Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.
Top trending discussions
I was interviewed before Jul 2016.
I was interviewed before Jul 2016.
I applied via Referral and was interviewed before Dec 2022. There was 1 interview round.
Testing of meter involves ensuring accuracy and functionality.
Calibrate meter regularly to ensure accuracy
Test meter against known standards
Check for any physical damage or wear
Verify proper functioning of all features
Document test results for record keeping
LCO2 plant specification refers to the detailed requirements and characteristics of a plant that produces liquid carbon dioxide.
LCO2 plants are designed to produce and store liquid carbon dioxide.
The plant typically consists of several key components such as compressors, condensers, and storage tanks.
The specification includes details about the plant's capacity, efficiency, and safety features.
It may also cover aspects...
I was interviewed before Apr 2023.
I applied via Referral and was interviewed in Jun 2024. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Engineer
212
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
132
salaries
| ₹0 L/yr - ₹0 L/yr |
Automation Engineer
76
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Foxconn
Quanta Computer
Wistron
Compal Electronics