PP Rolling Mills Manager PPC Interview Questions and Answers

Updated 8 Mar 2024

PP Rolling Mills Manager PPC Interview Experiences

1 interview found

Manager PPC Interview Questions & Answers

user image Balvinder Singh

posted on 8 Mar 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. TELL ME ABOUT YOUR SELF . WHAT IS YOUR JOB DESCRIPTION .
Round 2 - HR 

(1 Question)

  • Q1. WHY WE HIRE YOU ? WHAT IS YOUR CURRENT SALARY ? SALARY EXPECTED ?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Self introduction
  • Q2. Key project and learning
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How much mam in inches
  • Ans. 

    The question is unclear and does not make sense.

    • The question seems to be incomplete or a typo.

    • It is unclear what 'mam' refers to in this context.

    • It is unclear how 'inches' relates to the unknown 'mam'.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Welding defect and remedy
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is the source name of the laser cutting machine ?
  • Ans. 

    The source name of the laser cutting machine is typically the manufacturer's name or a specific model name.

    • The source name could be the manufacturer's name, such as Trumpf or Amada.

    • It could also be a specific model name, like Trumpf TruLaser Series or Amada LC3015.

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Experience Okay with job description
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via campus placement at Rural Polytechnic, Haunsbhavi and was interviewed in Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Some general knowledge questions

Round 3 - Technical 

(4 Questions)

  • Q1. Mechanical related and lathe machine and CNC machine related questions
  • Q2. Which material is used for cutting tool?
  • Ans. 

    Cutting tools are made of various materials depending on the application.

    • High-speed steel (HSS) is commonly used for general-purpose cutting tools.

    • Carbide is used for cutting hard materials like steel and titanium.

    • Ceramics are used for high-speed cutting of cast iron and other hard materials.

    • Diamond is used for cutting non-ferrous materials like glass and ceramics.

    • Cobalt steel is used for cutting stainless steel and ot

  • Answered by AI
  • Q3. 1mm how much microns?
  • Ans. 

    1mm is equal to 1000 microns.

    • 1mm = 1000 microns

    • Micron is a unit of measurement for length equal to one millionth of a meter

    • Microns are commonly used in manufacturing and engineering applications

  • Answered by AI
  • Q4. Vernier calipers and micro meters related questions?
Round 4 - HR 

(2 Questions)

  • Q1. Why to attend this job?
  • Ans. 

    To attend this job is an opportunity to apply my skills and knowledge in production engineering and contribute to the success of the company.

    • Opportunity to utilize my technical skills and expertise in production engineering

    • Chance to contribute to the success and growth of the company

    • Ability to work on challenging projects and solve complex problems

    • Opportunity for professional development and career advancement

    • Collabora...

  • Answered by AI
  • Q2. Family background and why are you don't going higher education
  • Ans. 

    I come from a supportive family background and chose not to pursue higher education for practical reasons.

    • My family has always been supportive of my decisions and encouraged me to pursue my interests.

    • I decided not to go for higher education because I wanted to gain practical experience in the field of production engineering.

    • I believed that hands-on experience and learning on the job would be more valuable for my career...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interview experience and this is my first interview.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

General technical question

Round 2 - Technical 

(1 Question)

  • Q1. Basics question, technical question. Share Previous working experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be cool focused on self confidence. Present your self honestly. Don't think about interview questions. Just act your natural behavior.

I applied via Approached by Company and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Major NDT Updated technology in fab structures
  • Ans. 

    Digital Radiography and Ultrasonic Testing are major NDT updated technologies in fab structures.

    • Digital Radiography uses digital sensors to capture images of internal structures of materials and components.

    • Ultrasonic Testing uses high-frequency sound waves to detect internal flaws and defects in materials.

    • Both technologies provide faster and more accurate results compared to traditional NDT methods.

    • They also offer the ...

  • Answered by AI
  • Q2. Stress and Strain point analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - More know about knowledge on process and technology updates

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(14 Questions)

  • Q1. What Is oee calculation
  • Ans. 

    OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality metrics.

    • OEE stands for Overall Equipment Effectiveness

    • It is calculated by multiplying availability, performance, and quality percentages

    • OEE helps identify areas for improvement in manufacturing processes

    • Example: If a machine has 90% availability, 95% performance, and 98% quality, its OEE would be 83.79%

    • OEE is...

  • Answered by AI
  • Q2. What is poka yoka and capa
  • Ans. 

    Poka yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.

    • Poka yoke is a Japanese term meaning 'mistake-proofing' or 'error-proofing'. It involves designing a process or system in a way that prevents mistakes or errors from occurring.

    • Poka yoke techniques can include using sensors, alarms, or physical devices to detect and prevent errors.

    • For example, a poka ...

  • Answered by AI
  • Q3. What is difference production and productivity
  • Ans. 

    Production is the process of creating goods or services, while productivity is the measure of efficiency in producing those goods or services.

    • Production refers to the creation of goods or services, while productivity measures the efficiency of that production.

    • Production is a process, while productivity is a measure.

    • Production can be increased by adding more resources, while productivity can be increased by improving pr...

  • Answered by AI
  • Q4. What is tpm and jh and jh 7 steps
  • Ans. 

    TPM stands for Total Productive Maintenance and JH stands for Job Hazard Analysis. JH 7 steps are the steps involved in conducting a JH analysis.

    • TPM is a maintenance strategy aimed at maximizing the productivity of equipment and minimizing downtime.

    • JH is a safety analysis technique used to identify potential hazards in a job or task.

    • JH 7 steps involve breaking down a job into steps, identifying potential hazards, deter...

  • Answered by AI
  • Q5. What is check sheet and wsqc,swc,wes
  • Ans. 

    Check sheet is a tool used to collect and analyze data. WSQC, SWC, and WES are not commonly used acronyms in relation to production engineering.

    • Check sheet is a simple data collection tool used to track defects or issues in a process

    • WSQC, SWC, and WES are not commonly used acronyms in production engineering

    • However, there are similar tools like the 5S methodology or the DMAIC process for continuous improvement

  • Answered by AI
  • Q6. What is 7Qc tools check sheet and parato digram
  • Ans. 

    7QC tools check sheet is a document used to collect and analyze data, while Pareto diagram is a graphical representation of the data.

    • 7QC tools check sheet is used to identify and solve problems in production processes

    • It helps in collecting and analyzing data related to the process

    • Pareto diagram is a bar graph that shows the relative frequency or size of problems in descending order of importance

    • It helps in identifying ...

  • Answered by AI
  • Q7. What is rejection handling and red bin analysis
  • Ans. 

    Rejection handling is the process of identifying and addressing rejected products. Red bin analysis is a method of analyzing rejected products to determine the cause of rejection.

    • Rejection handling involves identifying and segregating rejected products

    • Red bin analysis involves analyzing rejected products to determine the root cause of rejection

    • The data collected during red bin analysis can be used to improve production...

  • Answered by AI
  • Q8. What do you man power handling
  • Ans. 

    Manpower handling refers to managing and organizing the workforce in a production environment.

    • It involves recruiting, training, and scheduling employees

    • Ensuring safety and compliance with regulations

    • Motivating and supervising workers

    • Optimizing productivity and efficiency

    • Dealing with conflicts and resolving issues

    • Examples include managing a production line, overseeing a team of technicians, or coordinating shifts in a f

  • Answered by AI
  • Q9. What is kaizen and capa
  • Ans. 

    Kaizen is a Japanese term for continuous improvement while CAPA stands for Corrective and Preventive Action.

    • Kaizen involves making small, incremental improvements to processes and systems over time.

    • CAPA is a process used to identify and address the root cause of a problem or nonconformity.

    • Kaizen and CAPA are both important tools for improving quality and efficiency in manufacturing and other industries.

    • Examples of kaiz...

  • Answered by AI
  • Q10. What is efficiency in your line
  • Ans. 

    Efficiency in production engineering refers to the ratio of output to input.

    • Efficiency is a measure of how well resources are utilized in the production process.

    • It is calculated as the ratio of output to input.

    • Higher efficiency means more output is produced with the same amount of input.

    • Efficiency can be improved by optimizing processes, reducing waste, and increasing automation.

    • For example, reducing the time it takes ...

  • Answered by AI
  • Q11. What is 4m changing formats
  • Ans. 

    4m changing formats refers to the process of changing the format of a production line from one product to another.

    • It involves reconfiguring the machinery and equipment to accommodate the new product

    • It may require changing the packaging, labeling, and other materials used in the production process

    • It is a common practice in manufacturing to increase efficiency and flexibility

    • Example: Changing a production line from makin

  • Answered by AI
  • Q12. What is kpi instruction
  • Ans. 

    KPI instruction refers to the guidelines or rules that define how key performance indicators (KPIs) should be measured and reported.

    • KPI instruction provides a framework for measuring and reporting KPIs consistently and accurately.

    • It outlines the specific metrics that should be tracked and how they should be calculated.

    • KPI instruction also includes guidelines for setting targets and benchmarks for KPIs.

    • Examples of KPI i...

  • Answered by AI
  • Q13. What is iso - ts audit
  • Ans. 

    ISO-TS audit is a quality management system audit for automotive industry.

    • ISO-TS audit is a quality management system audit for automotive industry

    • It is based on ISO 9001 standard and specific requirements for automotive industry

    • It focuses on ensuring product quality, safety, and customer satisfaction

    • It involves auditing the entire production process from design to delivery

    • Examples of ISO-TS audit include audits of car

  • Answered by AI
  • Q14. What is line and machining processing
  • Ans. 

    Line and machining processing are methods used in manufacturing to produce products efficiently and accurately.

    • Line processing involves a series of steps in which a product is assembled or produced in a linear fashion.

    • Machining processing involves the use of machines to shape and cut materials into specific shapes and sizes.

    • Both methods are used to increase efficiency and accuracy in manufacturing processes.

    • Examples of...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge production department and basic knowledge ERP, excel.,Sap, and basic knowledge maintenance

I applied via Company Website and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Asking about experience our working of 2 year in company and

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn about more and more and improve the skill set

PP Rolling Mills Interview FAQs

How many rounds are there in PP Rolling Mills Manager PPC interview?
PP Rolling Mills interview process usually has 2 rounds. The most common rounds in the PP Rolling Mills interview process are One-on-one Round and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Rostfrei Steels Interview Questions
4.0
 • 32 Interviews
Toshiba Interview Questions
3.9
 • 28 Interviews
SMS Group Interview Questions
4.2
 • 25 Interviews
HYT Engineering Interview Questions
3.2
 • 24 Interviews
Ace Designers Interview Questions
4.0
 • 23 Interviews
View all
Senior Engineer
38 salaries
unlock blur

₹3.4 L/yr - ₹8.5 L/yr

Design Engineer
30 salaries
unlock blur

₹3.5 L/yr - ₹6.2 L/yr

Assistant Manager
29 salaries
unlock blur

₹4.8 L/yr - ₹11 L/yr

Quality Engineer
15 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Deputy Manager
14 salaries
unlock blur

₹7.5 L/yr - ₹13.6 L/yr

Explore more salaries
Compare PP Rolling Mills with

SMS Group

4.2
Compare

Danieli

3.6
Compare

Primetals Technologies

4.4
Compare

Siemens VAI

5.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview