Filter interviews by
Clear (1)
Managing production line involves optimizing processes, ensuring quality control, and minimizing downtime.
Develop and implement standard operating procedures
Monitor production metrics and adjust processes as needed
Train and supervise production staff
Maintain equipment and perform regular maintenance checks
Implement quality control measures
Minimize downtime through efficient scheduling and preventative maintenance
Line rejection can be managed by identifying the root cause, implementing corrective actions, and monitoring the process.
Identify the root cause of rejection
Implement corrective actions to address the root cause
Monitor the process to ensure the corrective actions are effective
Use statistical process control to identify trends and prevent future rejections
I was interviewed before Mar 2023.
I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.
Padget Electronics interview questions for designations
Top trending discussions
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
I applied via Company Website and was interviewed before Sep 2022. There were 3 interview rounds.
posted on 30 Aug 2024
I manage office politics by staying neutral, focusing on work, building strong relationships, and addressing issues directly.
Stay neutral and avoid taking sides in conflicts
Focus on work and maintain professionalism
Build strong relationships with colleagues to create a positive work environment
Address issues directly and communicate openly to resolve conflicts
Seek guidance from HR or management if needed
I applied via Naukri.com and was interviewed in May 2019. There were 4 interview rounds.
I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specific period (e.g. 8 hours per day)
Determine the customer demand for that same period (e.g. 400 units per day)
Divide the total available production time by the customer demand to get the takt time (e.g. 8 hours / 400 units = 0.02 hours per unit)
When a machine stops working, immediate actions should be taken to diagnose and fix the issue to minimize downtime.
Check for any error messages or indicators on the machine
Inspect the machine for any visible damage or loose connections
Refer to the machine's manual for troubleshooting steps
Contact the maintenance team or a technician for assistance if needed
Implement a backup plan to ensure production is not significant
I am looking for a long-term career opportunity and plan to stay with the company for the foreseeable future.
I am committed to contributing to the company's success and growth over the long term.
I am interested in professional development opportunities within the company.
I plan to build strong relationships with colleagues and stakeholders to ensure a successful and fulfilling career.
I am open to discussing potential c...
based on 4 interviews
Interview experience
based on 15 reviews
Rating in categories
Receptionist
322
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
123
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Officer
120
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
111
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Samsung
LG Electronics
Sony
Panasonic Avionics Corporation