Upload Button Icon Add office photos

Filter interviews by

Passive Infra Projects Production Engineer Interview Questions and Answers

Updated 27 Apr 2022

Passive Infra Projects Production Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Some basic questions about fabrication line.eg.-Drawing, welding etc
Round 3 - Aptitude Test 

Interview Preparation Tips

Topics to prepare for Passive Infra Projects Production Engineer interview:
  • AutoCAD Drawing
Interview preparation tips for other job seekers - Work hard and always do for the company

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Any questions related ccm
Round 3 - Technical 

(1 Question)

  • Q1. Any questions related mechanical Engineer
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Wire Drawing related
  • Q2. Type of wire manufacturing of process
  • Ans. 

    Wire manufacturing processes include drawing, annealing, stranding, and insulation.

    • Wire manufacturing starts with the drawing process, where a metal rod is pulled through a series of dies to reduce its diameter.

    • Annealing is then performed to relieve stress and improve the wire's ductility.

    • Stranding involves twisting multiple wires together to form a cable or conductor.

    • Insulation is applied to protect the wire and provi...

  • Answered by AI
  • Q3. Technology drafting

Interview Preparation Tips

Interview preparation tips for other job seekers - I am production engineer & still working viraj Profiles LTD.

I applied via Campus Placement and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is fabrication process
  • Ans. 

    Fabrication process is the process of creating a product by assembling, cutting, shaping, and joining materials.

    • It involves assembling, cutting, shaping, and joining materials

    • It can be done manually or with the help of machines

    • Examples include welding, casting, and machining

    • It is used in various industries such as manufacturing, construction, and automotive

  • Answered by AI
  • Q2. Diffrent types of welding process
  • Ans. 

    There are several types of welding processes, including MIG, TIG, Stick, Flux-Cored, and Submerged Arc Welding.

    • MIG (Metal Inert Gas) welding uses a wire electrode and a shielding gas to join two metal pieces together.

    • TIG (Tungsten Inert Gas) welding uses a tungsten electrode and a shielding gas to create a precise and clean weld.

    • Stick welding, also known as Shielded Metal Arc Welding (SMAW), uses a consumable electrode...

  • Answered by AI
  • Q3. Final year project details
  • Q4. Internship details
  • Q5. Measuring instruments basics

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on your introduction and basic of fabrication process
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about your current job profile.
  • Ans. Answer it calmly, since HR wants to know that how much in depth you involve in your project. So answer him about project briefly, from name of project, it's location, main product, it's tonnage, it's capacity etc.
  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. What are different types of steel bridges?
  • Ans. 

    Different types of steel bridges include truss bridges, arch bridges, suspension bridges, and cable-stayed bridges.

    • Truss bridges: made of interconnected triangles for support (e.g. Golden Gate Bridge)

    • Arch bridges: curved structure supporting weight (e.g. Sydney Harbour Bridge)

    • Suspension bridges: main cables supporting the bridge deck (e.g. Akashi Kaikyo Bridge)

    • Cable-stayed bridges: cables directly connected to the brid

  • Answered by AI
  • Q2. What are different axle capacity in open web bridges?
  • Ans. 

    Different axle capacities in open web bridges vary depending on the design and materials used.

    • Axle capacities can range from 10 tons to over 100 tons depending on the bridge design and intended use.

    • Common axle capacities for open web bridges include 20 tons, 40 tons, and 80 tons.

    • Factors such as bridge span, width, and material strength influence the axle capacity of a bridge.

  • Answered by AI
  • Q3. What are different IS codes follow to fabricate open web girders?
  • Ans. 

    Different IS codes followed for fabricating open web girders include IS 800:2007, IS 806:1968, and IS 11384:1985.

    • IS 800:2007 - General construction in steel - Code of practice

    • IS 806:1968 - Code of practice for use of steel tubes in general building construction

    • IS 11384:1985 - Code of practice for composite construction

  • Answered by AI
  • Q4. What are different methods of blasting or cleaning of scales of raw material?
  • Ans. 

    Methods of blasting or cleaning scales of raw material include mechanical cleaning, chemical cleaning, and thermal cleaning.

    • Mechanical cleaning involves using abrasive materials like sand or steel shot to physically remove scales from the raw material surface.

    • Chemical cleaning utilizes acids or other chemicals to dissolve and remove scales from the raw material.

