Upload Button Icon Add office photos

Rays Power Infra

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Rays Power Infra Deputy Manager Interview Questions and Answers

Updated 5 Mar 2025

Rays Power Infra Deputy Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024.

Interview Preparation Tips

Interview preparation tips for other job seekers - A fantastic work environment that emphasizes job security, opportunities for learning and development, teamwork, and flexible working arrangements.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. What is land acquisition process
  • Ans. 

    Land acquisition process is the legal process of acquiring land for public or private use.

    • Identifying the land to be acquired

    • Negotiating with landowners or acquiring through eminent domain

    • Determining fair compensation for the land

    • Obtaining necessary permits and approvals

    • Transferring ownership of the land

    • Examples include acquiring land for building roads, schools, or shopping centers

  • Answered by AI
  • Q3. NA converson process

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence and communication
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Use pscad and make drif tied wind power plan
  • Ans. 

    Using PSCAD to create a grid-tied wind power plant

    • Create a new project in PSCAD

    • Design the wind turbine system with appropriate parameters

    • Connect the wind turbine system to the grid

    • Simulate the system to analyze its performance

    • Optimize the design for maximum efficiency

  • Answered by AI
  • Q2. How many years you will stay in this company?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - no need to impress only express yourself

Because answers to some question, I have not idea, I am not aware about it.

Some are even given in ghis way.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Contribute & help others!
anonymous
You can choose to be anonymous

Rays Power Infra Interview FAQs

How many rounds are there in Rays Power Infra Deputy Manager interview?
Rays Power Infra interview process usually has 2 rounds. The most common rounds in the Rays Power Infra interview process are HR and Technical.

Recently Viewed

REVIEWS

Lalitpur Power Generation

No Reviews

REVIEWS

India Power Corporation

No Reviews

REVIEWS

Lalitpur Power Generation

No Reviews

REVIEWS

Lalitpur Power Generation

No Reviews

REVIEWS

Lalitpur Power Generation

No Reviews

REVIEWS

Lalitpur Power Generation

No Reviews

REVIEWS

Lalitpur Power Generation

No Reviews

REVIEWS

Lalitpur Power Generation

No Reviews

REVIEWS

Lalitpur Power Generation

No Reviews

REVIEWS

Lalitpur Power Generation

No Reviews

Tell us how to improve this page.

Rays Power Infra Deputy Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Rays Power Infra Deputy Manager Salary
based on 5 salaries
₹7 L/yr - ₹12.5 L/yr
At par with the average Deputy Manager Salary in India
View more details

Rays Power Infra Deputy Manager Reviews and Ratings

based on 3 reviews

4.5/5

Rating in categories

4.2

Skill development

4.5

Work-life balance

4.0

Salary

3.7

Job security

5.0

Company culture

4.1

Promotions

4.5

Work satisfaction

Explore 3 Reviews and Ratings
Electrical Engineer
28 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
24 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Rays Power Infra with

Adani Green Energy

4.1
Compare

Azure Power

3.9
Compare

Tata Power Solar

4.1
Compare

Hero Future Energies

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent