  • Q1. Can you handle your work

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good and satisfying

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Brief description about the requirements and job description.
Round 2 - Technical 

(1 Question)

  • Q1. Virtual Technical interview
Round 3 - Technical 

(1 Question)

  • Q1. Face to face technicsl interview
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Surveyor assistant working
  • Q2. Advance land surveyors

Interview Preparation Tips

Interview preparation tips for other job seekers - Surveyor
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Question regarding Qs and Is 1200 having knowledge of L section and Cross section
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation and joining date notice period

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. How can do surveyor work?
  • Ans. 

    Surveyors measure and map land, airspace, and water features to determine property boundaries and prepare construction sites.

    • Surveyors use specialized equipment such as GPS, total stations, and drones to collect data.

    • They analyze the data to create maps, legal descriptions, and other documents.

    • Surveyors work in various industries including construction, engineering, and government.

    • They must have knowledge of math, phys...

  • Answered by AI
  • Q2. How can do detail surveyor?
  • Ans. 

    To do a detailed survey, a surveyor must use precise instruments and techniques to accurately measure and record data.

    • Use high-precision instruments such as total stations and GPS receivers

    • Take multiple measurements to ensure accuracy

    • Record data in a clear and organized manner

    • Consider environmental factors that may affect measurements

    • Collaborate with other professionals to ensure comprehensive data collection

    • Use softwa...

  • Answered by AI
  • Q3. How can do layout and line level check?
  • Ans. 

    Layout and line level check can be done using various tools and techniques.

    • Use a theodolite or total station to measure angles and distances accurately.

    • Use a level to ensure that the ground is level and the lines are straight.

    • Use string lines and pegs to mark out the layout of the site.

    • Check the measurements and levels regularly to ensure accuracy.

    • Make adjustments as necessary to ensure that the layout and lines are co

  • Answered by AI
  • Q4. What is surveyor work ?
  • Ans. 

    Surveyor work involves measuring and mapping land, buildings, and other physical features.

    • Using specialized equipment to take precise measurements

    • Creating maps and drawings to represent the data collected

    • Working with architects, engineers, and construction teams

    • Ensuring compliance with local regulations and laws

    • Surveying land for potential development or construction projects

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My name is dinesh Shrestha i from Gorkha in Nepal i am surveyor cuntiune surveyor work 2 year .now surveyor work .thank you.

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Tell me about total station?
  • Q2. What is the tollerence of subgrade top?
  • Ans. 

    The tolerance of subgrade top refers to the acceptable deviation from the specified elevation of the subgrade surface.

    • Tolerance of subgrade top is typically specified in project plans or specifications.

    • It is important to measure and ensure that the subgrade top meets the specified tolerance to ensure proper construction of the pavement layers.

    • For example, a typical tolerance for subgrade top may be +/- 0.1 feet from th

  • Answered by AI
  • Q3. Tell me about transition curve?
  • Ans. 

    Transition curve is a curve that connects a straight line with a circular curve in a smooth and gradual manner.

    • Transition curve is used in civil engineering and transportation engineering to ensure smooth transition between different types of curves.

    • It helps in reducing discomfort for passengers and minimizing wear and tear on vehicles.

    • Examples of transition curves include clothoid, cubic parabola, and spiral curves.

  • Answered by AI
  • Q4. Difference between camber and gradient?
  • Ans. 

    Camber is the curvature of the road surface while gradient is the slope of the road surface.

    • Camber refers to the curvature of the road surface, typically used to aid in water drainage.

    • Gradient refers to the slope of the road surface, indicating the rate of incline or decline.

    • Camber is measured in percentage or ratio, while gradient is measured in degrees or percentage.

    • Example: A road with a positive camber will slope s...

  • Answered by AI
  • Q5. Sallery expectations?

I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What is your experience and CTC What is knowledge in sub station Lines
  • Ans. 7 year s my experience Substation also knowledge in foundation work ex, equipment tower cable trench Line also detailed survey Check survey props settings all type towers
  • Answered Anonymously
  • Q2. Computer knowledge
  • Ans. Computer knowledge is autocad Ms office All types layout marking Towe shedule preparing
  • Answered Anonymously
  • Q3. 8 years experience
  • Q4. MsOFFICE auto cad

Interview Preparation Tips

Interview preparation tips for other job seekers - Godd company recruiter also good

I applied via Referral and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. Where do you see yourself in 5 years?
  • Q5. What are your strengths and weaknesses?
  • Q6. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Vikran engineering exim Pvt Ltd good company rules & hr rules

I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is principal of Surveying
  • Ans. 

    The principal of surveying involves accurately measuring and mapping the physical features of the land.

    • Surveying involves measuring and mapping land features such as boundaries, elevations, and distances.

    • The principal of surveying requires the use of specialized equipment such as total stations and GPS receivers.

    • Surveying is used in a variety of industries including construction, engineering, and land development.

    • Accur...

  • Answered by AI
  • Q2. Traversing

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil & land Surveying

I was interviewed before Sep 2016.

Interview Preparation Tips

Round: Group Discussion
Experience: held technical interview
Tips: express technical expertise
Duration: 2 hours

Round: Group Discussion
Experience: visa transfer discussion
Duration: 1 hour

Tell us how to improve this page.

People are getting interviews through

based on 1 Raj Shyama Construction interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Raj Shyama Construction Senior Surveyor Salary
based on 4 salaries
₹4.5 L/yr - ₹5 L/yr
27% less than the average Senior Surveyor Salary in India
View more details

Raj Shyama Construction Senior Surveyor Reviews and Ratings

based on 2 reviews

3.6/5

Rating in categories

3.6

Skill development

3.6

Work-Life balance

3.6

Salary & Benefits

3.6

Job Security

3.6

Company culture

3.6

Promotions/Appraisal

3.6

Work Satisfaction

Explore 2 Reviews and Ratings
Senior Highway Engineer
7 salaries
unlock blur

₹3.8 L/yr - ₹6.2 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

QA QC Engineer
6 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Structural Engineer
6 salaries
unlock blur

₹1.4 L/yr - ₹5.4 L/yr

Project Manager
6 salaries
unlock blur

₹16.5 L/yr - ₹23.4 L/yr

Explore more salaries
Compare Raj Shyama Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview