Rate analysis involves calculating the cost of construction materials and labor for specific items.
Identify the item to be analyzed
Determine the quantity required for the item
Calculate the cost of materials and labor for the item
Add overhead costs and profit margin to the total cost
Divide the total cost by the quantity to get the rate per unit
Examples: rate analysis for concrete, steel reinforcement, plastering, electr
Top trending discussions
posted on 6 Jan 2021
I applied via Approached by Company and was interviewed before Jan 2020. There were 2 interview rounds.
To submit client related documents, follow these steps:
Ensure all required documents are complete and accurate
Organize the documents in a logical order
Create a cover letter or email explaining the purpose of the submission
Use a secure method of transmission, such as email with password protection or a secure file-sharing platform
Confirm receipt of the documents with the client
Maintain a record of all submitted document
based on 1 interview
Interview experience
QS Engineer
6
salaries
| ₹3.1 L/yr - ₹5 L/yr |
Senior Quantity Surveyor
5
salaries
| ₹4 L/yr - ₹6.2 L/yr |
Quality Surveyor and Project Engineer
5
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Project Engineer
4
salaries
| ₹5.5 L/yr - ₹8.5 L/yr |
Quantity Surveyor
3
salaries
| ₹3.2 L/yr - ₹5.5 L/yr |
PwC
KPMG India
Ernst & Young
Deloitte