Upload Button Icon Add office photos

Filter interviews by

Ravi Infrabuild Projects Store Manager Interview Questions and Answers

Updated 13 Jun 2024

Ravi Infrabuild Projects Store Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. My experience how many years in store manager post
  • Q2. Manpower handling the store
Round 2 - Technical 

(2 Questions)

  • Q1. Bulk materials meaning & which plant construction site uses the road project
  • Ans. 

    Bulk materials refer to large quantities of raw materials or products, typically used in construction projects. Road projects often use bulk materials like gravel, asphalt, and concrete.

    • Bulk materials are materials that are transported and stored in large quantities, such as gravel, sand, asphalt, concrete, and soil.

    • These materials are commonly used in construction projects, including road construction sites.

    • Road proje...

  • Answered by AI
  • Q2. Store minimum balance handling on a monthly and sop full from
  • Ans. 

    Handling store minimum balance on a monthly basis and following standard operating procedures.

    • Monitor store's minimum balance regularly to ensure it meets requirements

    • Implement SOPs for handling minimum balance, including tracking, reporting, and replenishing

    • Train staff on proper procedures for maintaining minimum balance

    • Utilize software or tools to automate tracking and alerts for low balances

    • Regularly review and adju...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Friendly Interview's

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Logistics management Suppy Chain internet and CV.

Round 3 - Assignment 

Organization Amazon, Udaan and Dehaat skills assessment the same important working support.

Interview Preparation Tips

Interview preparation tips for other job seekers - Hi team,
Available CV ke datails logistics management skills development questions about them. Thanks
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Group Discussion 

Process of Goods receive, Material Issuence ,Inventory control ,Gate Pass of Job work Material

Interview Preparation Tips

Interview preparation tips for other job seekers - Work is worship, Experience is best Teacher of variable Industries
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Introducing, departments related advice, wastage, cost control, handling store and material

Round 2 - HR 

(2 Questions)

  • Q1. Expected sarlary
  • Q2. Noticed period, Negotiations
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Do you have store requirements
  • Ans. 

    Yes, I have store requirements to ensure smooth operations and customer satisfaction.

    • Yes, I have specific requirements for store layout and organization.

    • I require a certain level of inventory management to meet customer demand.

    • I have standards for customer service and employee training.

    • I may have specific technology or equipment requirements for the store.

    • Examples: specific shelving units, POS system, security cameras.

  • Answered by AI
  • Q2. I am sap software use 5 years
  • Q3. Material managment stock in out control inventory managment Loading to unloading maintain
  • Ans. 

    Effective material management is crucial for controlling stock in and out, maintaining inventory, and ensuring smooth loading and unloading processes.

    • Implementing a robust inventory management system to track stock levels and monitor movement

    • Regularly conducting stock audits to identify discrepancies and prevent stockouts or overstocking

    • Establishing efficient loading and unloading procedures to minimize delays and opti...

  • Answered by AI
  • Q4. Do you need store manager contact me

I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the standards used for plant layout in refineries
  • Ans. 

    Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.

    • Plant layout should prioritize safety and minimize the risk of accidents.

    • Efficiency is also important, with consideration given to the flow of materials and equipment.

    • Regulations and industry standards must be followed, such as those set by OSHA and API.

    • Examples of layout considerations include spacing between equipment,...

  • Answered by AI
  • Q2. What is the frequency on visiting Vendor Shops for expediting
  • Ans. 

    The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.

    • The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.

    • It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...

  • Answered by AI
  • Q3. Have You worked in CDU-VDU unit?
  • Q4. What is DCU?
  • Ans. 

    DCU stands for Dublin City University, a university located in Dublin, Ireland.

    • DCU was established in 1980 and has over 17,000 students.

    • It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.

    • DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.

    • Some not...

  • Answered by AI
  • Q5. Why it is called delayed?
  • Ans. 

    Delayed is called so because it refers to something that is postponed or occurs after the expected time.

    • The term 'delayed' is used to describe situations where there is a time lag or postponement.

    • It implies that something is not happening immediately or as scheduled.

    • Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.

    • For example, a delayed flight refers to ...

  • Answered by AI
  • Q6. What happens at CDU-VDU?

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one technical interview and final negotiation with HR

Skills evaluated in this interview

Interview experience
1
Bad
Difficulty level
-
Process Duration
4-6 weeks
Result
Selected Selected
Round 1 - One-on-one 

(5 Questions)

  • Q1. The MD of SPA group is a d**khead
  • Q2. Stupid question
  • Q3. The MD was arrogant
  • Q4. Nonsense questions he asked
  • Q5. No manners how to talk

Interview Preparation Tips

Interview preparation tips for other job seekers - The MD is quite rude

Store Incharge Interview Questions & Answers

Tata Projects user image Akhauri Rajeev Kumar Sinha

posted on 21 Nov 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Self Introduction
  • Q2. Technical, qualification, work experience,

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview questions are our working related and some general questions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. What is your role and responsibilities in current organisation
  • Q2. What size of team you handling
  • Q3. What is the maximum target you had achieved and explain how.
  • Ans. 

    I achieved a 150% increase in sales target by implementing a new marketing strategy.

    • Set ambitious but achievable targets

    • Analyzed market trends and customer behavior

    • Implemented a new marketing strategy focusing on customer engagement

    • Provided training and motivation to the sales team

    • Regularly monitored progress and made adjustments as needed

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is the notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Be master in your core field.Because your interview depends on your interviewers knowledge and hence you never underestimate them.Always show your leadership qualities,can handle big teams

Manager Interview Questions & Answers

Tata Projects user image Niteenkumar Belkoniker

posted on 24 May 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Background and qualifications
Round 2 - Technical 

(1 Question)

  • Q1. About experience

Ravi Infrabuild Projects Interview FAQs

How many rounds are there in Ravi Infrabuild Projects Store Manager interview?
Ravi Infrabuild Projects interview process usually has 2 rounds. The most common rounds in the Ravi Infrabuild Projects interview process are HR and Technical.
What are the top questions asked in Ravi Infrabuild Projects Store Manager interview?

Some of the top questions asked at the Ravi Infrabuild Projects Store Manager interview -

  1. bulk materials meaning & which plant construction site uses the road proj...read more
  2. store minimum balance handling on a monthly and sop full f...read more
  3. manpower handling the st...read more

Tell us how to improve this page.

Ravi Infrabuild Projects Store Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
J&F Interview Questions
3.8
 • 30 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all
Ravi Infrabuild Projects Store Manager Salary
based on 4 salaries
₹6 L/yr - ₹9 L/yr
28% more than the average Store Manager Salary in India
View more details

Ravi Infrabuild Projects Store Manager Reviews and Ratings

based on 2 reviews

3.6/5

Rating in categories

3.6

Skill development

3.6

Work-life balance

3.6

Salary

3.6

Job security

3.6

Company culture

3.6

Promotions

3.6

Work satisfaction

Explore 2 Reviews and Ratings
Store Keeper
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Structural Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

QA QC Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Asst Store
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

HR Executive
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Ravi Infrabuild Projects with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview