I applied via LinkedIn and was interviewed in Nov 2021. There was 1 interview round.
Top trending discussions
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Basic scenario based questions
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
posted on 15 Mar 2022
I applied via Newspaper Ad and was interviewed in Feb 2022. There were 4 interview rounds.
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
based on 4 reviews
Rating in categories
Assistant Highway Engineer
38
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Assistant Bridge Engineer
36
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Office Manager
25
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Assistant Quality Material Engineer
24
salaries
| ₹3.5 L/yr - ₹5.7 L/yr |
Quantity Surveyor
17
salaries
| ₹1.8 L/yr - ₹10.8 L/yr |
Feedback Infrastructure Services
Mecon
IL&FS Engineering and Construction
Larsen & Toubro Limited