Construction work procedure involves planning, designing, executing, and maintaining the project.
Planning the project and creating a blueprint
Obtaining necessary permits and approvals
Procuring materials and equipment
Executing the project according to the plan
Ensuring safety measures are in place
Testing and commissioning the project
Maintaining the project for longevity
Tile procedure is a method of laying tiles on a surface to create a pattern or design.
It involves measuring and marking the surface to ensure proper placement of tiles.
Adhesive is applied to the surface and the tiles are placed in the desired pattern.
Once the adhesive has dried, grout is applied to fill the gaps between the tiles.
The procedure requires precision and attention to detail to ensure a professional finish.
E...
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I applied via Company Website and was interviewed before Mar 2022. There was 1 interview round.
The manufacturing of cement involves chemical reactions with water, resulting in the durability of concrete.
Cement is made by heating limestone, clay, and other materials in a kiln
The chemical reaction between cement and water, known as hydration, results in the hardening of concrete
The durability of concrete depends on factors such as the water-cement ratio, curing time, and quality of materials used
Calculate deflection at free end of cantilever beam with point load at end
Use the formula: δ = (PL³)/(3EI)
P is the point load at the end
L is the length of the cantilever beam
E is the modulus of elasticity of the beam material
I is the moment of inertia of the beam's cross-sectional area
Example: A steel cantilever beam with a length of 2 meters and a point load of 500 N at the end has a deflection of 0.104 mm
Camber is the slope provided to the road surface to drain off rainwater. It is achieved by raising the center of the road surface.
Camber is the curvature provided to the road surface to ensure proper drainage of rainwater.
It is achieved by raising the center of the road surface.
The amount of camber depends on the width of the road and the expected rainfall.
The steps for the construction of a road include surveying, cle...
Admixtures are chemicals added to concrete to enhance its properties. They affect the workability, strength, and durability of concrete.
Admixtures are added to concrete to improve its quality and performance.
They can affect the setting time, workability, strength, and durability of concrete.
Examples of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers.
Hoop stress is the stress exerted circumferentially in a cylindrical or spherical object. Reinforcement in a dome can be provided by using steel bars or mesh.
Hoop stress is caused by the pressure inside the object and is calculated using the formula P*r/t, where P is the pressure, r is the radius, and t is the thickness of the object.
In a dome, reinforcement can be provided by using steel bars or mesh that are placed i...
Estimation and costing involves calculating the expenses of a project. No. of bricks required in 1 m3 of brickwork depends on the size of the bricks. There are various types of contracts in construction.
Estimation and costing involves calculating the expenses of a project, including materials, labor, and other costs.
No. of bricks required in 1 m3 of brickwork depends on the size of the bricks used. For example, if stan...
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
19
salaries
| ₹4 L/yr - ₹8 L/yr |
Senior Executive
19
salaries
| ₹3 L/yr - ₹5 L/yr |
Senior Engineer
14
salaries
| ₹2.9 L/yr - ₹6 L/yr |
Senior Assistant Manager
9
salaries
| ₹6 L/yr - ₹7.7 L/yr |
Civil Engineer
9
salaries
| ₹2.3 L/yr - ₹4.4 L/yr |
L&T Construction
AECOM
AtkinsRealis
Saipem