i
renu robin Design
Filter interviews by
I applied via Approached by Company and was interviewed before Oct 2021. There were 3 interview rounds.
I have 5 years of experience as an Estimation Engineer in the construction industry.
I have successfully estimated costs for various construction projects.
I have experience in analyzing project requirements and specifications.
I am proficient in using estimation software and tools.
I have collaborated with project managers and architects to develop accurate estimates.
I have a strong understanding of construction materials...
The salary expectation for an Estimation Engineer depends on factors such as experience, qualifications, and industry standards.
Consider the average salary range for Estimation Engineers in your location and industry.
Take into account your level of experience and qualifications.
Research the salary ranges offered by similar companies in the industry.
Consider any additional benefits or perks that may be offered.
Be prepar...
Notice period is the duration of time an employee is required to serve after resigning from their current job.
Notice period is a common practice in employment contracts.
It allows the employer to find a suitable replacement for the resigning employee.
During the notice period, the employee is expected to continue working and fulfilling their responsibilities.
The length of the notice period can vary depending on the compa...
Rate analysis is the process of determining the unit cost or rate for various items of work in a construction project.
Rate analysis involves breaking down the cost of materials, labor, and equipment required for a specific task or activity.
It helps in estimating the total cost of a project and determining the quantities of materials needed.
Rate analysis is essential for preparing accurate project budgets and cost estim...
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction.
It includes the diameter, length, shape, and number of bars required for each structural element.
It helps in estimating the quantity of steel required for a project and ensures that the reinforcement is placed correctly.
It is prepared by a structural engineer or a detailer based on the design drawings.
It is an impo...
Mode of measurement refers to the most frequently occurring value in a set of data.
Mode is a measure of central tendency in statistics.
It is the value that appears most frequently in a dataset.
Mode can be used to describe categorical or discrete data.
For example, in a dataset of test scores, if 80 appears most frequently, then 80 is the mode.
Covered area refers to the total area of a building or structure that is enclosed and protected from the elements.
Covered area includes all indoor spaces and any outdoor areas that are covered by a roof or other structure.
It does not include open-air spaces or areas that are not enclosed.
For example, a covered patio or a carport would be considered part of the covered area of a home.
Calculating the covered area is impo...
Top trending discussions
Project Architect
5
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Project Manager
4
salaries
| ₹5.3 L/yr - ₹10.8 L/yr |
Administration Assistant
4
salaries
| ₹3 L/yr - ₹3 L/yr |
Civil Site Engineer
4
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Senior HR Executive
4
salaries
| ₹5.4 L/yr - ₹6.6 L/yr |
Sabyasachi Couture
House Of Anita Dongre
Manish Malhotra
Tarun Tahiliani