Upload Button Icon Add office photos

Filter interviews by

Ramoji Film City Assistant Electrical Engineer Interview Questions, Process, and Tips

Updated 19 Jan 2024

Ramoji Film City Assistant Electrical Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. Transformer protection
  • Ans. Over load and over voltage relay, earth fault, differential protection , Buchholz relay, thermal protection temp relay etc..
  • Answered Anonymously
  • Q2. Why machines ratings are in kVA instead of kW
  • Ans. 

    Machines ratings are in kVA instead of kW due to the presence of reactive power.

    • kVA represents the apparent power of a machine, which includes both real power (kW) and reactive power (kVAR).

    • Reactive power is required by machines with inductive or capacitive loads to create magnetic fields or store energy.

    • kW represents the actual power consumed or produced by a machine, while kVA represents the total power required to p...

  • Answered by AI
  • Q3. How single phase machines are designed
  • Ans. 

    Single phase machines are designed by using a single phase power supply and incorporating specific design elements.

    • Single phase machines use a single phase power supply, typically from a residential or commercial electrical system.

    • They are designed with specific components such as a single phase winding, a capacitor for starting, and a centrifugal switch for switching between starting and running modes.

    • Examples of sing...

  • Answered by AI
  • Q4. How transformer breath and what material used in this system?
  • Ans. 

    Transformers breathe through cooling systems and use materials like oil or air for insulation.

    • Transformers have cooling systems to dissipate heat generated during operation.

    • The cooling system can be either oil-based or air-based.

    • Oil-filled transformers use oil as a cooling and insulating medium.

    • Air-cooled transformers use fans or radiators to cool the windings.

    • The cooling system ensures the transformer operates within

  • Answered by AI
  • Q5. Parameters for synchronisation of DG set to bus bar
  • Ans. 

    Parameters for synchronisation of DG set to bus bar

    • Frequency matching between DG set and bus bar

    • Voltage matching between DG set and bus bar

    • Phase sequence matching between DG set and bus bar

    • Synchronisation panel settings

    • Proper earthing and grounding

    • Load sharing and load transfer

    • Protection and safety measures

  • Answered by AI
  • Q6. What is HG fuse and how does it works
  • Ans. 

    HG fuse is a high-grade fuse used in electrical systems to protect against overcurrents.

    • HG fuse stands for High-Grade fuse.

    • It is used in electrical systems to protect against overcurrents.

    • It works by melting a fuse element when excessive current flows through it.

    • The melting of the fuse element breaks the circuit and prevents damage to the electrical system.

    • HG fuses are commonly used in industrial applications and power

  • Answered by AI
  • Q7. What is the use of CT/PT
  • Ans. 

    CT/PT are used in electrical systems to measure and protect against high currents and voltages.

    • CT (Current Transformer) is used to measure high currents and step them down to a manageable level for measurement or protection devices.

    • PT (Potential Transformer) is used to measure high voltages and step them down to a safe level for measurement or protection devices.

    • CTs and PTs are commonly used in power systems, electrica...

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

I applied via Referral and was interviewed before Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is the UPS?
  • Ans. 

    UPS stands for Uninterruptible Power Supply. It is a device that provides emergency power to electrical equipment when the main power source fails.

    • UPS is used to protect sensitive electronic equipment from power surges, voltage fluctuations, and power outages.

    • It typically consists of a battery, an inverter, and a charger.

    • When the main power supply is interrupted, the UPS immediately switches to battery power to provide...

  • Answered by AI
  • Q2. What is the CDXL 30?
  • Ans. 

    The CDXL 30 is a type of electrical connector commonly used in industrial applications.

    • The CDXL 30 is a circular connector with 30 pins.

    • It is designed to provide a secure and reliable connection for electrical signals.

    • It is often used in machinery, automation systems, and control panels.

    • The CDXL 30 is known for its robustness and resistance to harsh environments.

    • It can handle high voltages and currents, making it suita...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Inox is a brand
And Inox Insignia cinema is awesome cinema.

Ramoji Film City Interview FAQs

How many rounds are there in Ramoji Film City Assistant Electrical Engineer interview?
Ramoji Film City interview process usually has 1 rounds. The most common rounds in the Ramoji Film City interview process are Technical.
What are the top questions asked in Ramoji Film City Assistant Electrical Engineer interview?

Some of the top questions asked at the Ramoji Film City Assistant Electrical Engineer interview -

  1. How transformer breath and what material used in this syst...read more
  2. Why machines ratings are in kVA instead of...read more
  3. Parameters for synchronisation of DG set to bus ...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Ramoji Film City interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

PVR Inox Interview Questions
4.0
 • 157 Interviews
Comcast Interview Questions
4.0
 • 71 Interviews
Cinépolis Interview Questions
3.9
 • 53 Interviews
HT Media Interview Questions
3.3
 • 48 Interviews
Viacom18 Media Interview Questions
3.5
 • 26 Interviews
Network 18 Interview Questions
3.4
 • 25 Interviews
Planetcast Interview Questions
3.7
 • 21 Interviews
View all

Ramoji Film City Assistant Electrical Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

4.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Assistant Manager
25 salaries
unlock blur

₹3.5 L/yr - ₹7 L/yr

Junior Executive
14 salaries
unlock blur

₹1.6 L/yr - ₹6 L/yr

Management Trainee
12 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Office Assistant
10 salaries
unlock blur

₹1.5 L/yr - ₹2.5 L/yr

Guest Relation Executive
8 salaries
unlock blur

₹2.4 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Ramoji Film City with

Filmcity Mumbai

4.8
Compare

EsselWorld

4.2
Compare

Adlabs Imagica

4.0
Compare

Wonderla Holidays

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview