Filter interviews by
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
GSB stands for Granular Sub-Base, which is a layer of compacted material used in road construction.
GSB is a layer of material placed between the subgrade and the base course of a road.
It provides a stable foundation for the road and helps in distributing the load from the traffic.
The material used in GSB can vary, but it is typically a mixture of crushed stone, gravel, and sand.
GSB is compacted to achieve a high degree...
WMM stands for Wet Mix Macadam, which is a type of road construction material.
WMM is a mixture of aggregates, water, and binding materials.
It is used as a base or sub-base layer in road construction.
WMM provides better strength and durability compared to conventional macadam.
It is designed to withstand heavy traffic loads and adverse weather conditions.
Examples of binding materials used in WMM include cement, lime, or
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
I am working at high way junior engineer at psk infrosturcter at 3 years
NH-340 is a national highway in India connecting two major cities.
NH-340 is a national highway in India.
It connects two major cities.
It is an important route for transportation and commerce.
I appeared for an interview before Feb 2024.
I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.
A structure is a man-made building or construction, while a bridge is a structure built to span physical obstacles such as rivers or roads.
A structure is a man-made building or construction designed to support or enclose something.
A bridge is a structure built to span physical obstacles such as rivers, roads, or valleys.
Structures and bridges are designed by engineers to be safe, durable, and functional.
Examples of str...
My current CTC is confidential and I prefer not to disclose it.
I prefer not to disclose my current CTC as it is confidential information.
I believe that discussing salary details should be done at a later stage in the interview process.
I am more focused on the opportunity and growth potential this role offers rather than my current salary.
PSK Infrastructures interview questions for popular designations
I applied via Walk-in and was interviewed before Feb 2021. There were 3 interview rounds.
posted on 21 Feb 2022
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Jan 2016. There were 6 interview rounds.
Analytics helps me make informed decisions and achieve my goals in life.
Analytics provides valuable insights and data-driven solutions to complex problems.
Setting goals helps me stay focused and motivated towards achieving personal and professional success.
By analyzing data and setting specific goals, I can track my progress and make necessary adjustments to reach my objectives.
For example, in my previous role as a mar...
I appeared for an interview before Jun 2016.
I applied via Walk-in
Yes, Heathrow airport should go ahead with adding a 5th terminal.
Heathrow is one of the busiest airports in the world and needs to expand to accommodate increasing demand.
A 5th terminal would provide more capacity for airlines and passengers, reducing congestion and improving the overall experience.
The construction of the terminal would also create jobs and boost the local economy.
However, careful planning and consider...
I applied via Walk-in
based on 7 interviews
Interview experience
based on 34 reviews
Rating in categories
Accounts Officer
6
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Senior Highway Engineer
5
salaries
| ₹6.2 L/yr - ₹6.6 L/yr |
Senior Structural Engineer
4
salaries
| ₹5.4 L/yr - ₹7.2 L/yr |
Structural Engineer
4
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Safety Officer
4
salaries
| ₹3.6 L/yr - ₹5.3 L/yr |
MagicBricks
State Street Syntel
Sterling & Wilson
AXA Business Services