Upload Button Icon Add office photos

Punj Lloyd

Compare button icon Compare button icon Compare

Filter interviews by

Punj Lloyd Interview Questions, Process, and Tips for Experienced

Updated 8 Nov 2024

Top Punj Lloyd Interview Questions and Answers for Experienced

View all 12 questions

Punj Lloyd Interview Experiences for Experienced

Popular Designations

12 interviews found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Progress between Job planning and target
  • Ans. 

    Progress between job planning and target is monitored closely to ensure project stays on schedule.

    • Regularly track progress against the project schedule

    • Identify any delays or obstacles and address them promptly

    • Adjust the plan as needed to stay on track

    • Communicate with stakeholders about any changes or updates

    • Use project management software to help monitor progress

  • Answered by AI
  • Q2. Good communication skill with clients
  • Q3. Good behaviour with workers
  • Q4. Follow the project specifications
  • Q5. Follow the HSE norms

Project Construction Manager Interview Questions asked at other Companies

Q1. Progress between Job planning and target
View answer (3)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is documentation and Process of documentation
  • Ans. 

    Documentation is the process of recording information in a systematic way to ensure accuracy and traceability.

    • Documentation involves creating written or electronic records of processes, procedures, and activities.

    • It helps in maintaining a clear record of what has been done, by whom, and when.

    • Documentation ensures consistency, compliance with regulations, and facilitates knowledge transfer.

    • Examples include project plans...

  • Answered by AI
  • Q2. What about attitudes and knowledge of software
  • Ans. 

    Attitudes and knowledge of software are crucial for a Department Head.

    • Strong knowledge of various software programs and applications is essential for effective management.

    • Positive attitudes towards learning new software and adapting to technological advancements are beneficial.

    • Experience in implementing software solutions to improve department efficiency and productivity is valuable.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work seriously on your workstation

Department Head Interview Questions asked at other Companies

Q1. If you are able to manage a class of students where you might expect a fast and a slow learner?
View answer (7)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Design offshore project
  • Ans. 

    Designing an offshore project involves planning, executing, and managing operations in a marine environment.

    • Identify project objectives and scope

    • Conduct feasibility studies and risk assessments

    • Select suitable location and design layout

    • Procure necessary equipment and materials

    • Implement safety measures and environmental protection protocols

    • Establish communication and logistics plan

    • Monitor progress and adjust plans as nee

  • Answered by AI
  • Q2. Offshore analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay positive

Management Trainee Interview Questions asked at other Companies

Q1. What do you mean by balance sheet reconciliation could you explain briefly?
View answer (45)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to piping knowledge as per ASME Section
Round 2 - HR 

(1 Question)

  • Q1. Working culture and salary package

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (72)

Punj Lloyd interview questions for popular designations

 HSE Engineer

 (2)

 Deputy Manager

 (2)

 Purchase Assistant

 (1)

 Management Trainee

 (1)

 Department Head

 (1)

 Data Engineer

 (1)

 Senior Mechanic

 (1)

 Senior Executive

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Salary Expectation
  • Q2. How soon you can join
  • Q3. Able to relocate
  • Ans. 

    Yes, I am willing to relocate for the right opportunity.

    • I am open to relocating for a better career prospect

    • I have relocated in the past for job opportunities

    • I am flexible and willing to move for the right role

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answer the Interviewer with to the point

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)

Get interview-ready with Top Punj Lloyd Interview Questions

TIG Welder Interview Questions & Answers

user image Anonymous

posted on 3 May 2021

Interview Questionnaire 

2 Questions

  • Q1. 1. What is the reason for cracking in welding?
  • Ans. 

    Cracking in welding can occur due to various reasons such as improper welding technique, high stress, and material defects.

    • Improper welding technique such as using too much heat or not using enough filler material

    • High stress on the welded joint due to external forces or thermal expansion/contraction

    • Material defects such as impurities or inclusions in the base metal

    • Inadequate preheating or post-weld heat treatment

    • Incomp...

  • Answered by AI
  • Q2. In TIG welding, instead of argon gas, only a small gas can be used.
  • Ans. 

    No, in TIG welding, argon gas is essential for shielding the weld area.

    • Argon gas is commonly used in TIG welding to create an inert atmosphere around the weld area.

    • The inert atmosphere prevents oxidation and contamination of the weld, resulting in high-quality welds.

    • Using a small gas or any other gas instead of argon can lead to poor weld quality and potential defects.

    • Examples of other gases that cannot be used in TIG ...

  • Answered by AI

TIG Welder Interview Questions asked at other Companies

Q1. 1. What is the reason for cracking in welding?
View answer (1)

I applied via Company Website and was interviewed before Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Explain water cement ratio in concrete? What you will recommend if cube strength differ 12% ?
  • Ans. 

    Water cement ratio in concrete is the ratio of the weight of water to the weight of cement used in the mixture.

    • Water cement ratio is an important factor in determining the strength and durability of concrete.

    • A lower water cement ratio generally results in higher strength concrete.

    • If the cube strength differs by 12%, it indicates a significant variation in the concrete mix.

    • To address this, the water cement ratio can be ...

  • Answered by AI
  • Q2. What necessary steps during excavation work 5 meter deep by Excavator?
  • Ans. 

    Necessary steps during excavation work 5 meter deep by Excavator

    • Ensure proper shoring and bracing to prevent cave-ins

    • Regularly inspect the excavation site for any signs of instability

    • Provide adequate lighting and ventilation in the excavation area

    • Ensure proper communication between the excavator operator and ground personnel

    • Have a rescue plan in place in case of emergencies

  • Answered by AI
  • Q3. How you complete the work if it going two months behind of schedule. Will it affect project cost.
  • Q4. How you will utilize man and machine power.
  • Ans. 

    I will assign tasks based on the strengths of each worker and use machines for heavy lifting and repetitive tasks.

    • Assess the skills and abilities of each worker

    • Assign tasks based on their strengths

    • Use machines for heavy lifting and repetitive tasks

    • Train workers to use machines safely and efficiently

    • Regularly maintain and repair machines to ensure they are functioning properly

  • Answered by AI
  • Q5. Is safety aspect is essential or not.if yes what is PPE.what you take precautions while working in remote and gaseous 2 meter deep area.
  • Ans. 

    Safety aspect is essential. PPE stands for Personal Protective Equipment. Precautions include proper ventilation and use of gas detectors.

    • Safety is a top priority in any construction project.

    • PPE includes hard hats, safety glasses, gloves, and respirators.

    • Working in a remote and gaseous 2 meter deep area requires proper ventilation and use of gas detectors.

    • Workers should also be trained on emergency procedures in case o

  • Answered by AI
  • Q6. What are the working time in previous company?Have you ready to work in night time also.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Practical and give answer like problem solving nature without affecting extra cost.

Civil Superintendent Interview Questions asked at other Companies

Q1. Explain water cement ratio in concrete? What you will recommend if cube strength differ 12% ?
View answer (3)

I applied via Naukri.com and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Department related questions
Round 2 - Technical 

(1 Question)

  • Q1. Management question, site related questions
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations, job location

Interview Preparation Tips

Topics to prepare for Punj Lloyd HSE Engineer interview:
  • Construction related
Interview preparation tips for other job seekers - Nice company, once got a chance in this organization u never left from this

HSE Engineer Interview Questions asked at other Companies

Q1. What safety measures might be followed during the lifting operation in the working premises?
View answer (2)

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Gm 

(3 Questions)

  • Q1. What is your last project and its site design
  • Q2. What is the covered area of project
  • Ans. 

    The covered area of the project is approximately 10,000 square feet.

    • The covered area includes the indoor space of the project.

    • It does not include any outdoor space or open areas.

    • The exact covered area may vary depending on the project.

    • In this particular project, the covered area is approximately 10,000 square feet.

  • Answered by AI
  • Q3. What type of building

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (72)

I appeared for an interview before Jul 2016.

Interview Questionnaire 

2 Questions

  • Q1. All questions from structure especially from psc guader.
  • Q2. How munch salery you getting from present employer and what is your expectations.
  • Ans. 

    I am currently receiving a salary of $60,000 from my present employer. My salary expectation for this role is in the range of $70,000 to $80,000.

    • Current salary: $60,000

    • Salary expectation: $70,000 - $80,000

    • Open to negotiation based on benefits and responsibilities

  • Answered by AI

Interview Preparation Tips

Round: Resume Shortlist
Experience: Just sent my resume
Tips: You have to send your resume to write email

Round: Technical Interview
Experience: I was comfortably selected I knew during interview.
Tips: Listen first during interview don't try to over smart.

Round: HR Interview
Experience: I simply told them the actual current CTC and expected CTC is 20% more.
Tips: Just give them the true details.

Skills: Structural Engineering

Punj Lloyd Interview FAQs

How many rounds are there in Punj Lloyd interview for experienced candidates?
Punj Lloyd interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the Punj Lloyd interview process for experienced candidates are Technical, HR and Resume Shortlist.
What are the top questions asked in Punj Lloyd interview for experienced candidates?

Some of the top questions asked at the Punj Lloyd interview for experienced candidates -

  1. Explain water cement ratio in concrete? What you will recommend if cube strengt...read more
  2. Is safety aspect is essential or not.if yes what is PPE.what you take precautio...read more
  3. What necessary steps during excavation work 5 meter deep by Excavat...read more
How long is the Punj Lloyd interview process?

The duration of Punj Lloyd interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Punj Lloyd Interview Process for Experienced

based on 5 interviews

Interview experience

4.4
  
Good
View more

Punj Lloyd Reviews and Ratings

based on 794 reviews

4.3/5

Rating in categories

4.1

Skill development

4.2

Work-life balance

3.9

Salary

4.0

Job security

4.2

Company culture

3.8

Promotions

4.2

Work satisfaction

Explore 794 Reviews and Ratings
Deputy Manager
43 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Manager
36 salaries
unlock blur

₹8 L/yr - ₹18.8 L/yr

Senior Engineer
33 salaries
unlock blur

₹3.8 L/yr - ₹10 L/yr

QA QC Engineer
33 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Engineer
29 salaries
unlock blur

₹2.2 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Punj Lloyd with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview