Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 13 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
Material planning is the process of determining the materials needed for production and ensuring they are available at the right time.
Forecasting demand based on historical data and market trends
Creating a bill of materials (BOM) listing all components needed for production
Determining order quantities and lead times for materials
Monitoring inventory levels and reordering materials as needed
Collaborating with suppliers
Inventory control is the process of managing and overseeing the ordering, storage, and usage of a company's inventory.
Implementing inventory management software to track stock levels and reorder points
Regularly conducting physical inventory counts to ensure accuracy
Analyzing sales data to forecast demand and adjust inventory levels accordingly
Establishing efficient storage and organization systems to minimize excess in
SCM stands for Supply Chain Management. It involves the planning, coordination, and control of the flow of goods and services from point of origin to point of consumption.
SCM involves managing the flow of goods, information, and finances across the supply chain.
It includes activities such as procurement, production, inventory management, logistics, and distribution.
Effective SCM helps in reducing costs, improving effic...
posted on 31 Mar 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in May 2023. There were 3 interview rounds.
Small, picturesque village nestled in the rolling hills of the countryside.
Located in the southwest region of the country
Population of approximately 500 residents
Known for its annual harvest festival
Surrounded by lush forests and meadows
My final year project involved calculating optimal inventory levels using various forecasting methods.
Used quantitative methods to analyze historical data and predict future demand
Implemented inventory management software to track stock levels and reorder points
Evaluated the effectiveness of different forecasting techniques through statistical analysis
posted on 16 Feb 2024
I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2019. There were 4 interview rounds.
I applied via Company Website and was interviewed before Nov 2021. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
The major cost driver in wiring harness is the cost of raw materials, labor, and complexity of the design.
Cost of raw materials such as copper wires and connectors
Labor costs for assembly and installation
Complexity of the design impacting production time and skill level required
Volume of production affecting economies of scale
based on 1 review
Rating in categories
Process Engineer
5
salaries
| ₹3.8 L/yr - ₹4.6 L/yr |
Mechanical Engineer
5
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Purchasing Head
4
salaries
| ₹4.9 L/yr - ₹5.8 L/yr |
Accountant
4
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Accounts & Finance Manager
4
salaries
| ₹8.9 L/yr - ₹19 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
ArcelorMittal Nippon Steel