Filter interviews by
I applied via Approached by Company and was interviewed in Dec 2024. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Zero-based costing is a method of budgeting where all expenses must be justified for each new period.
Zero-based costing requires all expenses to be justified from scratch for each budgeting period.
It helps in identifying unnecessary costs and reallocating resources more efficiently.
Example: Instead of automatically budgeting the same amount for office supplies each year, zero-based costing would require justifying the ...
I applied via Referral and was interviewed in Mar 2023. There were 4 interview rounds.
Address root cause, implement corrective actions, monitor effectiveness
Identify the root cause of the chronically issue
Implement corrective actions to address the root cause
Monitor the effectiveness of the corrective actions over time
Lean tools such as 5S, Standard Work, and Visual Management can be used for standard settings for new product.
Implement 5S methodology to organize the workspace and standardize processes
Develop Standard Work instructions to ensure consistency and quality
Utilize Visual Management tools like Kanban boards to track progress and identify issues
Continuous improvement through Kaizen events to refine standards over time
Export issue containment process and assignment task to resolve with cost pridiction
Remsons Industries interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 3 interview rounds.
There are typically five phases in the development process.
The first phase is the planning phase, where the project goals and requirements are defined.
The second phase is the design phase, where the system architecture and user interface are created.
The third phase is the development phase, where the actual coding and programming takes place.
The fourth phase is the testing phase, where the software is tested for bugs a...
Cp and Cpk are statistical process control measures used to assess process capability.
Cp measures the capability of a process to meet the specifications, while Cpk measures the capability of a process to meet the specifications with respect to the center of the process.
Cp is calculated using the formula (USL-LSL)/(6*sigma), while Cpk is calculated using the formula min[(USL-mean)/(3*sigma), (mean-LSL)/(3*sigma)].
A Cp v...
ERW MATERIAL, APQP , SURFACE TREATMENT
I am expecting a competitive salary based on my experience and skills.
I am open to negotiation based on the company's offer
I have researched the industry standards for this position
I am looking for a salary that reflects my qualifications and responsibilities
I am willing to discuss benefits and other compensation packages
Based on my experience and skills, I am expecting a salary range of $X to $Y
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Nov 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
Top trending discussions
posted on 21 Dec 2024
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
The question is asking for the difference between basic method and specification method in production.
Basic method refers to a general approach or technique used in production without specific details.
Specification method involves detailed instructions or requirements for a specific task or product.
Example: Basic method for assembling a product may involve general steps, while specification method would include exact m
Organization method refers to the system or structure used to arrange and manage tasks, resources, and information in a production setting.
Utilize a clear and efficient system for task delegation and tracking
Implement visual management tools such as Kanban boards or Gantt charts
Establish regular communication channels for updates and feedback
Ensure proper documentation and record-keeping for processes and procedures
Enc...
Safety working method involves implementing procedures and protocols to ensure the well-being of employees.
Implementing regular safety training for employees
Enforcing the use of personal protective equipment (PPE)
Conducting regular safety inspections and audits
Encouraging employees to report any safety concerns or hazards
Establishing emergency response plans and procedures
Quality method refers to the approach or system used to ensure products meet standards. Type of work method refers to the specific process or technique used to complete tasks.
Quality method can include Six Sigma, Total Quality Management, Lean Manufacturing, etc.
Type of work method can include Agile, Waterfall, Kanban, etc.
Quality method focuses on ensuring products meet quality standards and customer requirements.
Type...
Problem solving method involves identifying the issue, analyzing possible solutions, implementing the best solution, and evaluating the outcome.
Identify the problem or issue at hand
Gather relevant information and data
Brainstorm possible solutions
Evaluate each solution based on feasibility and impact
Implement the best solution
Monitor and evaluate the outcome for effectiveness
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
Interview experience
based on 105 reviews
Rating in categories
Production Engineer
30
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Assistant Manager
27
salaries
| ₹4.8 L/yr - ₹10.5 L/yr |
Senior Engineer
20
salaries
| ₹3.7 L/yr - ₹6.5 L/yr |
Engineer
16
salaries
| ₹2.9 L/yr - ₹5 L/yr |
Quality Engineer
14
salaries
| ₹2.1 L/yr - ₹4.5 L/yr |
Bharat Forge
Samvardhana Motherson Group
TVS Sundram Fasteners
Rane Holdings