Filter interviews by
I applied via Referral and was interviewed before Feb 2021. There were 3 interview rounds.
Top trending discussions
Cracks in beams typically develop at locations of high stress concentrations or due to external factors like corrosion.
Cracks can develop at the supports of the beam where the bending moment is highest.
Cracks can also form at locations where there are changes in cross-section or material properties.
External factors like corrosion can lead to cracks in beams over time.
Cracks may also develop at locations where there are...
Different types of slab concrete testing include slump test, air content test, compressive strength test, and flexural strength test.
Slump test measures the consistency and workability of concrete.
Air content test determines the amount of air trapped in the concrete mixture.
Compressive strength test assesses the ability of concrete to withstand loads.
Flexural strength test evaluates the bending strength of concrete.
posted on 28 Dec 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 4 interview rounds.
The current market labour rate and material price can vary depending on location, demand, and supply.
Labour rates can be influenced by factors such as skill level, experience, and union agreements.
Material prices can fluctuate due to changes in raw material costs, transportation expenses, and market demand.
It is important to regularly monitor market trends and industry news to stay informed about labour rates and mater
posted on 22 Dec 2024
I applied via Referral and was interviewed before Dec 2023. There were 2 interview rounds.
The benefits of a healthy work-life culture contribute significantly to project growth.
To ensure the company's growth rate continues to escalate, I would implement strategic planning, market research, and team collaboration.
Develop a comprehensive strategic plan outlining short-term and long-term goals.
Conduct market research to identify new opportunities and target markets.
Collaborate with cross-functional teams to streamline processes and improve efficiency.
Invest in employee training and development t...
Safety and quality in the workplace are crucial for protecting employees, maintaining productivity, and ensuring customer satisfaction.
Ensures the well-being and health of employees
Reduces the risk of accidents and injuries
Improves productivity and efficiency
Enhances customer satisfaction and loyalty
Helps maintain a positive reputation for the company
Examples: Implementing safety protocols, conducting regular quality c
posted on 29 May 2022
Site safety management involves identifying and mitigating potential hazards to ensure a safe work environment.
Conduct regular safety audits and inspections
Provide safety training to all workers
Implement safety protocols and procedures
Ensure proper use of personal protective equipment
Encourage reporting of safety concerns and incidents
posted on 19 Feb 2022
posted on 26 Jan 2022
posted on 24 Mar 2023
I applied via Job Portal and was interviewed before Mar 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 2 interview rounds.
The dry cost of a project can be calculated by subtracting the cost of materials and equipment from the total project cost.
Determine the total project cost by adding up all the expenses, including labor, materials, equipment, and overhead costs.
Identify the cost of materials and equipment used in the project.
Subtract the cost of materials and equipment from the total project cost to obtain the dry cost.
Dry cost = Total
Rolling margin of steel refers to the difference between the initial thickness of a steel plate and its final thickness after undergoing the rolling process.
Rolling margin is a measure of the reduction in thickness that occurs during the rolling process.
It is calculated by subtracting the final thickness of the steel plate from its initial thickness.
The rolling margin is influenced by factors such as the type of steel,...
posted on 19 Dec 2023
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
Civil Engineer
15
salaries
| ₹2.2 L/yr - ₹5.8 L/yr |
Civil Site Engineer
15
salaries
| ₹2.5 L/yr - ₹5.2 L/yr |
Billing Engineer
12
salaries
| ₹3.6 L/yr - ₹9.2 L/yr |
Accountant
9
salaries
| ₹2.7 L/yr - ₹3 L/yr |
Civil Foreman
9
salaries
| ₹3.2 L/yr - ₹4.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company