Filter interviews by
I applied via Naukri.com and was interviewed before Nov 2020. There were 2 interview rounds.
Yes, I have experience in site quality inspection as a Civil Engineer.
I have conducted regular inspections to ensure compliance with quality standards and specifications.
I have reviewed construction plans and specifications to identify potential quality issues.
I have performed tests and measurements to verify the quality of materials and workmanship.
I have documented and reported any non-compliance or quality concerns ...
AFS shuttering size may increase during use due to factors like swelling of wood, moisture absorption, and wear and tear.
AFS shuttering size may increase due to the swelling of wood when it absorbs moisture.
Moisture absorption can cause the wood to expand, leading to an increase in shuttering size.
Wear and tear over time can also contribute to an increase in AFS shuttering size.
Increased shuttering size can affect the ...
I applied via Company Website and was interviewed in Jun 2022. There were 6 interview rounds.
Any qustion test gud
Construction rileted
Kam karne ka tarika
Jo bhi work ho raha ho
Fexibel pevment assignment
I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.
M25 concrete is a mix of concrete with a compressive strength of 25 N/mm².
M25 concrete is a standard mix used in construction.
It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.
It has a compressive strength of 25 N/mm² after 28 days of curing.
It is commonly used in the construction of buildings, bridges, and roads.
Rate analysis is the process of determining the cost of materials, labor, and equipment required for plastering and brick work.
Rate analysis involves breaking down the cost of materials, labor, and equipment for a specific project.
For plastering, the cost of materials such as cement, sand, and water must be calculated, along with the cost of labor and equipment such as trowels and scaffolding.
For brick work, the cost o...
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
LD for column refers to Liquidated Damages for delay in completing the column construction.
LD stands for Liquidated Damages.
It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.
LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.
The LD amount is usually mentioned in the cont...
The mix ratio of M20 grade of concrete is 1:1.5:3.
The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.
For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.
This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.
For example, if you have 1 bag of cement (50 kg), you would need 1....
The unit weight of steel varies depending on its type and grade.
The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).
The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).
For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).
The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.
Clear cover is important to protect the reinforcement from corrosion and fire.
The clear cover for beams is typically specified in construction drawings or codes.
The clear cover can vary depending on the type of beam and its exposure conditions.
For example, in a residential building, the clear c...
The height of a parapet wall varies depending on its purpose and location.
The height of a parapet wall is typically determined by building codes and regulations.
In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.
In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.
Historical buildings ...
I applied via Naukri.com and was interviewed before Jul 2023. There were 2 interview rounds.
Experienced sales executive with a proven track record of exceeding targets and building strong client relationships.
Over 5 years of sales experience in the technology industry
Consistently met or exceeded sales targets by 20% each quarter
Built and maintained relationships with key clients such as ABC Company and XYZ Corporation
I have a proven track record of exceeding sales targets and building strong relationships with clients.
I have consistently met or exceeded sales targets in my previous roles.
I have a strong ability to build and maintain relationships with clients, leading to repeat business and referrals.
I am highly motivated and driven to succeed in a competitive sales environment.
Mail writing . The situation was given my the hr
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
I have over 5 years of experience in retail management, leading teams to achieve sales targets and providing excellent customer service.
Managed a team of 15 sales associates in a busy retail store
Implemented new sales strategies which resulted in a 10% increase in revenue
Responsible for inventory management and ensuring stock levels were maintained
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There were 2 interview rounds.
Proficient in Python programming language
Experience in developing applications using Python
Knowledge of Python libraries such as NumPy and Pandas
Familiarity with Python frameworks like Django or Flask
I appeared for an interview in Dec 2024.
My short term goal is to enhance my data analysis skills through continuous learning and practical application.
Enroll in online courses or workshops to learn new data analysis techniques
Seek opportunities to work on real-world data analysis projects
Attend data analysis conferences or networking events to stay updated on industry trends
I applied via Job Portal
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Site Engineer
12
salaries
| ₹2.8 L/yr - ₹4 L/yr |
Project Coordinator
5
salaries
| ₹5.1 L/yr - ₹7.2 L/yr |
Accountant
4
salaries
| ₹2.6 L/yr - ₹3.8 L/yr |
Deputy Project Manager
4
salaries
| ₹4.9 L/yr - ₹5.3 L/yr |
Civil Site Engineer
4
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Balaji Enterprises
Mahaveer Group
Bhumika Group
Nirala Infratech