i
Rashmi Metaliks
Filter interviews by
To submit online tenders in different portals, follow the specific guidelines and procedures of each portal.
Research and identify the relevant portals for tender submission
Create an account on the chosen portal
Read and understand the guidelines and procedures for tender submission on the portal
Prepare the necessary documents and information required for the tender
Fill in the online tender form accurately and completely
...
A tender checklist ensures all necessary steps are followed in the tender process.
Identify the tender requirements
Gather all necessary documents and information
Prepare a tender response
Review and proofread the response
Submit the tender within the specified deadline
Follow up on the tender status
The basic need to submit a tender is a comprehensive understanding of the project requirements and the ability to meet those requirements.
Understanding the project requirements
Ability to meet the project requirements
Knowledge of the tendering process
Competitive pricing and cost estimation
Strong communication and presentation skills
Compliance with legal and regulatory requirements
Relevant experience and track record
Stro...
The number of days required to submit a tender depends on the complexity of the project and the availability of resources.
The timeline for submitting a tender varies depending on the scope of work and the level of detail required in the proposal.
Factors such as the size of the project, the number of stakeholders involved, and the level of competition can also impact the timeline.
It is important to carefully review the ...
Limited tender is restricted to a select group of suppliers, while open tender is open to all interested suppliers.
Limited tender is used when the buyer has pre-selected a few suppliers based on specific criteria.
Open tender allows any interested supplier to submit a bid.
Limited tender is often used for high-value or complex projects.
Open tender promotes competition and transparency.
Limited tender may require suppliers...
JV stands for Joint Venture. Blacklisting is the act of excluding a company from future business opportunities due to certain reasons.
JV refers to a business arrangement where two or more companies collaborate to undertake a specific project or venture.
Blacklisting is the process of placing a company on a list that restricts its access to future business opportunities.
Companies can be blacklisted for various reasons su...
Top trending discussions
posted on 10 Feb 2022
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 19 Jul 2024
A circuit diagram of hydraulics shows the flow of hydraulic fluid through a system of valves, cylinders, and pipes.
Hydraulic pump: generates pressure to move fluid through the system
Valves: control the direction and flow rate of the fluid
Cylinders: convert fluid pressure into mechanical force
Pipes: transport the fluid between components
Pressure gauges: monitor the pressure levels in the system
posted on 8 Mar 2025
I appeared for an interview before Mar 2024.
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 28 Jun 2023
I appeared for an interview before Jun 2022.
I applied via Naukri.com and was interviewed in Mar 2022. There was 1 interview round.
posted on 27 Dec 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.
Assistant Engineer
214
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Engineer
174
salaries
| ₹2 L/yr - ₹6.1 L/yr |
Assistant Manager
166
salaries
| ₹4 L/yr - ₹10 L/yr |
Senior Engineer
140
salaries
| ₹2.5 L/yr - ₹8 L/yr |
Junior Engineer
133
salaries
| ₹1.4 L/yr - ₹4.5 L/yr |
SHYAM METALICS AND ENERGY
Jai Balaji Group
Electrotherm
Welspun Corp