I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Where are you work and which company
  • Ans. I'm Recent work in Baghpat and company name is Raj shyama Construction pvt ltd
  • Answered Anonymously
Round 3 - Technical 

(5 Questions)

  • Q1. How many types of Cement Test
  • Ans. 

    There are several types of cement tests, including compressive strength test, fineness test, setting time test, soundness test, etc.

    • Compressive strength test measures the ability of cement to withstand loads without breaking.

    • Fineness test determines the particle size of cement.

    • Setting time test measures the time taken for cement to set.

    • Soundness test checks the stability of cement when exposed to moisture.

    • Other tests i...

  • Answered by AI
  • Q2. How many types of physical test in cement
  • Ans. 

    There are several types of physical tests that can be conducted on cement to ensure quality and performance.

    • Setting time test

    • Soundness test

    • Fineness test

    • Compressive strength test

    • Specific gravity test

  • Answered by AI
  • Q3. There are 5 test of physical test in cement First of all Fineness Test 2nd:-Standard Consistency Test 3rd:- Intial & final setting 4th:- Comprehensive test 5th:- Soundness Test
  • Q4. How many test of modified bitumen.plz say!
  • Ans. 

    The number of tests for modified bitumen can vary depending on the specific requirements and standards of the project.

    • The number of tests for modified bitumen may include tests for physical properties, chemical composition, durability, and performance under various conditions.

    • Common tests for modified bitumen include penetration test, softening point test, ductility test, and viscosity test.

    • The specific number of tests...

  • Answered by AI
  • Q5. 1:- Softening point 2:- Penetration test 3:- elastic Recovery Test 4:- Viscosity Test (A):- Absolute Viscosity Test (B):- kinamatic viscosity Test

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the mix design how we do the mix design of concrete
  • Ans. 

    Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete to achieve desired properties.

    • Determine the required strength and durability of the concrete

    • Select suitable materials such as cement, aggregates, water, and admixtures

    • Calculate the proportions of each material based on desired properties and specifications

    • Perform trial mixes to test the properties of the co...

  • Answered by AI
  • Q2. All material testings and procedures
  • Q3. Finishing activities

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job platform we get good knowledge of all construction activities.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the mix design how we do the mix design of concrete
  • Ans. 

    Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete to achieve desired properties.

    • Determine the required strength and durability of the concrete

    • Select suitable materials such as cement, aggregates, water, and admixtures

    • Calculate the proportions of each material based on desired properties and specifications

    • Perform trial mixes to test the properties of the co...

  • Answered by AI
  • Q2. All material testings and procedures
  • Q3. Finishing activities

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job platform we get good knowledge of all construction activities.

I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about yourself.
  • Q2. What are your salary expectations?
  • Q3. Share details of your previous job.
Round 3 - Technical 

(1 Question)

  • Q1. Raw materials inspection, WPS,WPQ,FQP Preperation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be knowledgeable and experienced regarding your work

Raj Shyama Construction Interview FAQs

How many rounds are there in Raj Shyama Construction Quality Engineer interview?
Raj Shyama Construction interview process usually has 3 rounds. The most common rounds in the Raj Shyama Construction interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Raj Shyama Construction Quality Engineer interview?

Some of the top questions asked at the Raj Shyama Construction Quality Engineer interview -

  1. How many types of physical test in cem...read more
  2. How many test of modified bitumen.plz s...read more
  3. How many types of Cement T...read more

Tell us how to improve this page.

Senior Highway Engineer
7 salaries
unlock blur

₹3.8 L/yr - ₹6.2 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

QA QC Engineer
6 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Structural Engineer
6 salaries
unlock blur

₹1.4 L/yr - ₹5.4 L/yr

Project Manager
6 salaries
unlock blur

₹16.5 L/yr - ₹23.4 L/yr

Explore more salaries
Compare Raj Shyama Construction with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview