Round 1 - Technical 

(1 Question)

  • Q1. About previous work related discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Well organised company...
Providing full facilities...

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Technical question paper

Round 2 - One-on-one 

(1 Question)

  • Q1. Face to face with VP

Interview Preparation Tips

Topics to prepare for Pride Group Project Manager interview:
  • Construction Management
  • Site Execution
  • Manpower Management
  • Billing
  • Quantity Estimation
  • Vendor Management
  • Aluform
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Hypothetical Project will given to find the project estimate and schedule

Round 3 - Technical 

(1 Question)

  • Q1. Project management knowledge check
Round 4 - HR 

(1 Question)

  • Q1. Will ask about your failure in career and what was the step taken afterwards?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be open, confident and share your past job explicitly

I applied via Naukri.com and was interviewed before Jul 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic HR questions; career details
Round 3 - Technical 

(1 Question)

  • Q1. Core technical questions
Round 4 - Technical 

(1 Question)

  • Q1. Managerial skills testing

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work for and good culture
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Concrete pouring method
  • Ans. 

    Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.

    • Ensure formwork is properly prepared and secured before pouring concrete

    • Use appropriate equipment such as concrete pumps or buckets for pouring

    • Monitor concrete flow and consistency to avoid segregation or honeycombing

    • Properly compact the concrete to remove air voids and ensure strength

    • Allow suffic...

  • Answered by AI
  • Q2. Shuttering of columns
  • Ans. 

    Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.

    • Shuttering is usually made of plywood, timber, or steel.

    • It is important to ensure the shuttering is properly supported and aligned before pouring concrete.

    • The shuttering should be removed after the concrete has set to the required strength.

    • Properly designed and constructed shuttering helps in achieving a smooth and uni

  • Answered by AI
  • Q3. Reinforcement checking checklist points
  • Q4. Tiles placing method
  • Ans. 

    Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.

    • Tiles can be placed in a grid layout for a uniform and organized look.

    • Random pattern placement can create a more eclectic and unique design.

    • Specific design layout involves placing tiles according to a pre-determined pattern or design.

    • Consider factors like tile size, shape, color, and grout spacing when deciding on t

  • Answered by AI
  • Q5. Flooring method for stone work
  • Ans. 

    The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.

    • Prepare the subfloor by ensuring it is clean, level, and dry

    • Apply mortar or adhesive to the back of each stone before placing it on the subfloor

    • Use spacers to maintain consistent spacing between stones

    • Allow the mortar or adhesive to dry completely before grouting the joints

    • Seal the finished stone floor to protec

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just jack is required
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Technical question paper

Round 2 - One-on-one 

(1 Question)

  • Q1. Face to face with VP

Interview Preparation Tips

Topics to prepare for Pride Group Project Manager interview:
  • Construction Management
  • Site Execution
  • Manpower Management
  • Billing
  • Quantity Estimation
  • Vendor Management
  • Aluform
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Introduce myself
Round 2 - Technical 

(1 Question)

  • Q1. Technical for structure & finishing work

Interview Preparation Tips

Interview preparation tips for other job seekers - No join for technical engineers.,worst leadership
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Assignment 

Hypothetical Project will given to find the project estimate and schedule

Round 3 - Technical 

(1 Question)

  • Q1. Project management knowledge check
Round 4 - HR 

(1 Question)

  • Q1. Will ask about your failure in career and what was the step taken afterwards?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be open, confident and share your past job explicitly

I applied via Naukri.com and was interviewed before Jul 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic HR questions; career details
Round 3 - Technical 

(1 Question)

  • Q1. Core technical questions
Round 4 - Technical 

(1 Question)

  • Q1. Managerial skills testing

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work for and good culture

RMK Infrastructure pvt.ltd Interview FAQs

How many rounds are there in RMK Infrastructure pvt.ltd Project Manager interview?
RMK Infrastructure pvt.ltd interview process usually has 1 rounds. The most common rounds in the RMK Infrastructure pvt.ltd interview process are Technical.

Tell us how to improve this page.

RMK Infrastructure pvt.ltd Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

RMK Infrastructure pvt.ltd Project Manager Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

1.0

Skill development

2.0

Work-life balance

5.0

Salary

2.0

Job security

2.0

Company culture

2.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Executive Accountant
9 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Billing Engineer
7 salaries
unlock blur

₹2.6 L/yr - ₹5.2 L/yr

Senior Accounts Executive
7 salaries
unlock blur

₹4.8 L/yr - ₹6.9 L/yr

Junior Engineer Civil
7 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Senior Billing Engineer
5 salaries
unlock blur

₹5.1 L/yr - ₹9.4 L/yr

Explore more salaries
Compare RMK Infrastructure pvt.ltd with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview