I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
There are several types of cement tests, including compressive strength test, fineness test, setting time test, soundness test, etc.
Compressive strength test measures the ability of cement to withstand loads without breaking.
Fineness test determines the particle size of cement.
Setting time test measures the time taken for cement to set.
Soundness test checks the stability of cement when exposed to moisture.
Other tests i...
There are several types of physical tests that can be conducted on cement to ensure quality and performance.
Setting time test
Soundness test
Fineness test
Compressive strength test
Specific gravity test
The number of tests for modified bitumen can vary depending on the specific requirements and standards of the project.
The number of tests for modified bitumen may include tests for physical properties, chemical composition, durability, and performance under various conditions.
Common tests for modified bitumen include penetration test, softening point test, ductility test, and viscosity test.
The specific number of tests...
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
Top trending discussions
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Stop work application is a procedure used to halt work activities due to safety concerns or violations.
Stop work applications are typically used when there is an imminent danger to workers or the environment.
Workers are trained to recognize when a stop work application is necessary and how to properly implement it.
Examples of reasons for a stop work application include unsafe working conditions, equipment malfunctions,
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.
Scaffolding provides a safe working platform at height
It is typically made of metal or wood
Different types include tube and coupler, frame, and system scaffolding
Scaffolding must be inspected regularly for safety
Types of scaffolding include supported scaffolding, suspended scaffolding, and aerial lifts.
Supported scaffolding is the most common type and is supported by the ground or a building structure.
Suspended scaffolding hangs from the roof or top of a building and is commonly used for window washing or painting.
Aerial lifts are platforms lifted by cranes or other equipment and are commonly used for tasks at height.
Other typ...
Types of accidents/incidents include slips, trips, falls, machinery accidents, chemical exposures, and fires.
Slips, trips, and falls are common in workplaces due to wet floors, cluttered walkways, or uneven surfaces.
Machinery accidents can occur when proper safety procedures are not followed or equipment malfunctions.
Chemical exposures may result from spills, leaks, or improper handling of hazardous substances.
Fires ca...
posted on 13 Feb 2025
I was interviewed in Jan 2025.
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
I was interviewed in Jan 2025.
based on 1 interview
Interview experience
based on 25 reviews
Rating in categories
Civil Site Engineer
6
salaries
| ₹2.4 L/yr - ₹3 L/yr |
QA QC Engineer
6
salaries
| ₹3.2 L/yr - ₹5 L/yr |
Structural Engineer
6
salaries
| ₹1.4 L/yr - ₹5.4 L/yr |
Project Manager
6
salaries
| ₹16.5 L/yr - ₹23.4 L/yr |
Senior Engineer
6
salaries
| ₹3.4 L/yr - ₹7.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group