I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is determined by Vicat apparatus
It is the time taken for the cement to lose its plasticity and become hard
The standard initial setting time for ordinary Portland cement is 30 minutes
Factors affecting initial setting time include temperature, water-cement ratio, and type of cement
The elongation % of steel fy 500 is approximately 12%.
Elongation % is the measure of ductility of a material.
It is the percentage increase in length of a material before it fractures under tension.
For steel fy 500, the elongation % is approximately 12%.
This means that the steel can stretch up to 12% of its original length before it breaks.
The amount of cement required for 1 cubic meter varies depending on the concrete mix design.
The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.
The mix design specifies the ratio of cement to other materials like sand and aggregates.
For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.
It is important to accurately calculate ...
Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3
Density of steel is higher than that of concrete and sand
Density of concrete varies depending on the mix design
Density of sand can vary depending on the source and moisture content
posted on 23 Dec 2022
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
posted on 13 Jul 2023
The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.
Standard size for concrete cube is 150mm x 150mm x 150mm
Used for testing the compressive strength of concrete
Other sizes may be used for specific projects or requirements
posted on 16 Sep 2022
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
Slump test is a measure of the consistency of fresh concrete.
It is used to determine the workability of concrete.
The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.
The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.
Curing is the process of maintaining moisture in the concrete ...
posted on 1 Oct 2023
I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.
posted on 30 Aug 2021
I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.
posted on 21 May 2023
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
119
salaries
| ₹3.7 L/yr - ₹11 L/yr |
Senior Engineer
113
salaries
| ₹3 L/yr - ₹7.6 L/yr |
Engineer
102
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Production Engineer
91
salaries
| ₹1.6 L/yr - ₹5.7 L/yr |
Quality Engineer
88
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon