Filter interviews by
Terminating all engineers can lead to operational disruptions and loss of expertise, impacting service quality and efficiency.
Loss of expertise: Engineers possess specialized knowledge; their termination can create knowledge gaps.
Operational disruptions: Without engineers, maintenance and repairs may be delayed, affecting service delivery.
Increased workload: Remaining staff may face increased pressure, leading to burno...
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There was 1 interview round.
By analyzing project requirements, scheduling deliveries, and coordinating with project managers.
Analyze project requirements such as volume of concrete needed, distance to project site, and project timeline
Schedule deliveries based on project milestones and deadlines
Coordinate with project managers to understand project progress and adjust RMC truck requirements accordingly
Estimating concrete requirement and batching plant capacity is crucial for planning and executing construction projects efficiently.
Estimating concrete requirement involves calculating the volume of concrete needed for a project based on the design and specifications.
Batching plant capacity refers to the maximum amount of concrete that can be produced by the plant in a given time period.
Having an accurate estimate of c...
A concrete pump is a machine used to transfer liquid concrete by pumping it through pipes to the desired location.
Concrete is loaded into the hopper of the pump.
The pump uses a piston or rotary pump to push the concrete through a pipe and hose to the desired location.
The pump can be mounted on a truck or trailer for easy mobility.
Different types of pumps are used for different applications, such as high-rise buildings
To close a deal when costlier than other brands, focus on value proposition, unique selling points, and building strong relationships.
Highlight the unique features and benefits of your product or service
Emphasize the value and return on investment that your product or service offers
Provide evidence of superior quality, reliability, or performance
Offer flexible payment options or discounts to mitigate the price differen...
posted on 7 May 2024
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 4 interview rounds.
Putzmeister Concrete Machines interview questions for popular designations
I applied via Approached by Company and was interviewed before May 2021. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.
I am a Service Engineer with expertise in troubleshooting and repairing complex machinery.
Experienced in diagnosing and resolving technical issues in industrial equipment
Proficient in using diagnostic tools and software to identify problems
Skilled in performing maintenance and repairs on various types of machinery
Strong problem-solving and communication skills
Ability to work independently and under pressure
Example: Suc...
The speed difference in a hydraulic ram is due to the difference in effective areas on the head side and rod side.
The head side of the ram has a larger effective area, resulting in slower speed.
The rod side of the ram has a smaller effective area, resulting in faster speed.
This speed difference is a result of the hydraulic pressure acting on different areas.
The speed ratio between the head side and rod side can be calc...
A pressure relief valve is used to protect equipment and systems from excessive pressure by releasing the pressure when it exceeds a certain limit.
Prevents damage to equipment and systems
Ensures safety of personnel
Maintains system integrity
Prevents explosions or ruptures
Relieves excess pressure by opening and releasing fluid or gas
Commonly used in boilers, pressure vessels, pipelines, and hydraulic systems
An orifice is a small opening or hole through which fluid or gas can flow.
Orifices are commonly used in various industries, such as plumbing, engineering, and manufacturing.
They are often used to control the flow rate of fluids or gases.
Orifices can be found in devices like nozzles, valves, and flow meters.
The size of an orifice determines the flow rate and pressure drop across it.
Examples of orifices include the tiny ...
I am looking for a job change to explore new opportunities and challenges.
Seeking career growth and advancement
Wanting to work in a different industry or with different technologies
Desire for a better work-life balance
Relocation or proximity to family
Unsatisfactory current job situation
I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.
Open loop and closed loop are two modes of operation in hydraulic systems.
Open loop operation: The hydraulic system operates without feedback control. The output is not adjusted based on the system's performance.
Closed loop operation: The hydraulic system uses feedback control to adjust the output based on the system's performance.
Open loop systems are simpler and less expensive, but they lack precision and accuracy.
Cl...
The starting circuit is responsible for initiating the engine's operation.
The starting circuit consists of components such as the battery, starter motor, ignition switch, and solenoid.
When the ignition switch is turned on, it sends a signal to the solenoid, which then engages the starter motor.
The starter motor uses electrical energy from the battery to turn the engine's crankshaft, starting the combustion process.
Once...
I am a highly skilled and experienced service engineer with a proven track record of successfully troubleshooting and resolving complex technical issues.
I have a strong technical background and extensive experience in diagnosing and repairing equipment.
I am a quick learner and can adapt to new technologies and processes easily.
I have excellent communication skills and can effectively communicate with customers and team...
My core values include integrity, accountability, and continuous learning.
Integrity: I believe in always doing the right thing, even when no one is watching.
Accountability: I take ownership of my actions and responsibilities.
Continuous learning: I strive to constantly improve my skills and knowledge.
Example: I once discovered a mistake in a project I was working on, and instead of ignoring it, I took responsibility and...
I applied via Naukri.com
Some of the top questions asked at the Putzmeister Concrete Machines interview for experienced candidates -
The duration of Putzmeister Concrete Machines interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 4 interviews
Interview experience
based on 165 reviews
Rating in categories
Service Engineer
74
salaries
| ₹2.8 L/yr - ₹6.4 L/yr |
Senior Service Engineer
29
salaries
| ₹5.8 L/yr - ₹8.3 L/yr |
Senior Executive
29
salaries
| ₹4 L/yr - ₹9 L/yr |
Assistant Manager
27
salaries
| ₹7 L/yr - ₹12.7 L/yr |
Assistant Manager Service
13
salaries
| ₹6 L/yr - ₹10.5 L/yr |
Gilbarco Veeder Root
Kirloskar Toyota Textile Machinery
L&T–MHI Power Boilers
Hyundai Construction Equipment