Q. How do you calculate motor HP?
Ans. 

Motor HP can be calculated using the formula: HP = (Torque x RPM) / 5252

  • Determine the torque and RPM of the motor

  • Use the formula: HP = (Torque x RPM) / 5252

  • For example, if a motor has a torque of 50 lb-ft and an RPM of 3,000, the HP would be (50 x 3000) / 5252 = 28.6 HP

An Electrician was asked
Q. How do you operate an air compressor?
Ans. 

An air compressor works by converting power into potential energy stored in compressed air.

  • Check the oil level and drain the water from the tank before use

  • Connect the air hose to the compressor and the tool you want to use

  • Turn on the compressor and wait for it to build pressure

  • Adjust the pressure regulator to the desired level

  • Turn off the compressor and disconnect the air hose when finished

Electrician Interview Questions Asked at Other Companies for Experienced

Q1. 1. How much current takes a 5hp motor ?, 2. Draw a STAR DELTA and ... read more
Q2. What is the full form of Crane LT, CT, and HT?
Q3. For what purposes are asynchronous motors used?
Q4. How many types of protection are there in a transformer?
Q5. MCB full form elcb full form rccb full form and mccb full form AC ... read more
An Electrician was asked
Q. How do you calculate KVARH and KVA?
Ans. 

KVARH and KVA can be calculated using different formulas based on the type of circuit and load.

  • For single-phase circuits, KVA = voltage x current x power factor

  • For three-phase circuits, KVA = voltage x current x 1.732 x power factor

  • KVARH is calculated by integrating the reactive power over time

  • KVARH = (KVAR x hours of operation) / 1000

  • KVAR can be calculated using the Pythagorean theorem: KVAR = sqrt(KVA^2 - KW^2)

An Electrician was asked
Q. How does power factor work?
Ans. 

Power factor is the ratio of real power to apparent power in an AC circuit.

  • Power factor can be improved by using capacitors or inductors in the circuit.

  • A high power factor means more efficient use of electricity.

  • Low power factor can result in penalties from utility companies.

  • Power factor correction is important in industrial and commercial settings.

  • Power factor is measured on a scale of 0 to 1, with 1 being ideal.

An Electrician was asked
Q. What is the MIG/MAG welding machine?
Ans. 

MIG/MAG welding machine is a type of welding equipment that uses a consumable wire electrode to create an electric arc for welding.

  • MIG stands for Metal Inert Gas while MAG stands for Metal Active Gas.

  • The machine uses a shielding gas to protect the weld from atmospheric contamination.

  • It is commonly used in automotive and manufacturing industries.

  • MIG/MAG welding is known for its speed and versatility.

  • The machine can...

An Electrician was asked
Q. What is the full form of Crane LT, CT, and HT?
Ans. 

LT stands for Low Tension, CT stands for Current Transformer, HT stands for High Tension.

  • LT - Low Tension refers to electrical systems operating at voltages below 1,000 volts.

  • CT - Current Transformer is a type of instrument transformer used to measure alternating current.

  • HT - High Tension refers to electrical systems operating at voltages above 1,000 volts.

  • Examples: LT cables, CT meters, HT transformers.

An Electrician was asked
Q. What is the chock, Ingnetor, capacitor,?
Ans. 

Chock, Ignitor, and Capacitor are electrical components used in various applications.

  • A chock is an inductor used to limit the flow of current in an electrical circuit.

  • An ignitor is a device used to ignite fuel in combustion engines or lamps.

  • A capacitor is an electrical component used to store energy in an electric field.

  • All three components are commonly used in lighting systems, power supplies, and electronic devi...

Are these interview questions helpful?
An Electrician was asked
Q. Star delta connection Diagrams?
Ans. 

Star delta connection is a method of connecting three-phase electrical motors.

  • Used to reduce starting current and torque

  • Star connection for starting, delta connection for running

  • Commonly used in industrial applications

  • Requires a special motor starter

  • Reduces stress on motor windings

An Electrician was asked
Q. Dial starter connection diagrams?
Ans. 

Dial starter connection diagrams are used to show the wiring connections for a dial starter.

  • The diagrams typically show the power supply connections, control circuit connections, and motor connections.

  • The power supply connections include the incoming power and the power going to the motor.

  • The control circuit connections include the start and stop buttons, overload protection, and any other control devices.

  • The moto...

Phenix Construction Technologies Electrician Interview Experiences for Experienced

1 interview found

Electrician Interview Questions & Answers

user image Anonymous

posted on 2 May 2020

I applied via Company Website and was interviewed before May 2019. There were 4 interview rounds.

Interview Questionnaire 

9 Questions

  • Q1. Dial starter connection diagrams?
  • Ans. 

    Dial starter connection diagrams are used to show the wiring connections for a dial starter.

    • The diagrams typically show the power supply connections, control circuit connections, and motor connections.

    • The power supply connections include the incoming power and the power going to the motor.

    • The control circuit connections include the start and stop buttons, overload protection, and any other control devices.

    • The motor con...

  • Answered by AI
  • Q2. Star delta connection Diagrams?
  • Ans. 

    Star delta connection is a method of connecting three-phase electrical motors.

    • Used to reduce starting current and torque

    • Star connection for starting, delta connection for running

    • Commonly used in industrial applications

    • Requires a special motor starter

    • Reduces stress on motor windings

  • Answered by AI
  • Q3. What is the full form of Crane LT,CT,HT.?
  • Ans. 

    LT stands for Low Tension, CT stands for Current Transformer, HT stands for High Tension.

    • LT - Low Tension refers to electrical systems operating at voltages below 1,000 volts.

    • CT - Current Transformer is a type of instrument transformer used to measure alternating current.

    • HT - High Tension refers to electrical systems operating at voltages above 1,000 volts.

    • Examples: LT cables, CT meters, HT transformers.

  • Answered by AI
  • Q4. How to work Air Compresor?
  • Ans. 

    An air compressor works by converting power into potential energy stored in compressed air.

    • Check the oil level and drain the water from the tank before use

    • Connect the air hose to the compressor and the tool you want to use

    • Turn on the compressor and wait for it to build pressure

    • Adjust the pressure regulator to the desired level

    • Turn off the compressor and disconnect the air hose when finished

  • Answered by AI
  • Q5. What is the MIG/MAG welding machine?
  • Ans. 

    MIG/MAG welding machine is a type of welding equipment that uses a consumable wire electrode to create an electric arc for welding.

    • MIG stands for Metal Inert Gas while MAG stands for Metal Active Gas.

    • The machine uses a shielding gas to protect the weld from atmospheric contamination.

    • It is commonly used in automotive and manufacturing industries.

    • MIG/MAG welding is known for its speed and versatility.

    • The machine can be u...

  • Answered by AI
  • Q6. How to calculate motor HP?
  • Ans. 

    Motor HP can be calculated using the formula: HP = (Torque x RPM) / 5252

    • Determine the torque and RPM of the motor

    • Use the formula: HP = (Torque x RPM) / 5252

    • For example, if a motor has a torque of 50 lb-ft and an RPM of 3,000, the HP would be (50 x 3000) / 5252 = 28.6 HP

  • Answered by AI
  • Q7. What is the chock, Ingnetor, capacitor,?
  • Ans. 

    Chock, Ignitor, and Capacitor are electrical components used in various applications.

    • A chock is an inductor used to limit the flow of current in an electrical circuit.

    • An ignitor is a device used to ignite fuel in combustion engines or lamps.

    • A capacitor is an electrical component used to store energy in an electric field.

    • All three components are commonly used in lighting systems, power supplies, and electronic devices.

  • Answered by AI
  • Q8. How to work power factor?
  • Ans. 

    Power factor is the ratio of real power to apparent power in an AC circuit.

    • Power factor can be improved by using capacitors or inductors in the circuit.

    • A high power factor means more efficient use of electricity.

    • Low power factor can result in penalties from utility companies.

    • Power factor correction is important in industrial and commercial settings.

    • Power factor is measured on a scale of 0 to 1, with 1 being ideal.

  • Answered by AI
  • Q9. How to calculate KVARH and KVA?
  • Ans. 

    KVARH and KVA can be calculated using different formulas based on the type of circuit and load.

    • For single-phase circuits, KVA = voltage x current x power factor

    • For three-phase circuits, KVA = voltage x current x 1.732 x power factor

    • KVARH is calculated by integrating the reactive power over time

    • KVARH = (KVAR x hours of operation) / 1000

    • KVAR can be calculated using the Pythagorean theorem: KVAR = sqrt(KVA^2 - KW^2)

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to prepare before giving interview

Top trending discussions

View All
Interview Tips & Stories
1w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Phenix Construction Technologies?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Sep 2024.

Round 1 - Aptitude Test 

Amazing aptitute test with knowledge of all aspects of the industry

Round 2 - Assignment 

Great assessment of all the interview natures of the assignment for risk, protocol, and valuation.

Interview Preparation Tips

Interview preparation tips for other job seekers - study the technicals and know the industry cold

Electrician Interview Questions Asked at Other Companies for Experienced

Q1. 1. How much current takes a 5hp motor ?, 2. Draw a STAR DELTA and ... read more
Q2. What is the full form of Crane LT, CT, and HT?
Q3. For what purposes are asynchronous motors used?
Q4. How many types of protection are there in a transformer?
Q5. MCB full form elcb full form rccb full form and mccb full form AC ... read more
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Questions related to bitumen testing.
  • Q2. Questions related to material testing
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Achievements, Experience, Projects Handled
  • Q2. Project work executed in last few years
  • Ans. 

    I have executed multiple projects in the last few years.

    • Developed a new website for a client using HTML, CSS, and JavaScript.

    • Created a mobile application for a startup using React Native.

    • Managed a team of developers to build a custom CRM system for a large corporation.

    • Implemented a data analytics solution for a healthcare organization using Python and SQL.

    • Designed and executed a social media marketing campaign for a no...

  • Answered by AI

Interview Questionnaire 

2 Questions

  • Q1. About my company work
  • Q2. About me

Interview Preparation Tips

Round: Resume Shortlist
Experience: technical education
Tips: skill knowdlege

Round: Test
Experience: digital electronics, microprosser, mathmatics,
Tips: objective questions
Duration: 30 minutes
Total Questions: 15

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its...

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

I applied via Job Portal

Interview Questionnaire 

1 Question

  • Q1. Testing related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Are these interview questions helpful?

Interview Questionnaire 

1 Question

  • Q1. Solar renewable energy

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical engineer

Interview Questionnaire 

2 Questions

  • Q1. Engineering drwaiing
  • Q2. HR questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. My Work Experience
  • Q2. My Work Experience Yer

Interview Preparation Tips

Interview preparation tips for other job seekers - No

Phenix Construction Technologies Interview FAQs

What are the top questions asked in Phenix Construction Technologies Electrician interview for experienced candidates?

Some of the top questions asked at the Phenix Construction Technologies Electrician interview for experienced candidates -

  1. What is the full form of Crane LT,CT,H...read more
  2. what is the chock, Ingnetor, capacito...read more
  3. how to calculate KVARH and K...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 128 Interviews
Apco Infratech Interview Questions
3.7
 • 122 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Samsung E&A Interview Questions
4.0
 • 65 Interviews
Wood Group Interview Questions
3.7
 • 63 Interviews
Psp Projects Interview Questions
3.8
 • 61 Interviews
View all
Phenix Construction Technologies Electrician Salary
based on 4 salaries
₹2 L/yr - ₹3 L/yr
8% less than the average Electrician Salary in India
View more details

Phenix Construction Technologies Electrician Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Production Engineer
27 salaries
unlock blur

₹1.8 L/yr - ₹5.2 L/yr

Engineer
18 salaries
unlock blur

₹3.2 L/yr - ₹5.3 L/yr

Senior Engineer
16 salaries
unlock blur

₹4.5 L/yr - ₹9 L/yr

Assistant Manager
14 salaries
unlock blur

₹5.2 L/yr - ₹9 L/yr

Safety Officer
14 salaries
unlock blur

₹3 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Phenix Construction Technologies with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview