Ripples Engineering Electrical Engineer Interview Questions and Answers

Updated 16 Feb 2024

Ripples Engineering Electrical Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2023.

Round 1 - Technical 

(3 Questions)

  • Q1. Star delta connection
  • Q2. LT HT,dg, transformer
  • Q3. Billing process

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic electrical and project knowledge

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Subject Related
  • Q2. Cable, Cable tray, Lighting, Power, Circuits
  • Q3. Project Doing work

Interview Preparation Tips

Interview preparation tips for other job seekers - Tool test
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About Experience in my present work
  • Q2. About present company work profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice company , I'm enjoying my work , work freedom,

I applied via Referral

Interview Questionnaire 

2 Questions

  • Q1. I was asked about power Converters.
  • Q2. I was asked about Traction Transformers

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be true. Never give bluff.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Basic details of electrical equipment
  • Q2. Basic protection of electrical equipment

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What is the process of earthing?
  • Ans. 

    Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.

    • Earthing involves creating a connection between the electrical system and the earth.

    • It is done by burying a metal conductor, such as a copper rod, in the ground.

    • The metal conductor is connected to the electrical system using a wire or cable.

    • Earthing provides a path for...

  • Answered by AI
  • Q2. Which type of DGs used at your Site
  • Ans. 

    The type of DGs used at our site are diesel generators.

    • Diesel generators are commonly used as backup power sources in various industries.

    • They are reliable and can provide a continuous power supply during electrical outages.

    • DGs are often used in remote locations or areas with unreliable grid power.

    • They require regular maintenance and fuel supply to operate efficiently.

    • Examples of DGs used at our site include Cummins, Ca

  • Answered by AI
  • Q3. What is the difference between LT and HT line?
  • Ans. 

    LT line refers to Low Tension line while HT line refers to High Tension line.

    • LT line carries low voltage and is used for domestic and small-scale commercial purposes.

    • HT line carries high voltage and is used for industrial and large-scale commercial purposes.

    • LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.

    • LT lines are usually overhead lines, while HT lines can be both overhead and ...

  • Answered by AI
  • Q4. Which type of Circuit Breakers you used at Site?
  • Ans. 

    We used different types of circuit breakers at the site depending on the specific requirements.

    • We used air circuit breakers (ACBs) for low voltage applications.

    • For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).

    • In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.

    • For specialized applications like generator protection, we used differential ...

  • Answered by AI
  • Q5. How big transformers you used at site
  • Ans. 

    The size of transformers used at the site varied depending on the specific requirements of the project.

    • Transformers used at the site were of different sizes based on the power demand of the electrical system.

    • For smaller projects, transformers with a capacity of around 100 kVA were used.

    • For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.

    • For larger projects, transformers wit...

  • Answered by AI
  • Q6. Which type of Batching Plant you used at Site
  • Ans. 

    We used a stationary type batching plant at the site.

    • We used a stationary type batching plant for our construction project.

    • The stationary batching plant had a higher production capacity compared to mobile plants.

    • It was equipped with multiple storage bins for different types of aggregates.

    • The plant had a conveyor belt system to transfer the aggregates to the mixer.

    • We used this type of batching plant because it provided

  • Answered by AI
  • Q7. At which project you are working

Interview Preparation Tips

Interview preparation tips for other job seekers - It dipends on the interviewer which type of questions he will ask.
But one thing important be confident while interview
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Subject Related
  • Q2. Cable, Cable tray, Lighting, Power, Circuits
  • Q3. Project Doing work

Interview Preparation Tips

Interview preparation tips for other job seekers - Tool test

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the equipment use to substation?
  • Ans. 

    Substations use various equipment for power distribution and control.

    • Transformers: Step up or step down voltage levels.

    • Circuit breakers: Protect the system from overloads and faults.

    • Switchgear: Control and isolate electrical circuits.

    • Busbars: Distribute power to different parts of the substation.

    • Relays: Monitor and protect the system from abnormalities.

    • Capacitors: Improve power factor and voltage stability.

    • Disconnect s...

  • Answered by AI
  • Q2. What is CT's and PT's and LA's and Transformers?
  • Ans. 

    CTs, PTs, LAs, and Transformers are electrical devices used in power systems for measurement, protection, and voltage transformation.

    • CTs (Current Transformers) are used to measure and transform high currents into manageable levels for instruments and relays.

    • PTs (Potential Transformers) are used to measure and transform high voltages into low voltages for instruments and relays.

    • LAs (Lightning Arresters) are used to prot...

  • Answered by AI
  • Q3. What are use of circuit breaker?
  • Ans. 

    Circuit breakers are safety devices that protect electrical circuits from damage caused by overload, short circuit, or ground fault.

    • Circuit breakers are used to prevent damage to electrical equipment and wiring.

    • They interrupt the flow of electricity when there is an overload, short circuit, or ground fault.

    • Circuit breakers are commonly used in homes, businesses, and industrial settings.

    • They come in different sizes and ...

  • Answered by AI
  • Q4. What are rating of copper cable and aluminium cables?
  • Ans. 

    The rating of copper and aluminium cables depends on their size, insulation, and intended use.

    • Copper cables have higher conductivity and are therefore rated higher than aluminium cables of the same size.

    • The rating of a cable also depends on its insulation material and thickness.

    • Cables used for high voltage transmission have higher ratings than those used for low voltage applications.

    • For example, a 10 AWG copper cable m...

  • Answered by AI
  • Q5. What are types of protection on Transformer side line side?
  • Ans. 

    Types of protection on Transformer side line side

    • Overcurrent protection

    • Differential protection

    • Restricted earth fault protection

    • Overvoltage protection

    • Under voltage protection

  • Answered by AI
  • Q6. What are type of relays used to protection system?
  • Ans. 

    Different types of relays are used for protection system such as overcurrent, differential, distance, and directional relays.

    • Overcurrent relays are used to protect against overloads and short circuits.

    • Differential relays are used to protect transformers and generators from internal faults.

    • Distance relays are used to protect transmission lines from faults.

    • Directional relays are used to protect against faults in specific...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good experience in this interview.Thank you for our cooperation with all HR team.

Ripples Engineering Interview FAQs

How many rounds are there in Ripples Engineering Electrical Engineer interview?
Ripples Engineering interview process usually has 1 rounds. The most common rounds in the Ripples Engineering interview process are Technical.
What are the top questions asked in Ripples Engineering Electrical Engineer interview?

Some of the top questions asked at the Ripples Engineering Electrical Engineer interview -

  1. Star delta connect...read more
  2. LT HT,dg, transfor...read more
  3. Billing proc...read more

Tell us how to improve this page.

Ripples Engineering Electrical Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Business Analyst
4 salaries
unlock blur

₹1 L/yr - ₹2 L/yr

Design Engineer
4 salaries
unlock blur

₹2.8 L/yr - ₹3.6 L/yr

Mechanical Engg. Design
4 salaries
unlock blur

₹1.6 L/yr - ₹2 L/yr

Site Engineer
4 salaries
unlock blur

₹3 L/yr - ₹3.7 L/yr

Senior Project Engineer
4 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Ripples Engineering with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview