Filter interviews by
Clear (1)
I applied via campus placement at Shri Vidyanikethan Engineering College, Tirupati and was interviewed in Aug 2023. There were 2 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed before Oct 2021. There were 3 interview rounds.
It is 3 section test. First section aptitude, english and logical reasoning. Second section is coding round. Third section is essay round. Cut off of every section is 70%.
Encapsulation is the process of hiding implementation details and exposing only necessary information.
Encapsulation is a fundamental concept in object-oriented programming.
It helps in achieving data abstraction and information hiding.
It allows for better control over the data and prevents unauthorized access.
Encapsulation is achieved through the use of access modifiers such as public, private, and protected.
For example...
Function overloading is the ability to have multiple functions with the same name but different parameters.
Function overloading allows a function to perform different tasks based on the number and types of parameters passed to it.
It helps in writing cleaner and more readable code.
Example: void print(int x), void print(float x), void print(char x) are all overloaded functions with the same name but different parameter t
Function overloading is having multiple functions with the same name but different parameters. Function overwriting is replacing a function with a new one.
Function overloading is used to provide multiple ways to call a function with different parameters.
Function overwriting is used to replace a function with a new implementation.
Function overloading is resolved at compile-time based on the number and types of arguments...
Normalization is the process of organizing data in a database to reduce redundancy and dependency.
Normalization helps in improving data consistency and accuracy
It involves breaking down a table into smaller tables and defining relationships between them
Normalization is achieved through a series of normal forms, such as first normal form (1NF), second normal form (2NF), and so on
Normalization can prevent data anomalies,...
ACID properties are a set of properties that ensure database transactions are processed reliably.
ACID stands for Atomicity, Consistency, Isolation, and Durability
Atomicity ensures that a transaction is treated as a single, indivisible unit of work
Consistency ensures that a transaction brings the database from one valid state to another
Isolation ensures that concurrent transactions do not interfere with each other
Durabi...
DDL, DCL, and DML are three types of SQL commands used to manipulate databases.
DDL (Data Definition Language) is used to define the structure of the database schema, such as creating tables, altering tables, and dropping tables.
DCL (Data Control Language) is used to control access to the database, such as granting or revoking permissions.
DML (Data Manipulation Language) is used to manipulate data within the database, s...
I applied via Job Portal and was interviewed in Dec 2024. There were 3 interview rounds.
Topic for GD was AI in BPO.
I was interviewed in Dec 2024.
I am currently earning $80,000 annually and I am looking for a salary in the range of $90,000 to $100,000.
Current salary: $80,000 annually
Expected salary range: $90,000 - $100,000
Open to negotiation based on benefits and responsibilities
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
As a Project Manager, my day to day activities include overseeing project timelines, communicating with team members and stakeholders, tracking progress, resolving issues, and ensuring project goals are met.
Overseeing project timelines and milestones
Communicating with team members and stakeholders
Tracking project progress and updating project documentation
Resolving issues and conflicts that arise during the project
Ensu...
I manage sharing resources by prioritizing tasks, communicating effectively, and utilizing resource management tools.
Prioritize tasks based on importance and urgency
Communicate with team members to ensure everyone is aware of resource allocation
Utilize resource management tools to track and allocate resources efficiently
I manage change requests by evaluating impact, prioritizing based on project goals, obtaining approval, and implementing changes.
Evaluate the impact of the change request on project scope, schedule, and budget.
Prioritize change requests based on project goals and objectives.
Obtain approval from stakeholders before implementing any changes.
Implement approved changes while ensuring minimal disruption to project progress.
...
I accept changes by first understanding the reasons behind them, communicating with stakeholders, creating a plan, and implementing the changes effectively.
Understand the reasons behind the changes
Communicate with stakeholders to gather feedback and address concerns
Create a detailed plan outlining the steps needed to implement the changes
Implement the changes effectively while monitoring progress and making adjustments
Risk management involves identifying, assessing, and mitigating potential risks to a project.
Identify potential risks by brainstorming with team members and stakeholders
Assess the likelihood and impact of each risk using a risk matrix
Develop a risk response plan for high-priority risks
Monitor and review risks throughout the project lifecycle
Communicate risks and mitigation strategies to stakeholders regularly
Project Governance refers to the framework, policies, procedures, and decision-making processes that guide project management.
Project Governance ensures that projects are aligned with organizational goals and objectives.
It involves defining roles and responsibilities, establishing communication channels, and setting up project controls.
Examples of Project Governance mechanisms include steering committees, project chart
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
Project charter is a document that formally authorizes a project and provides the project manager with the authority to apply organizational resources to project activities.
Defines the project scope, objectives, deliverables, and stakeholders
Outlines the project timeline, budget, and resources
Establishes the project manager's authority and responsibilities
Serves as a reference point for decision-making and conflict res...
I was interviewed in Aug 2024.
Never encountered a company that is so listless in the hiring process.
I applied via LinkedIn and was interviewed in Sep 2024. There was 1 interview round.
based on 1 interview
Interview experience
Embedded Software Engineer
5
salaries
| ₹3.5 L/yr - ₹6 L/yr |
Devops Engineer
4
salaries
| ₹3 L/yr - ₹3.2 L/yr |
HR and IT Recruiter
4
salaries
| ₹3.2 L/yr - ₹3.8 L/yr |
Software Engineer
3
salaries
| ₹3 L/yr - ₹3.8 L/yr |
UI/UX Designer
3
salaries
| ₹2.5 L/yr - ₹3 L/yr |
TCS
Infosys
Wipro
HCLTech