WFGD stands for Wet Flue Gas Desulfurization. It is a process used to remove sulfur dioxide from exhaust flue gases of fossil-fuel power plants.
WFGD uses a wet scrubbing process to remove sulfur dioxide from flue gas.
The process involves spraying a slurry of limestone or lime into the flue gas to react with sulfur dioxide and form calcium sulfite or sulfate.
The calcium sulfite or sulfate is then removed as a solid wast...
To erect a material, proper planning, equipment, and safety measures are essential.
Plan the erection process in advance to ensure efficiency and safety.
Use appropriate equipment and tools for lifting and positioning the material.
Ensure all workers involved are trained in proper handling techniques and safety procedures.
Inspect the material for any defects or damage before erection to prevent accidents.
Implement safety ...
Current CTC is X and expected CTC is Y.
Current CTC is the salary you are currently earning in your current job.
Expected CTC is the salary you are looking to earn in the new position.
It is important to be honest and realistic about your salary expectations.
You can mention any additional benefits or perks you are looking for in the new role.
For example, Current CTC is 10 LPA and expected CTC is 15 LPA.
Top trending discussions
posted on 31 Jan 2025
I was interviewed in Jan 2025.
posted on 14 Oct 2024
posted on 19 Dec 2024
I worked at XYZ Company as a Senior Engineer. My family background includes a mix of professionals and entrepreneurs.
Worked at XYZ Company as a Senior Engineer
Family background includes professionals and entrepreneurs
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
posted on 14 Jun 2024
I applied via LinkedIn and was interviewed in Feb 2024. There were 4 interview rounds.
How to manage site structure to finishing work
Technical/ mathematics
posted on 13 Jan 2024
I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.
The test procedures for cement, steel, coarse aggregate, and sand involve various physical and chemical tests to ensure quality and suitability for construction purposes.
Cement: Tests include fineness, setting time, compressive strength, soundness, and chemical composition.
Steel: Tests involve tensile strength, yield strength, elongation, and chemical composition.
Coarse Aggregate: Tests include sieve analysis, specific...
The grade of concrete refers to its strength and durability.
Concrete is graded based on its compressive strength, measured in megapascals (MPa).
Common grades of concrete include M10, M15, M20, M25, etc.
The higher the grade, the stronger the concrete.
Different grades of concrete are used for different applications, such as foundations, slabs, columns, etc.
28 days cube strength is a measure of the compressive strength of concrete after 28 days of curing.
28 days cube strength refers to the compressive strength of concrete cubes after they have been cured for 28 days.
It is an important parameter to assess the quality and durability of concrete.
The value of 28 days cube strength is typically expressed in megapascals (MPa) or pounds per square inch (psi).
It is determined by ...
based on 1 interview
Interview experience
Project Engineer
16
salaries
| ₹2 L/yr - ₹6 L/yr |
Electrical Engineer
7
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Site Engineer
5
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Utility & Maintenance Engineer
4
salaries
| ₹3 L/yr - ₹5 L/yr |
Hvac Site Engineer
4
salaries
| ₹1.8 L/yr - ₹3.7 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures