I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction work procedure involves planning, designing, executing, and maintaining the project.
Planning the project and creating a blueprint
Obtaining necessary permits and approvals
Procuring materials and equipment
Executing the project according to the plan
Ensuring safety measures are in place
Testing and commissioning the project
Maintaining the project for longevity
Tile procedure is a method of laying tiles on a surface to create a pattern or design.
It involves measuring and marking the surface to ensure proper placement of tiles.
Adhesive is applied to the surface and the tiles are placed in the desired pattern.
Once the adhesive has dried, grout is applied to fill the gaps between the tiles.
The procedure requires precision and attention to detail to ensure a professional finish.
E...
Top trending discussions
posted on 19 Feb 2025
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
EPC stands for Engineering, Procurement, and Construction. It is a type of project delivery method used in construction and engineering industries.
EPC projects involve a single contractor who is responsible for the entire project from start to finish.
The contractor is responsible for designing, procuring materials and equipment, and constructing the project.
EPC projects are commonly used in industries such as oil and g...
Safety refers to the condition of being protected from harm, injury, or danger.
Safety involves taking measures to prevent accidents and injuries.
It includes identifying and mitigating potential hazards in the workplace or environment.
Safety also involves following established protocols and procedures to minimize risk.
Examples of safety measures include wearing protective gear, using safety equipment, and practicing saf...
Preliminary in bid refers to the initial stage of the bidding process where the bidder submits a rough estimate of the project cost.
Preliminary bid is a rough estimate of the project cost submitted by the bidder at the initial stage of the bidding process.
It is also known as a preliminary proposal or preliminary quotation.
The preliminary bid helps the client to shortlist the bidders for the next stage of the bidding pr...
Tender includes all the necessary documents and information required for a project or service to be bid on by potential contractors.
Tender documents provide details about the project or service, such as scope of work, timelines, and budget.
Tender also includes terms and conditions for bidding, evaluation criteria, and submission requirements.
Examples of tender documents include request for proposal (RFP), request for q
Pricing preamble refers to the introductory statement or explanation of the pricing structure.
It is a statement that precedes the actual pricing information.
It provides context and explanation for the pricing structure.
It may include information about discounts, fees, or other charges.
Example: 'The following prices are for standard packages. Additional fees may apply for customization.'
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
19
salaries
| ₹4 L/yr - ₹8 L/yr |
Senior Executive
19
salaries
| ₹3 L/yr - ₹5 L/yr |
Senior Engineer
14
salaries
| ₹2.9 L/yr - ₹6 L/yr |
Senior Assistant Manager
9
salaries
| ₹6 L/yr - ₹7.7 L/yr |
Civil Engineer
9
salaries
| ₹2.3 L/yr - ₹4.4 L/yr |
GMR Group
Larsen & Toubro Limited
Tata Group
Adani Group