Implement strict quality control measures to reduce unsatisfactory rejection rates.
Implement thorough quality checks at each stage of the process
Train employees on proper procedures and quality standards
Utilize statistical process control methods to monitor and improve quality
Regularly review and analyze rejection data to identify root causes
Collaborate with suppliers to address quality issues upstream
CPH stands for Cycles Per Hour, which is a measure of how many cycles a machine can complete in one hour.
CPH is used to measure the productivity and efficiency of a machine.
It is calculated by dividing the total number of cycles completed by the machine in one hour by the total operating time in hours.
For example, if a machine completes 500 cycles in one hour, its CPH would be 500.
CPH can vary depending on the type of
Aspect ratio is the ratio of the longer side of a rectangle to its shorter side, while area ratio is the ratio of the total area of a shape to the area of a reference shape.
Aspect ratio is calculated by dividing the length of the longer side by the length of the shorter side.
Area ratio is calculated by dividing the total area of a shape by the area of a reference shape.
Aspect ratio formula: Aspect Ratio = Length of Lon...
Padget Electronics interview questions for popular designations
I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.
Get interview-ready with Top Padget Electronics Interview Questions
I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.
SMT mounting flow chart is a visual representation of the steps involved in surface mount technology component mounting process.
SMT components are picked and placed on the PCB using automated equipment.
Components are then soldered onto the PCB using reflow soldering or wave soldering techniques.
Inspection and testing are done to ensure proper component placement and soldering.
Final inspection and quality control checks...
UPH stands for Units Per Hour, Line of Balance is a scheduling technique, PPM stands for Parts Per Million in quality control.
UPH (Units Per Hour) is a measure of productivity in manufacturing, indicating the number of units produced in an hour.
Line of Balance is a scheduling technique used in project management to track progress and ensure resources are allocated efficiently.
PPM (Parts Per Million) is a measure of qua...
I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
Electronics components are individual parts that make up electronic circuits, such as resistors, capacitors, transistors, and diodes.
Electronics components are basic units used in electronic circuits
They can be passive components like resistors, capacitors, and inductors
They can be active components like transistors, diodes, and integrated circuits
Examples include resistors (e.g. 1k ohm), capacitors (e.g. 10uF), transi
ASM machine stands for Automated Surface Mounting machine, used in electronics manufacturing for placing surface mount components onto printed circuit boards.
ASM machines are used in electronics manufacturing for high-speed and accurate placement of surface mount components onto PCBs.
They use vision systems and robotic arms to pick and place components onto the board.
ASM machines are essential for mass production of el...
Maintenance is the process of ensuring that equipment, machinery, or systems are kept in good working condition through regular inspections, repairs, and replacements.
Regularly inspecting equipment to identify any issues or potential problems
Performing routine maintenance tasks such as lubrication, cleaning, and adjustments
Repairing or replacing faulty components to prevent breakdowns and ensure optimal performance
Keep...
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
To achieve production plan, it is important to set clear goals, optimize processes, monitor progress, and make adjustments as needed.
Set clear production goals based on market demand and available resources
Optimize production processes to improve efficiency and reduce waste
Monitor progress regularly using key performance indicators (KPIs)
Make adjustments to production plan as needed based on real-time data and feedback
...
Top trending discussions
Interview experience
based on 419 reviews
Rating in categories
Receptionist
322
salaries
| ₹0.2 L/yr - ₹3 L/yr |
Assistant Engineer
120
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Junior Officer
120
salaries
| ₹1.1 L/yr - ₹3.9 L/yr |
Engineer
118
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Quality Engineer
90
salaries
| ₹1.5 L/yr - ₹4.4 L/yr |
Samsung
LG Electronics
Sony
Panasonic Avionics Corporation