i
Reliable Autotech
Filter interviews by
I applied via Referral and was interviewed before Jun 2022. There were 2 interview rounds.
TPM (Total Productive Maintenance) is a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns, reducing downtime, and improving overall equipment efficiency.
The pillars of TPM include: 1. Autonomous Maintenance 2. Planned Maintenance 3. Quality Maintenance 4. Focused Improvement 5. Early Equipment Management 6. Training and Education 7. Safety, Health, and ...
7QC tools are a set of quality control tools used for process improvement and problem-solving in manufacturing and service industries.
Check sheet: Used to collect and analyze data in a systematic manner.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
Histogram: Represents data dist...
QMS stands for Quality Management System, which is a set of policies, processes, and procedures required for planning and execution in the core business area of an organization.
QMS helps in ensuring that products and services meet customer requirements and are consistently of high quality.
It involves processes such as quality planning, quality control, quality assurance, and quality improvement.
QMS is often based on in...
5S is a methodology used to organize a workplace for efficiency and effectiveness by sorting, setting in order, shining, standardizing, and sustaining.
Sort: Remove unnecessary items from the workplace.
Set in order: Organize remaining items in a logical manner for easy access.
Shine: Clean and inspect the workplace regularly to maintain cleanliness and identify issues.
Standardize: Establish standardized processes and pro...
Top trending discussions
posted on 23 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
I have a valid driver's license for both cars and motorcycles.
I have a Class C license for cars
I also have a Class M license for motorcycles
I have a clean driving record with no accidents or violations
I ride a road bike for commuting and a mountain bike for leisure.
I prefer road bikes for their speed and efficiency on paved roads.
I enjoy mountain biking for the challenge and adventure of off-road trails.
I also have experience with hybrid bikes for their versatility.
I prioritize safety and always wear a helmet and follow traffic laws.
I have participated in charity rides and group rides for fun and community.
Vehicle testing involves various methods to ensure safety, performance, and compliance with regulations.
Testing can include physical tests such as crash tests, durability tests, and performance tests.
Simulation and modeling can also be used to test vehicle components and systems.
Testing must comply with regulations set by organizations such as the National Highway Traffic Safety Administration (NHTSA) and the European
We conduct various types of homologation testing depending on the product and its intended market.
We conduct safety testing to ensure compliance with local regulations.
We perform emissions testing to ensure compliance with environmental regulations.
We conduct performance testing to ensure the product meets the required standards.
We also conduct durability testing to ensure the product can withstand the expected wear an...
posted on 9 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There was 1 interview round.
posted on 1 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 2 interview rounds.
Identify root cause, analyze impact, propose solutions, test solutions, implement changes
Identify the root cause of the random problem by analyzing existing parameters
Analyze the impact of the problem on the system or project
Propose potential solutions to address the random problem
Test the proposed solutions to ensure effectiveness
Implement changes based on the tested solutions
Monitor the system to ensure the random pr
When sudden rejection goes higher how you handle situation
posted on 10 Aug 2022
I applied via Walk-in
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
I am a highly experienced Sr. Engineer with a strong background in various engineering disciplines.
Over 10 years of experience in mechanical, electrical, and civil engineering
Led multiple successful projects from concept to completion
Proficient in CAD software such as AutoCAD and SolidWorks
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Officer
64
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Junior Executive
48
salaries
| ₹3.9 L/yr - ₹7.2 L/yr |
Executive
42
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Senior Executive
31
salaries
| ₹5.8 L/yr - ₹10.8 L/yr |
Assistant Manager
29
salaries
| ₹8 L/yr - ₹13.4 L/yr |
JBM Group
Subros
Varroc Group
Endurance Technologies