of zones in a column depends on the design and purpose.
Zones can be created for different load-bearing capacities or aesthetic purposes.
For example, a column in a high-rise building may have multiple zones for different levels of wind resistance.
Another example is a decorative column that may have multiple zones for different patterns or tex...
Lapping length of bars is the length of overlap required for two reinforcement bars to transfer load effectively.
It is necessary to provide lapping length to ensure the continuity of reinforcement bars.
The lapping length depends on the diameter of the bars, the grade of concrete, and the design load.
The lapping length is usually 50 times the diameter of the bar for tension reinforcement and 40 times the diameter of the...
The level of slab can be checked using a spirit level or laser level.
Place the spirit level or laser level on the slab surface.
Check the bubble in the spirit level or laser beam to ensure it is level.
Repeat the process at different locations on the slab to ensure it is level throughout.
If the slab is not level, adjustments can be made by adding or removing material.
Ensure the slab is level before proceeding with furthe
Slab thickness can be checked during pouring by using various methods.
Use a laser level to check the thickness of the slab at various points.
Use a measuring tape to measure the thickness of the slab at various points.
Use a dipstick to measure the thickness of the slab at various points.
Ensure that the formwork is set up correctly to the required thickness.
Check the mix design and slump of the concrete to ensure the cor...
I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.
I was interviewed before Feb 2024.
Discussion on the changes in tecehnology
Test followed by the questions and scenario based questions
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
The manpower required to complete a plan depends on the scope, complexity, and timeline of the project.
Manpower requirements can vary based on the size and complexity of the project.
Consider the skills and expertise needed for each task in the plan.
Factor in the timeline and deadlines for completing the plan.
Utilize project management tools to estimate manpower needs accurately.
Example: A large-scale construction proje...
I applied via Naukri.com and was interviewed before Feb 2023. There were 3 interview rounds.
I was interviewed in Aug 2024.
The grade of concrete refers to its strength and durability.
Concrete is classified into different grades based on its compressive strength.
The grade of concrete is denoted by a number followed by the letter 'M' (e.g., M20, M25).
The number represents the compressive strength of concrete in megapascals (MPa) after 28 days of curing.
Higher grade concrete has higher strength and is used for heavy-duty structures like bridg...
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
Yes, I can work with metal packing.
I have experience working with metal packaging in my previous job.
I am familiar with the different types of metal packaging materials and their properties.
I can use tools and equipment to handle and manipulate metal packaging.
I can follow safety protocols when working with metal packaging.
I can troubleshoot and fix issues with metal packaging if needed.
Yes, I have experience in running axles perfectly.
I have experience in operating and maintaining various types of axles.
I ensure that the axle is properly lubricated and aligned before running it.
I monitor the axle's performance and make adjustments as necessary.
I follow all safety protocols and guidelines while operating the axle.
For example, I have experience in running the axle of a heavy-duty truck and ensuring tha
based on 1 review
Rating in categories
Accountant
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Accountant
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Telecalling Executive
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Account Assistant
4
salaries
| ₹0 L/yr - ₹0 L/yr |
ABC Consultants
Kelly Services
Randstad
Team Lease