I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed before Nov 2020. There was 1 interview round.
MEIS stands for Merchandise Exports from India Scheme. It is a government initiative to promote exports of goods from India.
MEIS is a scheme introduced by the Indian government to incentivize and promote exports of goods from India.
Under MEIS, exporters are provided with duty credit scrips which can be used to pay various duties and taxes.
The scheme covers a wide range of products and sectors, including agriculture, te...
LC in export stands for Letter of Credit.
LC is a financial document issued by a bank to guarantee payment to the exporter.
It provides assurance to the exporter that they will receive payment for the goods or services exported.
LC serves as a secure method of payment in international trade.
It reduces the risk for both the exporter and the importer.
LC includes details such as the amount, terms, and conditions of the payme...
I was interviewed in Sep 2020.
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
A basic aptitude test which focuses on key areas of a person
based on 3 reviews
Rating in categories
Assistant Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Development Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
ReNew
Vestas
Adani Green Energy
Jakson Group