    • Thermal cleaning involves using heat to burn off or melt a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Steel Infra Solutions Senior Production Engineer interview:
  • Learn IS codes
  • Have knowledge about the company
Interview preparation tips for other job seekers - Stay calm, hear question properly, if you are not getting question, ask interviewer to ask the question again by saying sorry I don't get you sir please ask again.
Then answer the question in limited words, don't get too much excited while answering.
If you don't know the answer simply accept it or ask interviewer may I guess it. If he allows you then only answer.
Always answer in positive approach.

Best wishes.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. About the life of furnace inhencement.
  • Q2. Temperature control during operation.
  • Ans. 

    Temperature control is crucial for efficient and safe production processes.

    • Temperature control systems must be in place and regularly maintained.

    • Monitoring of temperature levels should be done regularly to ensure consistency.

    • Proper insulation and ventilation should be considered to prevent temperature fluctuations.

    • Temperature alarms and emergency shutdown systems should be installed as a safety measure.

    • Examples of temp...

  • Answered by AI
  • Q3. S/P removal metallurgy

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't use fake experience , be confident during interview. Answer should be clear and short.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Aptitude Test 

Questions related to your position and department

Round 2 - Technical 

(1 Question)

  • Q1. Technical questions related to your skills, experience and knowledge
Round 3 - One-on-one 

(1 Question)

  • Q1. Questions related to previous profile and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with technical questions related to your position and department
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Payment expectations

Interview Preparation Tips

Topics to prepare for Bharat Wire Ropes Senior Production Engineer interview:
  • Wire drawing process
Interview preparation tips for other job seekers - Not good and bad politics
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Iron carbon diagram
  • Ans. 

    Iron carbon diagram shows the phases of iron and carbon at different temperatures.

    • Iron carbon diagram is a graphical representation of the phases of iron and carbon at different temperatures.

    • It helps in understanding the microstructure of steel and cast iron.

    • The diagram shows the phases such as austenite, ferrite, cementite, and pearlite.

    • It is used in heat treatment processes to control the properties of steel.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - About steel manufacturing
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Wire Drawing related
  • Q2. Type of wire manufacturing of process
  • Ans. 

    Wire manufacturing processes include drawing, annealing, stranding, and insulation.

    • Wire manufacturing starts with the drawing process, where a metal rod is pulled through a series of dies to reduce its diameter.

    • Annealing is then performed to relieve stress and improve the wire's ductility.

    • Stranding involves twisting multiple wires together to form a cable or conductor.

    • Insulation is applied to protect the wire and provi...

  • Answered by AI
  • Q3. Technology drafting

Interview Preparation Tips

Interview preparation tips for other job seekers - I am production engineer & still working viraj Profiles LTD.

Passive Infra Projects Interview FAQs

How many rounds are there in Passive Infra Projects Production Engineer interview?
Passive Infra Projects interview process usually has 3 rounds. The most common rounds in the Passive Infra Projects interview process are Resume Shortlist, HR and Aptitude Test.

Tell us how to improve this page.

People are getting interviews through

based on 1 Passive Infra Projects interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Indus Towers Interview Questions
3.8
 • 165 Interviews
Amalgam Steel Interview Questions
4.3
 • 10 Interviews
Amit Metaliks Interview Questions
3.0
 • 9 Interviews
View all
Passive Infra Projects Production Engineer Salary
based on 14 salaries
₹2.1 L/yr - ₹5 L/yr
At par with the average Production Engineer Salary in India
View more details

Passive Infra Projects Production Engineer Reviews and Ratings

based on 4 reviews

4.9/5

Rating in categories

4.5

Skill development

3.5

Work-Life balance

3.5

Salary & Benefits

4.4

Job Security

4.0

Company culture

3.1

Promotions/Appraisal

3.6

Work Satisfaction

Explore 4 Reviews and Ratings
Production Engineer
14 salaries
unlock blur

₹2.1 L/yr - ₹5 L/yr

Quality Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹3.5 L/yr

Accountant
5 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Mechanical Engineer
5 salaries
unlock blur

₹4.2 L/yr - ₹6.2 L/yr

Site Engineer
5 salaries
unlock blur

₹2.7 L/yr - ₹3.8 L/yr

Explore more salaries
Compare Passive Infra Projects with

Sterlite Technologies

3.8
Compare

Quippo Construction Equipment

4.5
Compare

GTL Infrastructure

4.5
Compare

Indus Towers

3.8
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview