Upload Button Icon Add office photos

Prestige Group

Compare button icon Compare button icon Compare

Filter interviews by

Prestige Group Senior Maintenance Associate Interview Questions and Answers

Updated 26 Aug 2021

Prestige Group Senior Maintenance Associate Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. About Maintenance Experience
  • Q2. How many hours DG B- check to be carried out.
  • Ans. 

    The number of hours required for DG B-check depends on the specific model and manufacturer of the generator.

    • The duration of a DG B-check varies depending on the make and model of the generator.

    • The maintenance manual for the specific generator should provide the recommended duration for a B-check.

    • Factors that can affect the duration of a B-check include the age and condition of the generator, as well as any previous mai...

  • Answered by AI
  • Q3. How will you handle the Residents compliant.
  • Ans. 

    I will listen to their concerns, investigate the issue, and take appropriate action to resolve the complaint.

    • Listen attentively to the resident's complaint

    • Investigate the issue to determine the cause of the complaint

    • Take appropriate action to resolve the complaint

    • Communicate with the resident to ensure their satisfaction with the resolution

    • Document the complaint and resolution for future reference

  • Answered by AI
  • Q4. Meet the residents and do the Needful regarding the compliant.
  • Q5. How will you handle the staff working under you.
  • Ans. 

    I will handle the staff working under me by providing clear expectations, regular communication, and support.

    • Establish clear expectations for performance and behavior

    • Regularly communicate with staff to provide feedback and address concerns

    • Provide support and resources to help staff succeed

    • Lead by example and foster a positive work environment

    • Recognize and reward staff for their achievements

  • Answered by AI
  • Q6. Diploma will be more Advantage in MEP.
  • Q7. If you get a call during late night how will you solve the problem.
  • Ans. 

    I would prioritize the call based on its urgency and take appropriate action to solve the problem.

    • Assess the urgency of the call

    • Identify the problem and potential solutions

    • Take immediate action if necessary

    • Coordinate with relevant team members if required

    • Document the issue and steps taken for future reference

  • Answered by AI
  • Q8. If any break down in lift how will you handle the situation.
  • Ans. 

    I would handle a lift breakdown by following a systematic approach to ensure safety and minimize inconvenience.

    • First, I would assess the situation and determine the cause of the breakdown.

    • Next, I would communicate the issue to the relevant authorities and inform them about the situation.

    • I would then ensure the safety of the passengers by providing clear instructions and assistance.

    • If possible, I would try to troublesho...

  • Answered by AI
  • Q9. Any inquiry to staff you will you handle it.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be bold to answer the questions

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more

I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to building &infrastructure execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Detail execution process, billing related issue, contractor issue, material problem, hr related queries, technical interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Q2. What are the activities, you have handled
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Q2. As per work poliy and methods telling all the process

I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. There are some 5-6 technical questions with safety & quality related 3-4 question

Interview Preparation Tips

Interview preparation tips for other job seekers - First was on site interview conducted by GM & PM
Second HR round with skill test of 25 marks - analytical questions
Third Vice VP Hr -regarding personal information
Fourth was VP - regarding personal infomational like family background & past experience about general work system

I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell me about concrete technology?
  • Ans. 

    Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.

    • Concrete is a composite material made up of cement, water, aggregates, and often other additives.

    • It is widely used in construction for its strength, durability, and versatility.

    • Concrete technology involves understanding the chemical reactions and physical properties of concrete.

    • It includes...

  • Answered by AI
  • Q2. Tell me about yourself?
  • Q3. So I was very scared I somehow gave an introduction in English and then they ask me another question
  • Q4. Your favourite subject
  • Ans. 

    My favorite subject is computer science.

    • I enjoy studying algorithms and data structures.

    • I find programming languages fascinating and love exploring their features.

    • I am passionate about software development and enjoy solving complex problems.

    • I am interested in artificial intelligence and machine learning.

    • I enjoy learning about computer networks and cybersecurity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Then I said a lot I got very positive about what I answer then they ask my family background I said my parents occupation is farmers and I am come from financially poor family and then they got very emotional because my situation was like being emotional they are finally told me that you you are very smart don't give up such preserver as honesty and effort never give up and six days after the interview I got a call from their HR and they ask for family information and immediately my result come on on college email in my class attend interview Six student and me and one girl passed in the interview my parents and I were very happy I got the directly position of senior Executive Engineer in Godrej company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. NBC standard and basic knowledge of plumbing standard.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Tell me about yourself?
  • Q2. Past experience and academic
  • Q3. Software related-AutoCAD and Revit
  • Q4. What is Copy Monitor?
  • Ans. 

    Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.

    • It allows users to monitor and synchronize changes made to linked models.

    • Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.

    • It can also be used to monitor changes to parame...

  • Answered by AI
  • Q5. How do you link Revit models?
  • Ans. 

    Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.

    • Open the host model and go to the 'Insert' tab.

    • Click on 'Link Revit' and select the model to be linked.

    • Choose the appropriate settings for the link, such as positioning and visibility.

    • Repeat the process for any additional models to be linked.

    • Save the host model to ensure the links are maintained.

  • Answered by AI
Round 3 - Assignment 

They gave an architectural model to create a structural model

Round 4 - HR 

(3 Questions)

  • Q1. Why are you changing the company?
  • Q2. What is your expectation?
  • Q3. Will you work for the same salary which you are getting for previous company?

Interview Preparation Tips

Topics to prepare for Sobha Senior Engineer interview:
  • software knowledge
  • REVIT Structure
  • AutoCAD
Interview preparation tips for other job seekers - it is like a government job.. if you like gossips and all you have to consider this company

Prestige Group Interview FAQs

What are the top questions asked in Prestige Group Senior Maintenance Associate interview?

Some of the top questions asked at the Prestige Group Senior Maintenance Associate interview -

  1. How many hours DG B- check to be carried ou...read more
  2. How will you handle the Residents complia...read more
  3. Meet the residents and do the Needful regarding the complia...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 136 Interviews
Lodha Group Interview Questions
4.0
 • 129 Interviews
DLF Interview Questions
4.0
 • 77 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
Casagrand Interview Questions
3.8
 • 58 Interviews
View all

Prestige Group Senior Maintenance Associate Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

3.4

Skill development

5.0

Work-life balance

2.5

Salary

4.6

Job security

4.9

Company culture

3.4

Promotions

1.8

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
81 salaries
unlock blur

₹4.6 L/yr - ₹14.6 L/yr

Deputy Manager
65 salaries
unlock blur

₹5.7 L/yr - ₹15 L/yr

Executive Accountant
35 salaries
unlock blur

₹2.2 L/yr - ₹5.4 L/yr

Senior Executive
32 salaries
unlock blur

₹3.4 L/yr - ₹8.5 L/yr

Project Manager
31 salaries
unlock blur

₹6.7 L/yr - ₹21.5 L/yr

Explore more salaries
Compare Prestige Group with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Godrej Properties

3.7
Compare

Colliers India

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview