i
PixelQue Software
Filter interviews by
Clear (1)
I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.
Test cases are individual steps to test a specific functionality while test plan is a comprehensive document outlining testing approach.
Test cases are detailed steps to be executed to verify a specific functionality or requirement
Test plan is a high-level document outlining the testing approach, scope, objectives, and timelines
Test cases are derived from the test plan and are used to execute the testing
Test plan is cre...
Bug life cycle is the process of identifying, reporting, fixing, and verifying software defects.
Bug is identified by testers or users
Bug is reported to developers
Developers fix the bug
Testers verify the fix
Bug is closed if fixed or reopened if not
Bug tracking tools are used to manage the process
Software Test Life Cycle (STLC) is a sequence of activities performed to ensure quality in software testing.
STLC includes planning, designing, executing, and reporting of tests.
It starts with the identification of testing requirements and ends with the closure of defects.
STLC ensures that the software meets the specified requirements and is error-free.
It helps in delivering a quality product to the end-users.
STLC is an...
Top trending discussions
posted on 22 Jul 2024
I was interviewed before Sep 2020.
Round duration - 140 minutes
Round difficulty - Medium
Test timing was at 2:00 pm , it was conducted in a college and the environment was good for the test. Camera was a primary part of test, so no suspicious activity.
Given two numbers in the form of two arrays where each element of the array represents a digit, calculate the sum of these two numbers and return this sum as an ar...
Given two numbers represented as arrays, calculate their sum and return the result as an array.
Iterate through the arrays from right to left, adding digits and carrying over if necessary
Handle cases where one array is longer than the other by considering the remaining digits
Ensure the final sum array does not have any leading zeros
Round duration - 20 minutes
Round difficulty - Easy
The round was conducted at around 12 p.m. I was called at the college location and then it was conducted. The interviewer was quite polite and frank.
Round duration - 8 minutes
Round difficulty - Easy
This round was conducted right after finishing and clearing the technical round at the same place and on the same day.
Tip 1 : Practice atleast 2-3 Coding problems daily so your logic building becomes stronger.
Tip 2 : Exercise problems based on OOPS concepts and others too.
Tip 3 : If you can have your own project built, then it's the major point and will act as a plus point.
Tip 1 : Your resume should be in standard form, short and simple will be more effective.
Tip 2 : Whatever you have learned, you need to mention it in your resume as that will be your primary source of selection and having project on your resume is important.
I applied via Campus Placement and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Jul 2020. There was 1 interview round.
Java is platform independent due to its bytecode and JVM.
Java code is compiled into bytecode which is platform-independent.
JVM (Java Virtual Machine) interprets the bytecode and executes it on any platform.
JVM acts as an abstraction layer between the Java code and the underlying hardware.
This allows Java programs to run on any platform that has a JVM installed.
For example, a Java program written on a Windows machine ca...
I applied via Campus Placement and was interviewed in Dec 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Feb 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
Business Analyst
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Software Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Backend Developer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Software QA Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Tech Mahindra
Infosys
TCS
Wipro