Filter interviews by
Be the first one to contribute and help others!
HSE Plan is a document outlining how health, safety, and environmental risks will be managed on a project or in a workplace.
HSE Plan includes identification of hazards and risks
It outlines control measures to mitigate risks
Includes emergency response procedures
Assigns responsibilities to individuals or teams
Regular review and updates are essential
Improving workplace safety culture involves leadership commitment, employee engagement, training, communication, and continuous improvement.
Promote leadership commitment to safety by setting clear expectations and leading by example
Engage employees in safety initiatives through regular communication, feedback mechanisms, and involvement in safety committees
Provide comprehensive safety training for all employees, includ...
Subcontractors can be managed by establishing clear communication, setting expectations, monitoring performance, and providing necessary support.
Establish clear communication channels with subcontractors to ensure alignment on project goals and expectations.
Set clear expectations regarding safety protocols, quality standards, and project timelines.
Regularly monitor subcontractor performance to ensure compliance with HS...
Different types of Permit to Work (PTW) include hot work permit, confined space entry permit, electrical work permit, etc.
Hot work permit
Confined space entry permit
Electrical work permit
Excavation permit
Working at height permit
posted on 21 Dec 2024
posted on 30 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 2 interview rounds.
ETL stands for Extract, Transform, Load. It is a process used to extract data from various sources, transform it into a consistent format, and load it into a target database or data warehouse.
Extract: Involves extracting data from different sources such as databases, files, APIs, etc.
Transform: Data is cleaned, validated, and transformed into a consistent format suitable for analysis.
Load: The transformed data is loade...
The correct structure of a DBMS diagram includes entities, attributes, relationships, and keys.
Entities represent the main objects in the database (e.g. Customer, Product).
Attributes are characteristics of entities (e.g. CustomerID, ProductName).
Relationships show how entities are related to each other (e.g. one-to-many, many-to-many).
Keys uniquely identify each record in a table (e.g. Primary Key, Foreign Key).
posted on 16 Sep 2024
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
To find the middle of a linked list, use the slow and fast pointer technique.
Initialize two pointers, slow and fast, at the head of the linked list.
Move the slow pointer by one node and the fast pointer by two nodes until the fast pointer reaches the end of the list.
The node pointed to by the slow pointer at this point is the middle of the linked list.
ANR stands for Application Not Responding, it occurs when the main UI thread is blocked for too long.
ANR can be prevented by offloading long-running tasks to background threads or services.
Optimizing code and reducing UI thread workload can also help prevent ANR.
Using tools like StrictMode can help identify potential ANR issues during development.
Threading in Android allows multiple tasks to run concurrently, improving performance and responsiveness.
Threading can be implemented using classes such as AsyncTask, Handler, and Thread.
AsyncTask is used for short background tasks that need to update the UI, while Handler is used for communication between threads.
Thread is a low-level way to create a new thread for longer background tasks.
Care must be taken to avoid m...
ArrayList is faster for accessing elements, while LinkedList is better for frequent insertions and deletions.
ArrayList uses an array to store elements, allowing for fast random access but slower insertions and deletions.
LinkedList uses nodes with references to the next and previous elements, making insertions and deletions faster but access slower.
For example, if you need to frequently add or remove elements in the mid...
ChatGpt will replace the employment
I generate leads through a combination of digital marketing strategies, networking events, and referrals.
Utilize social media platforms to create targeted ads and engage with potential leads
Attend industry conferences and trade shows to network and generate leads
Ask satisfied customers for referrals to expand the lead pool
Heat detectors are devices that sense abnormally high temperatures and are typically used in areas where smoke detectors may not be suitable.
Types of heat detectors include fixed temperature detectors, rate-of-rise detectors, and combination detectors.
Fixed temperature detectors activate when a specific temperature is reached.
Rate-of-rise detectors activate when the temperature increases rapidly.
Combination detectors c...
NWC, NWF, and NWD are different file formats used in BIM modeling.
NWC (Navisworks Cache) is a lightweight file format used for sharing models with stakeholders who do not have access to the original software.
NWF (Navisworks File) is a project file format that references multiple NWD files and allows for collaboration and coordination.
NWD (Navisworks Document) is a published file format that contains all the data and ge
posted on 5 Nov 2024
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
Developed a web-based application for tracking and managing project tasks.
Used React.js for front-end development
Implemented RESTful APIs using Node.js and Express
Utilized MongoDB for database storage
Integrated authentication and authorization using JWT tokens
I am interested in this role because I am passionate about combining software development and operations to improve efficiency and reliability.
Passionate about DevOps principles and practices
Excited about automating processes and improving efficiency
Interested in working with cutting-edge technologies like Docker and Kubernetes
based on 13 reviews
Rating in categories
Operations Engineer
3
salaries
| ₹19 L/yr - ₹20.2 L/yr |
G4S
IDEMIA
myGate
Securitas