Filter interviews by
I applied via Referral and was interviewed before May 2020. There were 4 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
posted on 2 Feb 2024
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
posted on 6 Sep 2023
posted on 10 Nov 2023
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
posted on 29 Jul 2022
I applied via LinkedIn and was interviewed before Jul 2021. There were 4 interview rounds.
Basic electrical questions, small problem solving
The expected meggar value of a 33 Kv insulator is typically above 1000 megaohms.
The meggar value indicates the insulation resistance of the insulator.
The expected value varies depending on the type and condition of the insulator.
A value below 1000 megaohms indicates poor insulation and may require maintenance or replacement.
Regular testing of insulators is important to ensure safety and prevent electrical failures.
Technical round and companys HR and higher authorities meet on a virtual interview and cross question on different topics
posted on 31 Jul 2022
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
Basic electrical fundamentals
I have extensive experience in solar plant operations and maintenance.
Managed the operations and maintenance of a 50 MW solar plant for 3 years
Developed and implemented preventive maintenance schedules to ensure optimal performance
Performed regular inspections and troubleshooting to identify and resolve issues
Coordinated with technicians and contractors for repairs and upgrades
Implemented safety protocols and trained s...
posted on 10 Jan 2025
Key aspects of turbine protection include overspeed protection, vibration monitoring, temperature monitoring, and lube oil system protection.
Overspeed protection is crucial to prevent catastrophic failure in case of excessive turbine speed.
Vibration monitoring helps detect any abnormal vibrations that could indicate potential issues with the turbine.
Temperature monitoring ensures that the turbine operates within safe t...
posted on 18 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.
Assistant Manager
26
salaries
| ₹3.8 L/yr - ₹9.8 L/yr |
Electrical Engineer
18
salaries
| ₹2 L/yr - ₹5.8 L/yr |
Senior Engineer
17
salaries
| ₹4 L/yr - ₹8.6 L/yr |
Engineer
12
salaries
| ₹3 L/yr - ₹6 L/yr |
Project Engineer
11
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Dhoot Transmission
R.K.M Powergen
SHV Energy
New Allenberry Works