Filter interviews by
Clear (1)
I applied via Walk-in
Top trending discussions
I applied via Other and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Referral and was interviewed before May 2020. There were 4 interview rounds.
I was interviewed in Nov 2023.
I applied via Walk-in and was interviewed before Nov 2021. There were 9 interview rounds.
What is meaning of ESD,if not using ESD then what is problems?
Meaning of 5s ..what is 5s ,where are using of 5s methods
Acceptable salary depends on experience and industry standards. Company growth is promising with new projects and opportunities.
Acceptable salary varies based on experience, skills, and industry standards.
The company has promising growth with new projects and opportunities.
Salary and growth can be discussed further during the interview process.
The company values employee satisfaction and strives to provide competitive ...
How to prepare for line balance,what is planning in your minds
4C is a business model framework that helps companies analyze and improve their marketing strategies.
4C stands for Customer, Cost, Convenience, and Communication.
It is used to evaluate a company's marketing mix and identify areas for improvement.
For example, a company may use 4C to determine if their product is priced appropriately for their target customer, if it is easily accessible, and if their communication channe...
Planning for line balance and how to control in line running then what is rejection comming the how to control
I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.
I worked as a software engineer at XYZ company.
Developed and maintained software applications
Collaborated with cross-functional teams to identify and solve technical issues
Participated in code reviews and testing
Implemented new features and enhancements
Provided technical support to clients and end-users
Manufacturing layout refers to the arrangement of equipment, machinery, and personnel in a manufacturing facility.
The layout should be designed to optimize production efficiency and minimize waste.
Factors to consider include the flow of materials, the location of storage areas, and the placement of workstations.
Examples of manufacturing layouts include product-oriented, process-oriented, and cellular layouts.
Manufacturing tools are equipment used in the production of goods.
Manufacturing tools include machines such as lathes, milling machines, and drill presses.
Hand tools such as wrenches, pliers, and screwdrivers are also used in manufacturing.
Inspection tools such as calipers and micrometers are used to ensure quality control.
Robotics and automation tools are becoming increasingly common in modern manufacturing.
Examples o...
DMAIC is a Six Sigma methodology used to improve processes by identifying and eliminating defects.
DMAIC stands for Define, Measure, Analyze, Improve, and Control
It is a data-driven approach to problem-solving
It helps in reducing variability and improving quality
Example: DMAIC can be used to improve the efficiency of a manufacturing process by identifying the root cause of defects and implementing solutions to eliminate
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.
10+ years of experience in engineering
Specialize in designing and implementing complex systems
Strong problem-solving skills
Proficient in various programming languages such as Java, Python, and C++
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges and learning opportunities
Seeking better work-life balance
Interested in working with new technologies or industries
I handle manpower by delegating tasks effectively, providing clear instructions, and offering support and guidance when needed.
Delegate tasks based on team members' strengths and expertise
Provide clear instructions and expectations for each task
Offer support and guidance to team members when needed
Regularly communicate with team members to ensure progress and address any issues
Recognize and reward team members for thei
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time to balance workload
Adjust as needed to optimize efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of wo
Electrostatic Discharge (ESD) is the sudden flow of electricity between two electrically charged objects caused by contact, an electrical short, or dielectric breakdown.
ESD can damage electronic components and devices, leading to malfunctions or complete failure.
It can occur when a person touches a metal object after walking on a carpet, or when connecting/disconnecting cables or components.
Preventive measures include ...
I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.
Understand cultural differences, build relationships, communicate clearly and respectfully.
Research and learn about Chinese culture and customs.
Be patient and build relationships before discussing business.
Communicate clearly and respectfully, avoiding direct confrontation.
Be aware of nonverbal communication and body language.
Use a translator if necessary.
Be prepared for negotiations and understand the importance of sa...
based on 2 interviews
Interview experience
based on 13 reviews
Rating in categories
Engineer
212
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
132
salaries
| ₹0 L/yr - ₹0 L/yr |
Automation Engineer
76
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Foxconn
Quanta Computer
Wistron
Compal Electronics