Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Ripples Engineering Team. If you also belong to the team, you can get access from here

Ripples Engineering Verified Tick

Compare button icon Compare button icon Compare
2.5

based on 21 Reviews

Filter interviews by

Ripples Engineering Interview Questions and Answers

Updated 16 Feb 2024

Ripples Engineering Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2023.

Round 1 - Technical 

(3 Questions)

  • Q1. Star delta connection
  • Q2. LT HT,dg, transformer
  • Q3. Billing process

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic electrical and project knowledge

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (12)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the diesel consumption for Dence Bituen material.
  • Ans. 

    The diesel consumption for Dense Bitumen material varies depending on factors such as temperature, mix design, and equipment used.

    • Diesel consumption for Dense Bitumen material is typically measured in liters per ton of material produced.

    • Factors such as temperature of the mix, mix design, and type of equipment used can affect the diesel consumption.

    • For example, a higher temperature mix may require more diesel to heat th...

  • Answered by AI
  • Q2. Brief your Past Experience
  • Ans. 

    I have over 10 years of experience in management roles, leading teams and implementing strategic initiatives.

    • Managed a team of 50+ employees in a retail setting, increasing sales by 20% within one year

    • Implemented new customer service protocols that resulted in a 15% increase in customer satisfaction

    • Led cross-functional projects to streamline operations and reduce costs by 10%

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Prepare your job knowledge.
2. A specific answer is required for the Question.
3. Your language should be apparent communication.
4. Avoid unwanted explanations when answering the question.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Accounting journal entries
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Q2. Tel us the control of confind
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(1 Question)

  • Q1. What is a brief description of the company?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many grade of Bitumen ?
  • Ans. 

    There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.

    • VG-10: Suitable for low-traffic roads

    • VG-20: Suitable for medium-traffic roads

    • VG-30: Suitable for high-traffic roads

    • VG-40: Suitable for heavy-duty traffic areas like airports and container terminals

  • Answered by AI
  • Q2. What is the compressive strength of cement mortar cube 3 days
  • Ans. 

    The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.

    • Compressive strength of cement mortar cube is an important parameter to assess its quality and durability

    • The strength of cement mortar increases with age, so 3 days is an early testing point

    • Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Salary expectations , work experience
  • Q2. Notice period how many days
  • Ans. 

    My notice period is 30 days.

    • My notice period is standard 30 days as per company policy.

    • I am required to serve a 30-day notice period before leaving my current position.

    • I can start the new role after completing the 30-day notice period.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Techinal related questions on
  • Q2. Digital marketing social media management

Ripples Engineering Interview FAQs

How many rounds are there in Ripples Engineering interview?
Ripples Engineering interview process usually has 1 rounds. The most common rounds in the Ripples Engineering interview process are Technical.
What are the top questions asked in Ripples Engineering interview?

Some of the top questions asked at the Ripples Engineering interview -

  1. Star delta connect...read more
  2. LT HT,dg, transfor...read more
  3. Billing proc...read more

Tell us how to improve this page.

Ripples Engineering Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Ripples Engineering Reviews and Ratings

based on 21 reviews

2.5/5

Rating in categories

2.7

Skill development

2.7

Work-life balance

2.8

Salary

2.4

Job security

2.4

Company culture

2.4

Promotions

2.8

Work satisfaction

Explore 21 Reviews and Ratings
Business Analyst
4 salaries
unlock blur

₹1 L/yr - ₹2 L/yr

Design Engineer
4 salaries
unlock blur

₹2.8 L/yr - ₹3.6 L/yr

Mechanical Engg. Design
4 salaries
unlock blur

₹1.6 L/yr - ₹2 L/yr

Site Engineer
4 salaries
unlock blur

₹3 L/yr - ₹3.7 L/yr

Senior Project Engineer
4 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Ripples Engineering with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview