Upload Button Icon Add office photos

Filter interviews by

Pioneer Power Systems Project Manager Interview Questions and Answers

Updated 21 Mar 2021

Pioneer Power Systems Project Manager Interview Experiences

1 interview found

Interview Questionnaire 

2 Questions

  • Q1. Technical questions with skills and experience.
  • Q2. I stand for every question asked & showed my skills and strengths.

Interview questions from similar companies

I applied via Job Portal and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. In depth questions on project management processes
Round 3 - Hogan 

(1 Question)

  • Q1. Psychometric assessment

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company and transparent hiring process
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. General introduction
Round 2 - Technical 

(1 Question)

  • Q1. Discussion on PM skills and some case studies
Round 3 - One-on-one 

(1 Question)

  • Q1. Salary negotiation and general HR questions

Interview Questionnaire 

2 Questions

  • Q1. Pullout Test CBR Test ERT paling MMS coordinate survey boundary concrete cube slmp test cement test
  • Q2. No material vestege paling concrete
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Current job profile
  • Ans. 

    Currently working as a Sales Manager at XYZ Company

    • Responsible for leading a team of sales representatives

    • Developing sales strategies to meet targets

    • Analyzing sales data and trends

    • Building relationships with clients and vendors

  • Answered by AI
  • Q2. Roal and responsibilities
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on experience and skils.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

There is general aptitude test.

Round 3 - One-on-one 

(1 Question)

  • Q1. There is technical as well as process questions
Round 4 - One-on-one 

(1 Question)

  • Q1. This is normal round with department head.
Round 5 - HR 

(1 Question)

  • Q1. Salary and other discussion
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Regarding previous experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. What are the tests conducted on power transformers and their applications?
  • Ans. 

    Tests conducted on power transformers include insulation resistance test, turns ratio test, and power factor test.

    • Insulation resistance test checks the insulation of the transformer windings.

    • Turns ratio test verifies the turns ratio between primary and secondary windings.

    • Power factor test measures the efficiency of the transformer in converting power.

    • Other tests include winding resistance test, transformer oil testing,

  • Answered by AI
  • Q2. What are the specifications for a 33 kV transmission line, and how can one select the appropriate specifications?
  • Ans. 

    Specifications for a 33 kV transmission line and how to select appropriate specifications

    • Specifications for a 33 kV transmission line include conductor size, insulation type, tower height, and distance between towers

    • Conductor size should be chosen based on current carrying capacity and voltage drop considerations

    • Insulation type should be selected based on environmental conditions and required insulation levels

    • Tower hei...

  • Answered by AI
  • Q3. What is your job profile and what responsibilities does it entail?
  • Ans. 

    As an Assistant Manager, my job profile involves assisting the manager in overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Assist manager in daily operations

    • Manage staff and delegate tasks

    • Ensure customer satisfaction and handle customer complaints

    • Create work schedules and monitor employee performance

  • Answered by AI
  • Q4. What is relay coordination in electrical systems?
  • Ans. 

    Relay coordination in electrical systems is the process of ensuring that protective relays operate in a coordinated manner to isolate faults while minimizing disruption to the system.

    • Relay coordination involves setting time-current curves for protective relays to ensure that the relay closest to the fault operates first.

    • It is important to coordinate relays to prevent unnecessary tripping of healthy equipment during a f...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The second round focuses on evaluating management skills and responsibilities.

I was interviewed in Sep 2020.

Interview Questionnaire 

1 Question

  • Q1. There was many technical and project related questions they asked me.

Interview Preparation Tips

Interview preparation tips for other job seekers - We should prepare for competency as per our core functions

Tell us how to improve this page.

Pioneer Power Systems Project Manager Reviews and Ratings

based on 2 reviews

4.5/5

Rating in categories

4.0

Skill development

3.5

Work-life balance

3.0

Salary

3.0

Job security

3.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Compare Pioneer Power Systems with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

Adani Group

3.9
Compare

NTPC

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview